ML20114A265

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1984
ML20114A265
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/30/1984
From: Musolf D, Myrabo A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8501280039
Download: ML20114A265 (5)


Text

-

=_

a OPERATING DATA REPORT 1

1 DOCKET NO.

50-263______

DATE 12-6 '34____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS l Notes l

________________________Monticelto l

l,

1. Unit Name :
2. Reporting period: ___________________ NOVEMBER I

l

3. Licensed Thermal Power (MWt): ____________1670 1

1,

4. Namep late Rat ing (Gross MWe): _____________569 l

1

5. Design Electrical Rating (Net MWe): _____545.4 l

l

6. Maximum Dependable Capacity (. Gross MWe): __553 l

l

7. Maximum Dependable Capacity (Net MWe):

____525 l__________________________I

8. If Changes Occur in' Capacity R.3 tings (Items Number 3 Through'7) Since Last Report, Give Reasons: __N/A_____________________________________________
9. Power Level To Which Restricted, If Any (Net MWe): ___N/A___________________.
10. Reasons For Restrictions, If Any:

__N/A_____________________________________:

i l

=_________________________________________.-_.

1 This Month Yr.-to-Date Cumulative' ii. Hours In Reporting Period

_____720

_____8040

____117649:

12. Number Of Hours Reactor Was Cri t ica l 0.1

___ 810.5

__ 89915.4:

13. Reactor Reserve-Shutdown' Hours

_____0.0

______0.0

_____940.7'

14. Hours Generator On-Line-0.0

___ 808.8

__ 88003.0!

15. Unit Reserve Shutdown Hours

_____0.0

______O.0

_______0.0:

16. Gross Thermal Energy Generated (MWH) 0 897898

_141233814-

17. Gross Electrical Energy Generated (MWH) 0

__ 296117

__45185053

18. Net Electrical Energy Generated (MWH)

__ -2362

__ 266507

__43178271

19. Unit Service Factor 0.0%

___ 10.1%

____ 74.8%

i

20. Uni t Ava i lab i li ty Fac tor 0.0%

___ 10.1%

____ 74.8%

21. Unit Capacity Factor (Using MDC Net)

__ -0.6%

6.3%

____ 69.9%'

22. Unit Capacity Factor (Using DER Net)

__ -0.6%

6.2%

____ 68.7%

23. Unit Forced Outage Rate 0.0%

0.0%

5.3%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

__ February 3, 1984 - Refueling Outage - 286 days ________________________

i

25. If Shut Down At End Of Report Eeriod, Estimated Date Of Startup:__12-15-84__i j
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achievedi l

INITIAL CRITICALITY

_______0 INITIAL ELECTRICITY j

COMMERCIAL OPERATION

_______0 8501280039 841130 PDR ADOCK 05000263 R

PDR

/

i l

l

4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263______

UNIT MonticelLo__.

DATE 12-6-84____

COMPLETED BY A. L. Myrabo:

TELEPHONE 612/295-5151:

MONTH _____,. NOVEMBER _______

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-3___

17

-6_-__--------

n

_n____________

18

_4____________

3

_o____________

19

-3____________

4

_o____________

90

_9____________

5

_o____.________

9i

_3____________

6

_n____________

nn w____________

7

-4____________

93

-9____________

~

8

-3____________

9~4

_o____________

~

9

-3____________

95

_3____________

10

_4____________

96

_9____________

~

1 1

o7

_o___a________

~

l 1

12

-5____________

28

-9____________

l 13

-5____________

29

-3____________

14

-5____________

30

-5,___________

15

-6____________

31 16

-5____________

1 i

INSTRUCTIONS On this format, List the average daily unit power Level in MWe-Net for each 1 day in the reporting month.

Compute to the nearest whole megawatt.

L l

~-. '

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263______

DATE 12-6-84____

COMPLETED BY A. L. Myrabo-TELEPHONE 612/295-5151 MONTH ______ NOVEMBER _______

it-1-84 to Continuation of 1984 refueling outage.

11-30-84 NOTE: The first of thirty spent fuel shipments was made this month.

SPENT FUEL STORAGE UPDATE Fuel assemblies in core 484 Fuel assemblies in spent fuel storage pool 1996 Licensed capacity 2237 Date of Last refueling that can be 1994 discharge with present capacity Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

i e

e 50-263 DOCKET NO.

UNIT Sill,fTDOWNS AND POWER REDUCTIONS UNIT NAME Pionticello DATE 6-84 COMPLETED gy -A. L: Ffvrnhn REPORT MONTH Novomhny TELEPHONE 612/245-5151

.!?

3 Ek Licensee

$-r Cause & Correceive o

L.

Date g

3g 3

_sy Ewns 3?

f-?

Auion to H

2E 5 d.=!

Repois =

mU 5'

Prevent RecurrcEc,e v

e d

2 2-3-84 i S

720 C

4 N/A ZZZZ ZZZZZZ Continuation of 1984 refueline oitta,qe 1

4 I

-l r

i:

t 3

4 I

2 Method:

[ Exhibii G Instructions F: Forced Reason.

l-Manual for Preparation of Data S: Scheduled A Equipment Failure (Explain) 2-Manual Scram.

Entry Sheets for Licensee B-11aintenance of Tes:

3 Automatic Scram.

Eveni Report iLER) File iNUREG.

C-Refueling D Regulatory Restriction 4-Other (Explain) 01611

~

E-Operator Training & License Examination 5

F-Administrative Exhibit 1 Same Source G Operational Esrur (Explaint 19/77)

Il Other (Explain) 1 i

e

a o

Northem States Power Company 414 Nicollet Mall Minneapohs. Minnesota 55401 Telepnone (612) 330-5500 December 11, 1984 Director, Office of Resource Management U S Nuclear Regulatory Commission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report November, 1984 Attached are twelve copies of the Monthly Operating Report for November, 1984 for the Monticello Nuclear Generating Plant.

Dt.. h David Musolf Manager of Nuclear Support Services DMM/ dab cc:

Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment G1 N 8'

7 py, SIGN g t-f CertiU*

l

.