Text
(
$VL
'Af
","M,7,'J (412) 923-1960 Nuclear Construction Division l4obinson Plata. Building 2. Suite 210 Telecopy (412) TsT-2629 Pittsburgh, PA 15205 January 29, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 GNLR 84-08 Appeal Meeting Request and Position Statement on the Issue of IE Power for Lighting and Communication Systems Gentlemen:
This letter is in response to the NRC letter dated January 10, 1985 (G. W. Knighton to E. J. Woolever).
In that letter, the NRC staff amplified on the backfit requiring that 1E power be supplied to lighting and communica-tion systems.
The previous staf f position was provided in a November 6, 1984, letter from T.
M.
Novak to E. J. Woolever.
The DLC response to the November 6 letter was provided by DLC letter 2NRC-4-195, dated November 20, 1984. Although the January 10, 1985, letter did not specify a suggested time for implementation, DLC believes th at the staff position is sufficiently defined to warrant scheduling an appeal meeting.
DLC proposes that the first appeal of this issue be scheduled during the week of February 11-15, 1985.
This backfit requitecient was initiated by the Power Systems Branch (PSB), Mechanical Section.
The staff basis for this requirement is in part based on Standard Review Plan (SRP) Section 5.4.7.
The Review Responsibility section of SRP 5.4.7 lists the Reactor Systems Beanch (RSB) as the primary secondary review branch is assigned.
Nuc 1(. ar reviewer for that section; no Reactor Regulation (NRR) Of fice Letter No. 2, Supplement 1, dated October 30, 1981 01.
R.
Denton to all NRR employees), reaffirms these assignments and indicates that these assignments should be fo llo. sed in the licensing review process.
DLC therefore requests that RSB management participate in the appeal meetings on this issue.
The NRR procedure fo r management of plant specif ic backfitting specifies that the appeal meeting agenda be developed from the staff and licensee positions and be distributed prior to any meeting.
An outline of DLC's position on this issue is attached to facilitate the Project Manager's development of such.
DUQUESNE LICHT COMPANY b
By 7
E..l\\ / Wooieve r Vice Fresident g501010115 h[pogg 2
ppg ADOCK 9F 1
0 \\
'Unitcd Stcteo Nuc1ccr R:gulctory Crammicalen
'Mr. D rroll G. Eis;nhut, Dirsctor Page 2 RW/wjs Attachment cc Mr. S. Chesnut, Technical Assistant (w/attachraent)
Mr. M. Clausen, Technical Assistant Mr. H. Denton, Director NRR Mr. T. Novak, Assistant Director Mr. B. K. Singh, Project Manager Mr. V. Stello, DEDROGR Mr. J. Tourte110tte, Chairman RATF Mr. G. Walton, NRC Resident Inspector 3
L k-L
,3 Class lE Power for Lighting and FACE 2 0F 3 ISSUE: Comumanications Systems S6CEFIT ISSUE IBO,r L-84-15_
Dif BACEFIT Iso,t 15 IRC p051T10sl DLC POSIT 10st COMPENTS enn w te lmistsea entetery ses,tt, Compliance with CDC's 19 and 34 has been dio-As stated by the staf f RELAT1018 0F tit. tytetSw,* ese n e
s IElfT 10 ename ser suster t*w ee ligaties me commesec ciese es te.er pient cessed in a previous sectlos.
In a previous section,
""" " I'"'
as =eme 4.=1, sw secte s.s.: ene e.s.3 woe.,sesse me _ _
no CDC's or teg. Cuides EXISTINC 1** "*=" m**e**n*eg*atinoone' "- -tsems synese"s e wseme et ane.or direct.!F 8ppIF to
- 5
"'8 '88'****8 ** ' me esencent s*
- _ met i BSCUIATORY esite, met e,e amusesses, aussyse se anos ene essaet e test as a att se
- lightang, that enclose 3 eses to commDle of se4 sautem amer ett amass of agerettem to 8
pgggyg g m ess*gs meses e= emes.
EE Cassees Yte staff reestrument es met see, et mes team te eemmet fem metere see flest tiene of the Stenere asetes ties (MP) mM/SP l11/2s/754 his emptocetten by amo sesM to enes%3 sat atm se proctkos of tee WP ene staff ansttsee ersetemsly empresse. Tausefore. tats es es onceptism frem tassese Este use Sectten set.
fte staff has smreemos sur past essertonee (Tette t] to the feeten of ttmee systems ese aset east 1conts neue
- tee SAP er esse greetene en etmoresse eerseterne ssess.
