ML20114A265
| ML20114A265 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 11/30/1984 |
| From: | Musolf D, Myrabo A NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8501280039 | |
| Download: ML20114A265 (5) | |
Text
-
=_
a OPERATING DATA REPORT 1
1 DOCKET NO.
50-263______
DATE 12-6 '34____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS l Notes l
________________________Monticelto l
l,
- 1. Unit Name :
- 2. Reporting period: ___________________ NOVEMBER I
l
- 3. Licensed Thermal Power (MWt): ____________1670 1
1,
- 4. Namep late Rat ing (Gross MWe): _____________569 l
1
- 5. Design Electrical Rating (Net MWe): _____545.4 l
l
- 6. Maximum Dependable Capacity (. Gross MWe): __553 l
l
- 7. Maximum Dependable Capacity (Net MWe):
____525 l__________________________I
- 8. If Changes Occur in' Capacity R.3 tings (Items Number 3 Through'7) Since Last Report, Give Reasons: __N/A_____________________________________________
- 9. Power Level To Which Restricted, If Any (Net MWe): ___N/A___________________.
- 10. Reasons For Restrictions, If Any:
__N/A_____________________________________:
i l
=_________________________________________.-_.
1 This Month Yr.-to-Date Cumulative' ii. Hours In Reporting Period
_____720
_____8040
____117649:
- 12. Number Of Hours Reactor Was Cri t ica l 0.1
___ 810.5
__ 89915.4:
- 13. Reactor Reserve-Shutdown' Hours
_____0.0
______0.0
_____940.7'
- 14. Hours Generator On-Line-0.0
___ 808.8
__ 88003.0!
- 15. Unit Reserve Shutdown Hours
_____0.0
______O.0
_______0.0:
- 16. Gross Thermal Energy Generated (MWH) 0 897898
_141233814-
- 17. Gross Electrical Energy Generated (MWH) 0
__ 296117
__45185053
- 18. Net Electrical Energy Generated (MWH)
__ -2362
__ 266507
__43178271
- 19. Unit Service Factor 0.0%
___ 10.1%
____ 74.8%
i
- 20. Uni t Ava i lab i li ty Fac tor 0.0%
___ 10.1%
____ 74.8%
- 21. Unit Capacity Factor (Using MDC Net)
__ -0.6%
6.3%
____ 69.9%'
- 22. Unit Capacity Factor (Using DER Net)
__ -0.6%
6.2%
____ 68.7%
- 23. Unit Forced Outage Rate 0.0%
0.0%
5.3%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
__ February 3, 1984 - Refueling Outage - 286 days ________________________
i
- 25. If Shut Down At End Of Report Eeriod, Estimated Date Of Startup:__12-15-84__i j
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achievedi l
INITIAL CRITICALITY
_______0 INITIAL ELECTRICITY j
COMMERCIAL OPERATION
_______0 8501280039 841130 PDR ADOCK 05000263 R
/
i l
l
4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263______
UNIT MonticelLo__.
DATE 12-6-84____
COMPLETED BY A. L. Myrabo:
TELEPHONE 612/295-5151:
MONTH _____,. NOVEMBER _______
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-3___
17
-6_-__--------
n
_n____________
18
_4____________
3
_o____________
19
-3____________
4
_o____________
90
_9____________
5
_o____.________
9i
_3____________
6
_n____________
nn w____________
7
-4____________
93
-9____________
~
8
-3____________
9~4
_o____________
~
9
-3____________
95
_3____________
10
_4____________
96
_9____________
~
1 1
o7
_o___a________
~
l 1
12
-5____________
28
-9____________
l 13
-5____________
29
-3____________
14
-5____________
30
-5,___________
15
-6____________
31 16
-5____________
1 i
INSTRUCTIONS On this format, List the average daily unit power Level in MWe-Net for each 1 day in the reporting month.
Compute to the nearest whole megawatt.
L l
~-. '
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263______
DATE 12-6-84____
COMPLETED BY A. L. Myrabo-TELEPHONE 612/295-5151 MONTH ______ NOVEMBER _______
it-1-84 to Continuation of 1984 refueling outage.
11-30-84 NOTE: The first of thirty spent fuel shipments was made this month.
SPENT FUEL STORAGE UPDATE Fuel assemblies in core 484 Fuel assemblies in spent fuel storage pool 1996 Licensed capacity 2237 Date of Last refueling that can be 1994 discharge with present capacity Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
i e
e 50-263 DOCKET NO.
UNIT Sill,fTDOWNS AND POWER REDUCTIONS UNIT NAME Pionticello DATE 6-84 COMPLETED gy -A. L: Ffvrnhn REPORT MONTH Novomhny TELEPHONE 612/245-5151
.!?
3 Ek Licensee
$-r Cause & Correceive o
L.
Date g
3g 3
_sy Ewns 3?
f-?
Auion to H
2E 5 d.=!
Repois =
mU 5'
Prevent RecurrcEc,e v
e d
2 2-3-84 i S
720 C
4 N/A ZZZZ ZZZZZZ Continuation of 1984 refueline oitta,qe 1
4 I
-l r
i:
t 3
4 I
2 Method:
[ Exhibii G Instructions F: Forced Reason.
l-Manual for Preparation of Data S: Scheduled A Equipment Failure (Explain) 2-Manual Scram.
Entry Sheets for Licensee B-11aintenance of Tes:
3 Automatic Scram.
Eveni Report iLER) File iNUREG.
C-Refueling D Regulatory Restriction 4-Other (Explain) 01611
~
E-Operator Training & License Examination 5
F-Administrative Exhibit 1 Same Source G Operational Esrur (Explaint 19/77)
Il Other (Explain) 1 i
e
a o
Northem States Power Company 414 Nicollet Mall Minneapohs. Minnesota 55401 Telepnone (612) 330-5500 December 11, 1984 Director, Office of Resource Management U S Nuclear Regulatory Commission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report November, 1984 Attached are twelve copies of the Monthly Operating Report for November, 1984 for the Monticello Nuclear Generating Plant.
Dt.. h David Musolf Manager of Nuclear Support Services DMM/ dab cc:
Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment G1 N 8'
7 py, SIGN g t-f CertiU*
l
.