c+.
mm -
owawenn m SL 1ouc Mn:n D!EE 31M5t h%
\\
INION Eu(xmuc
?"'Q!CR.
auty 28, 1992 s
E U.S.
Nuclear Regulatory Commission Document Control Desk Mail Station P1-137 Washington, DC 20555 ULNRC-2665 DOCKEl' NO. 50-483 CLLLAWAY PLANT OPERATING OUAL_ TTY ABSURANCE MANUA6_F.EVISION 15
Reference:
- 1) ULNkC-2642, Dated June 8, 1992 During NRC review of'the referenced submittal of the Callaway OQAM, Revision 15, it was noted that in Appendix A, regarding' Regulatory Guide 1.37 paragraph C.4, we had included an allowance for sulfur in compounds which contact stainless steel and nickel-based alloys.
Since we had not previously included an allowance for sulfur, the reviewer interpreted this as a lessening of our previous OQAM commitments.
We understand the Reviewer's concern and have revised the submittal to include our basis for the change.
You will note _however, that the allowable sulfur limit in the revised submittal has been lowered from 1500 ppm to 1000ppn.
This limit is consittent with EPRI guidelines.
OQAM Change Notice 92-02 mark-up (Attachmen; 1) has been issued-to delete the proposed change to Position C.4 regarding sulfur liaits frore OQAM, Revisi7n 15.
Furnished herewith for your review and approval is a copy of Change Notice 92-03 to the Callaway Plant Operating. Quality Assurance' Manual (OQAM) consisting of the_following:
1.
OQAM Change-Notice 92-03 mark-up (Attachment 2),
identifying changes through the use of strikeovers.
2.
_ Explanation and justification fcr the change eo the OQAM (Attachment 3).
<10 ~~,20eosotee 92072e
- /p <o 1
. 7
{
PDR ADOCK 050004B3 e
PDR p
C/
1
)
d
ULNRC-2665 Page 2 l
July 28, 1992 These changes were discussed in a telecon between Mr. J. V.
Laux and Mr. Fred Maura on July 22, 1992.
Pursuant to the requirements of 10CFRSO. 54 (a) (3), Union Electric has evaluated these changes and has concluded that the revised OQAM continues to satisfy the requirements of.0CFR50, Appendix B.
However, the revision is interpreted as a lessening of commitment, and requires your approval prior to implementation.
please contact us.
If you have any quest.
(
Very truly yours,
[f/$oa/dk7hs)f,.4[d-m
-m Donald F.
Schnell DFS/JVL/bjp Attachments:
- 1) OQAM CN 92-02
- 2) OQAM CN 92-03 identification of changes
- 3) Explanation of and justification for preposed change to the OQAM
' -:, c s,
J
~ULNRC-2665 i
Page 3
. July 28, 1992 l
1 cc:
A.
B. Davis d
= Regional Administrator U.S. Nuclear Regulatory Commission j
Region III 799 Roosevelt Road Glen Ellyn, IL 60137 R.-L.
Hague Chief, Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region _III 799 Roosevelt Road Glen'Ellyn, IL 60137
.L.
R.- Wharton USNRC Licensing Project Manager (2 copies)
Office rf-Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail-Stop-13-E Washington,LD.C. 20555 Manager, Electric-Department
. Missouri-Public Service Commission P.O.
Boxj360 Jefferson. City,.MG 65102 B.
L.; Bartlett /D. R..Calhoun.
Resident NRC Inspectors, Callaway Plant Callaway-Resident' Office U.S.~ Nuclear Regulatory-Commission RR-#1=
Steedman, M0'65077 Shaw,.Sittman,-Potts, & Trowbridge w/o 2300 N.
Street,-NW Washington,.D.~C. 20037 L
l.q
8 i I
4-4 ULNRC-2665
-Page-4~
j.;
- July.28,-1992
- STATE OF MISSOURI '
E SS
- CITY OF-ST. LOUIS,
Donald-F. Schnell, of lawful age, being first duly.
sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read.the
- foregoing document and knows-the content thereof; that he has executed the same for and on behalf of said company with full
- power and authority to do so; and that the facts therein stated are true and correct to the best of'his knowledge, inf orr ation, ar:d bellef.
O fi ?ul v)
O By Donsid F.
Schnell Senior Vice President Nuclear SUBSCRIBED and sworn to before me this.2.bf day of M e d<j., 1992.
U y
/ LL Ad.A fKg/
.f g (/
BARBARA J. PFAFF NOTARY PUBLIC, STATE Of MISSOURI MY COMMISSION EXPIRES APRIL 22, 1993 ST. LOUIS COUNTY t
l t-i
!~