A review of SER's for several of the plants listed in Table I failed to identify a plant uttere comformance ts CBC-2 e 34 or 19 had been s
determined in the review of the lighting /
tresrfa6 aus cementorten sv519s e - r=icatione systee.
- 'e 4tierees plants, he=e preetene esamete **,ht% ene 4=munecet1== systems to att -
, set Esentte,ty = teens aress.msce gemoretty con *=== se ame tw womlease. _
sysamme se esseer rolesse areas are taneitsee es "f
e,asessacy Esgatiet sysimms* ene cessest of a sorttes ef t" no, rant Itgnetes sess er a sesoreses, esencesse eyesse. vue emeresurr ?tvt~ sysamme are g==oretty ammerce frem a Class It et emeter SC suuree er from sesseecolly eusst1 totsmer smeAs een caergers amored fra e Ctess 18 senere, h ese ease. que usatens are ess'emme to %msttom ef e-e se* esse ouest.
t Csemamerettens syseums to sehty seleens erees peorotty canetsts of samme smeree syntes, maceos by settery smearee =*=4 treassewers.
t.
etts me 3 "#
1s. smus-2.
= se c,ese no. ws.:
3.
Ceemme 17 usesriere 3 e.
Samanaamme
- 14. Samaramt 5
Opsen 1/7 19 St. teste 2 4
tresemmse 1/2
- 28. Lesatte I/2
=
F.
untos per
- 21. moetese L.ier.te.t.. h, S.
Collem.my 1/2
,22.
.1
. are
- 38. Caimarme mean 2e. amp 3 I' l' St. crime-um rs. mue,re. enree. F
. arene asif us is. euo esse
- 13. his seven 1/2 l
m rry 14 o
i l' Yte es iicent s==e e.s ans., o s s,ure in.: ett e.e-etie.s v4m.s me e.
s si. se.t e ca. no ereemes es e
me ca i==.
t= = *s se l
8eer#*WWat M GP entstep tee getret m, Tiete Stums eso, ta #essee P'est seastsec'9mm etteese.
M fem-e==ry leynt_*=e ene cammeseecetsens oree*eme ** 94 *=me.
I fte commentee**eo system *s actestet'e.w.
Emergree, **e**ee erg tsee t
-.c see w - st+n - e e.g.se.
i l
Class 1E Powee for Lighting and ISSUE:
8%--=icat ions Systems BACNFlf ISSUE Wo.:
L-84-15 DLC BACEFIT NO.t 15 06/25/s4 01/10/85 Sackist W C Rgents Appeal Posataos Meeting First Minutes &
Second Meeting Second Minutes &
Formal identified Letter Filed Statement Agenda A ppeal Decision A ppeal Agenda Appeal Decision A ppeal Submitted leeued Meeting Issued Requested issued Meeting issued Request to Dir MRR e
NRC POSIT 10s DLC POSIT 10r CotetENTS pam la the draft SER (DSER)e RSS found the BV-2 Reactor Systema Branch REQUIREMENTS design in conformance with SRP 5.4.7 with the (RSs) is assigned.eview I*
"" " 8*** ""
7te sortscas esmett, states emot one ssp *4 get a ressegmpt*,e *g euception of a few specific itess mone of which authority for SRP 5.4.7.
e
- 8",s*M's" C'"w". name,um terF,98t#s #86 etract4 e dy *e inClede lightl'4 or Communicat ions. This review no secondary review er moete me so-
% see signtie, s, em, per SRP 5.4.7 determined coa.formance with CDC's branch is assitned.
3' sectie s a.y smee,tammee ame :
-: actie=s ver see, nn tamme 2e 5e 19 and 34.
er'euclear stones emme ett em, ens s e
e oms enen se massee to entee meses DLC has evaluated the e===ts.
fue
___ e ertese e to teos jap sectice ts besse to eart on Sr 3s.
le essettm, set to semesf%s test se up BV-2 FSAR as required by outs ** **e teema==. ines. see.seeman aise to acemmassenso,e,,e,ree neceness t se au se ce to t,e
,2#
10CFR50. 34(g) ineluding lecettees ama agmesee and s assam prest est ameness anfter he.t.
