ML20114D217

From kanterella
Jump to navigation Jump to search
Forwards Vols 1-4 of Tdi Diesel Generator Design Review & Quality Revalidation Rept. Tdi Diesel Generators Presently Installed at Facility Capable of Reliably Performing Intended Safety Function
ML20114D217
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/18/1985
From: Foster D
GEORGIA POWER CO.
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML20114D218 List:
References
GN-508, NUDOCS 8501310103
Download: ML20114D217 (2)


Text

r.

Georgia Power Compegy Route 2. Box 29/)A, e.

Wuynesboro, Georgia 30830 Telephono 404 554-9961. Ext 3360 404 724-8114. Ext. 3360 D. O. Foster Georgia Power a

V c ne*N'dNo[ Project Vogtle Project January 18, 1985 Director of Nuclear Reactor Regulation File: X4AK01 Attention: Ms. Elinor G. Adensam, Chief X4BA17

. Licensing Branch #4 Log: GN-508 Division of Licensing U. S. Nuclear Regulatory Connission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109

'V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 DESIGN REVIEW / QUALITY REVALIDATION REPORT TDI DIESEL GENERATORS

Dear Mr. Denton:

Please find enclosed three (3) copies of the TDI Diesel Generator Design Review and Quality Revalidation (DR/QR) report for the Vogtle Electric

-Generating Plant (VEGP). This report has been prepared by the TDI Diesel Generator Owners' Group for the VEGP Diesel- Generators.

Please refer to the Executive Summary of the DR/QR Report and note that the Owners' Group concluded that the TDI Diesel Generators presently -

. installed 'are fully capable of reliably' performing their intended safety function. The DR/QR Report fonns the basis for this conclusion. The~

report has not been reviewed in detail by Georgia Power Company (GPC) to date, so that submittal of the' report at this time constitutes neither agreeaient nor disagreement on the.part of GPC with the_ recommendations made there_in by the TDI- 0wners' Group. A full-review of the DR/QR report and evaluotion of the recommendations by GPC is now under way.

- Two -(2) copies of the VEGP DR/QR report are also being'sent directly -

- to the NRC's Diesel Generator consultants at Pacific Northwest Laboratories.

Yours tru ..

D. O. Foster js' g i Enclosure ( p S.0

-cc: Listatitached 'he c

35013th,fo PDR AD 4

PDR 8

J

._. "s

. Director' of Nuclear. Reactor Regulation File: X4AK01-Janua ry 18, 1985 X4BA17 Page 2 Log: GN-508 xc : R. : A. Thomas .

J. A. Bailey

,'. G. F. Trowbridge, Esquire J. E. Joiner, Esquire C. - A.' Stangler L. Fowler M. A.- Miller (1)

L. T. Gucwa G. Bockhold, Jr.

C. H. Berlinger (1)

W. W. Laity (2)

W. C. Ramsey

~ .

4 y

1-

-l lc l -.

o t

~

D

?

4 b

~ .<- .- Ak