ML20114B523
| ML20114B523 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/24/1992 |
| From: | Zeringue O TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9208280309 | |
| Download: ML20114B523 (3) | |
Text
.
3 1
s i
i A
j Te'ressee um Asw4 Pum 0%e Bo= Mm Osau AJat am 3wo i
i
{
O J %e* Zenngue yo rwo m ows ry,y cy-y c<3 i
AU6 2 41992 l
I j
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Gentlemen:
i In the Matter of
)
Docket No. 50-296
{
Tennessee Valley Authority
)
a i
BROWNS FERRY NUCLEAR PLANT (BFN) - SCHEDULE FOR APPENDIX R PROGRAM i
SUBMITTAL FOR UNIT 3
)
Reference:
TVA Ictter dated July 11, 1991, "BFN - Overal3~ Action Pirn and Schedule For Appendix R Program for Unit 3" e
i i
As documented in the referenced letter, TVA committed to provide the l
1 Unit 3 Appendix R Safe Shutdown Program and associated analysis for NRC l
review and approval by September 1, 1992. This submittal has been l
rescheduled for December 15, 1992, so that the Unit 3 Appendix R program can include results of Unit 2 modifications planned for the sixth refueling outage.
i A listing of the commitment contained in this letter is provided in l
the enclosure.
If you have any questions, please telephone Raul R. Baron at (205) 729-7566, Sincerely, l
Da J. Zeringue Enclosure cc: See page 2 ph 9208280309 920824 I I 6
PDR ADOCK 05000296 F
- PDR
.. -... - -. -.. =.. -._
j 2
U.S. Nuclear Regulatory Commission j
l AUS 2 41992 I
Enclosure cc (Enclosure):
NRC Resident Inspector Browns Ferry Nuc1 car Plant Rc ne 12, Box 637 Athens, Alabama 35611 Mr. Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Project Chief-U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 l
l l
u l
l
ENCLOSURE
\\
liROWNS PERRY NUCLEAR PLANT UNIT 3 LIST OF COMMITME!rfS
{
i TVA will submit Unit 3 Appendix R program and associated hutdown analysis by December 15, 1992.
l I
i k
s T
e3, e
.y.
7
.-n,-
e.,,...,y.,
,-~~~..--,~me.,,,,w, e h, -r
+
~mm,
.---=,e,,,,v....--w.v-<--.-
.-vr.
==<-
':-w e e t*
-