ene laseriments necessary to e ene pie smP secttene s.s.2 ame s.sa pressen the a. dent if a.catson of
- d"gto
""s *r tastellettee of l'emetag one comunecette=s se areas where the guidance g,,
of the SRP has not been "E"""
followed and has pro-the asettesse must emmastrow met ses stant mee tese messen.e to east mes vided description of the enjectue. Its esensis ero men emotiene ser seset,e,*e= t-me F1se a=e manner i.n which the soueH7 seasse se tee sup's If tas, en met se6*sfy the SEP sete8*=us. me teemmese es modelsene.
underlyang regelations antees se siete os aca sect $ ens et ce*%= to ne ser me sm+ee.s.e eme,wse ecceseas4 assis,,,ene rins,en est me e,, e's are met
- _ mta ene egeneew.
FSAR 5.4.7.1 statese"... The RRRS is designed to ROW P90 POSED 33, p.e q,,,,g e,,, q,,,,,,,,,, % %
REQUIREMENT be fully operable from the control room for nor-8e me earttester testames se llettee and sam mal operation, Suseless to ace 4=e se*e pla.nt see,t ene evente,mescattoms. esse et ene stsee i
OD Teos... cees s east es.e an.s.einste e, ems te certees e seesee ect*
n e'een et me o ent.
,secotes tee IMPROTE SA FETY N'd to'#** *j,**e'.** 7M**,,'* '~"* **' *****"* "**** *"8 FSAR 5.4.7.2.6 describes the two inslikely events ander wtaich action outside the coattol room is required. This section also describes how coolir.g Ns ese te foreme-stenf4e =ete e es.et,ss. ne se t one ce t.es
%.e*=e is prowiden metil RNR is initisted. In the DSER ce e=ame4 hos the mee. e* s (5.4.7.1) R$3 evaluated the sv-2 deen.ga and found st w, ant 2.
he
,w e
ca e
e u.a.es==== t.o tw as sm c.
o.-.ss,e se,ene.e
.e.e, =.ee e., se,, in.
t.
ete e
are etfect ave for extended perm.te cooling methods gg ce pteble since the alterna as-eter east,s,o t,= ene.eas.e s tate e.et.,c,*e
.,,,e e gay eme s.ec wia,,
T. amm %
ode of tame.
snese ca.m.: e, -e.
e, e
ee coes.e,ses.ne s es now.. ee ees., e n.e te. e e e,e es, a
t an e.e A % set t e.e act s,,, t e
ae= ne"Sc*=== * *eems se en tw ecem -.e,ca
.t
.,.n esee,e The Illuminatang Engineering Society Lightang s,, to.mo
.em-p==en 85*ts=e to oe *== eis teses one asse***,y e.u =w.cm w e ew teem
- me-Wandbook and the guidance of SRP Sections 9.5.2 and 9.5.3 have been considered in the desiRn of BT-2 lighting and cosmmunicetion systems.
en se, se.t=e cew er see.e, set %, seet 2..no ste f tes est been saw to e
enes.geen,e on tw rsas ese senesesset asettags atta the east
- cent teet thee commesueses systems se une esicotee samer =tetse one access The sv-2 lightins and communication system design opt i
e,e e en sure oe see e.pt we new emme et, ess'ese se teet asenters can prowides multiple and diverse means of lighting secese ene necessee, se*,ty essette g
== net te.e met tesere aselyses one synty.s ese ansetenne eer see=or valie,.>*t t one the **hroottee es esse and comumanicat 'so. With the mult splicity of power I
s.eee, we caen.ecet*,et seese* so.lley em't I ='il retner to mese to te,se sources avallable to 59-2 1a. htang, no signafa.-
er 'h g.
e,m,etleste to tpe ste s us ons..cn asee tee p++v' tan et t*e ser e
.ti ne estieke e e eene e+ee sesreer*m nos+s.
cast bene'it wuld result from requirins seismic e
qualification of power sources to a non-seismic tie p.e.e n,,ece e. ee ene sea r m%e
- cm===*at4.,=s we Metas eset e s s,st-s.e
.res os to eew=*.e test=== asonae se at nos =t tes lighting syatem, cesse.matttttte to tats eogere. % estee ansee. taas %e tes Fsat eens estgees ee engage te ermat9ee to eUse tee stem to eene sete e este.genettee.
e i
M B
=
.g 1
8 N%
8 L
E. e*
3 2
+
'"[
~
a b
E e
i e
s n
.a m
5 mi (J
1 E
.F H
si
~.1, te e O :
lgla
{ns, v
4
.