e Long Shoreham Nuclear Power Station is! add P.O. Box 628 4
I Pawer North Country Road pf Authonty Wading River, N.Y.11792 LRM-92-115 August 24, 1992 U.S.
liuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn:
Office of liRR Division of Reactor Inspection and Safeguards Re:
Fitness For Duty Program Performance January-June, 1992.
Dear Sir:
Enclosed is the Shoreham liuclear Power Station's Fitness for Duty
'3 Program Performance data for the reporting period of January-Juno, 1992.
This report is as described in 10 CFR 26.71(d).
Sincerely,
.) $
. M. Hill Resident Manager Shoreham liuclear Power Station LMH/RWG/dh s
Enclosure cc:
Thomas T. Martin Regional Administrator B.
Ilorris Resident Inspector 9208280158 920B24 l\\\\
POR ADOCK 05000322
\\
R PDR
)
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 Long Island Power Aut hority June 30 1992 ceno.ny 8 h D*9 Shoreham Nuclear Power Station Locanon Robe r t b'. Grunseich (SIM C29-8300 Ext. 3206 i
cone nn Pww onewe ese coool Cutotis: StreervConbrmaton (ng'mt)
Q Appendix A to 10CFR 20 Matijuana
/
Amphetamines
/
/
Cocaine
/
Phencyclidine
/
/
Opiates
/
Alcohol (% BAC)
/
Testing Results Long-Term Stort-Term Licensee Employees Contractor Personnel Contractor Personnel Average Numbet with Unesconed Access
- 331 N/A 493 Categories Tested PosttNe Tested Positive Tested Positive Pre-Access 20 0
N/A N/A 410 1
m o
Post accdent 0
0 N/A N/A 0
0 0
Cg Observed behaver 0
0 N/A N/A 1
0 Random 178 3
N/A N/A 250 1
Follow up 21 0
N/A N/A 0
0 i
4 Other 0
0 N/A N/A 0
0 Total 219 3
N/A N/A 661 2
- Average number of perconnel in random selection process REv.1/92
Breakdown of Confirmed Positive Tests for Specific Substances Refusal Amphe-Phiscy-Marijuana
. Cocaine Opiates tamines efidne Alcohol to Test 1
2 3
4 5
0 g/a gf3 N/A g/A gf3 Licensee Employees 0
1 o
o n
3 tong Term contractors gj 373
,j g
,, f,
gj, yf3 yf3 yf,
,. f 3 yf3 f,
sf3 A
3 g
g g
g y
g gf3 373 373 gf3 373 Short-Term Contractors Total' 1
1 0
0 0
3 0
N/A i/A N/A N/A N/A 5
f 9
4 e
h
l 1.
Init_latives Taken During this reporting period,
.he Facility License, NPF-82, was transferred from the Long Island Lighting Company to the Long Island Power Authority.
The basic elements of the Fitness for Duty have remalned intact.
QA Audits and surveillances continue to be scheduled and performed to promote program effectiveness.
2.
Effectiveness Evaluatiqn During the reporting period, there were no instances of finding drugs or alcohol in the secured area of the site, and no allegations regarding drug or alcohol use.
One "for-cause" test was performed, and the results were negative.
It is concluded that the Fitness for Duty Program continues to be effective in meeting its objective of maintaining a safe, drug and alcohol free, work environment.
3.
Data Analysis an_d Actions During the previous reporting period (July 1 - Dec. 31, 1991) an increase in the number of positive pre-badge test results was noted.
This trend has been reversed in this reporting period, as only 1 person out of 430 tested positive in pre-badge testing.
This is attributed to more effective screening of personnel by the Contractor and increased awareness on the part of prospective plant workers that an alcohol and drug free policy exists at Shoreham, and a SNPS Fitness for Duty Program, including random testing, remains in effect.
The actions taken during this period for the positive test results were as follows:
Licensee random positive alcohol test -
o (2 individuals)
Employees were escorted offsite and unescorted access was revoked.
The employees were suspended and referred to the EAP.
Based on their participation in the EAP, and a negative retest, unescorted access has been restored.
These employees are currently enrolled in a follow-up testing program, Licensee random positive drug test - Employee's access o
to the site was revoked for 14 days.
The employee was suspended and referred to the EAP.
Based on his participation in the EAP, and a negative retest, unescorted access was restored.
This employee is currently enrolled in a follow-up testing program.
Contractor pre-badge positive drug test - Access to e
SNPS was denied, Contractor random positive alcohol test - Individual e
was escorted from the site and unescorted access was revoked.
Individual was terminated from work at SNPS.
4.
List of Events Reported No events were reported during this reporting period.