Provides Amended Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free of Fire Damage to Clarify Original Ltr of 920729
ML20114B450
Person / Time
Site: Beaver Valley
Issue date: 08/21/1992
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-92-001, IEB-92-1, NUDOCS 9208280175
Download: ML20114B450 (1)


Text

'

Duquesne Ucht Company ggy-s-

.,n.pgwnourt PA 1507 7 WX)4 i

1 in4N O S:f M h wo x.,i

u..,, c~

August 21, 1992 U.

S.

Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 BV-1 Docket No. 50-334, License No. DPR-66 NRC Bulletin 92-01 Provided is an amended responce to NRC Bulletin 92-01, "Pailure of Thermo-Lag 330 Fire Barrier System to Maintain Cabling in Wide Cable Trays and Small Conduits Free of Fire Damage" to clarify our original letter of July 29, 1992.

Beaver Valley Power Station Unit 1

utilizes TSI thermo-lag l

material in one fire area for a short section of cable in conduit to meet Appendix R

fire protection requirements.

However, the conduit is five (5) inches in diameter and, as such, does not apply to the compensatory measurec of the Bulletin which considers "small size conduit" as four (4) inches or less in diameter.

If you have any questions concerning this response, please contact John Maracek at (412) 393-5232.

4 f

Very truly yours, I

/I.

D.

Sieber cc:

Mr.

L.

W.

Rossbach, Sr. Resident Inspector Mr.

T.

T. Martin, NRC Region I Administrator Mr. Charles W.

Hehl, Director, Division of Reactor Projects, Region I Mr.

A.

W.

De Agazio, Project Manager 9208280175 920821

/ /