Text

,

o

. V OPERATING DATA REPORT DOCKET NO.

50-244 DATE December 12. 1984 COMPLETED BY [$M I M*1M -- -

Andrew E.

McNaihara TELEPHONE 315-524-4446 Ext. 301 OPERATNG STATUS Ginna Station

1. Unit Naae:

GINNA STATION. UNIT #1 Notes The reactor power

2. Reporting Period:

November, 1984 level was maintained at

3. Licensed Thermal Power (MWt):

1520 100% for the report perioc

4. Nameplate Rating (Gross MWe):

490 with two exceptions

5. Design Electrical Rating (Net MWe):

470 detailed on pages 3 and 4.

6. Maximum Dependable Capacity (Gross MWe):

490

7. Maximum Dependable Capacity (Net MWe):

470

8. If Changes Occur in Capacity Ratings (Items Number 3 Inrough 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, if Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to Date Cumulative

11. Ilours In Reporting Period 720 8.040.00 131.616.00
12. Number of Ilours Reactor Was Critical 720 6,104.73 99.704.71
13. Reactor Reserve Shutdown llours 0

56.23 1,687.55*

14. Ilours Generator On-Line 720 6.036.75 97,548.38
15. Unit Reserve Shutdown Ilours 0

0 8.5 *

16. Gross Thermal Energy Generated (MWil) 1,084,032 8,901.00 135,158,769
17. Gross Electrical Energy Generated (MWil) 360,242 2,946,241 44,110,611
18. Net Electrical Energy Generated (MWil) 342.878 2.800.085 41,826,328
19. Unit Service Factor 100%

75.1%

74.1%

20. Unic Availability Factor 100%

75%

74.1%

21. Unit Capacity Factor (Using MDC Net) 101.32%

74.10%

69.31%

22. Unit Capacity Factor (Using DER Net) 101.32%

74.00%

69.30%

23. Unit Forced Outage Rate 0%

4.21%

7.8%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

March 2.

1985 - 60 davs

25. If Shut Down At End Of Report. Period, Estimated Date of Startup:

)

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

  • Cummulative Total Commencing January 1, 1975 46 88 I R EV.

9/ 78) l G501730589 841130 i

PDR ADOCK 05000244 R

PDR I

Ih.

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT

  1. 1, Ginna Station DATE December 12,_ 1984 COMPLETED BY W 4 // 4 / _

' Andrew E.

McNamara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH November, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

477 17.

479 2.

477 18.

479 3.

476 19.

479 4.

477 20.

480 5.

476 21.

479 6.

478 22.

480 7.

478 23.

480 8.

477 24.

480 9.

479 25.

480 10.

478 26.

480 ll.

404*

27.

479 12.

479 28.

479 13.

479 29.

478 14.

479 30.

480 15.

479 31.

16.

480

  • Turbine valve and trip tests.

INSTRUCTIONS' On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

D(X:KET NO.

50-244 UNIT NAME #1,Givna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE De ember 12. 1984-COMPLETED HY p^ ^ ^ " E M M^ - -- -

Andrew E.

McNamara' REPORT MONTH NOVEMBER TELEPilONE 315-524-4446 Ext.301 Ginna Station en 32 TI N In caus. a corr.ctiv.

Lic.ns..

g,.

No.

Date

{

jj 2

]o g j Event

4 Q

Action to e

gz g

Report #

  1. j

!u Prevent Recurrence 2

g u

o 84-6 11/11/84 S

7 hrs.

B N/A HA (Turbin)

Load reduction to approx. 46%

reactor power level to perform turbine valve and trip tests.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Mannat for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction' 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

E G-Operational Error (Explain) 4....

insv. inen H-Other (Explain)

Exhibit 1 - Same Source

y NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT Ginna Station, Unit #1 DATE December 12, 1984 COMPLETED BY A

Andrew E. M'cNE' ara m

TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH November, 1984 The reactor power level vas maintained at 100% for the report period, with two exceptions:

On 11/08/84 the reactor power level was reduced to ~ 95% for a short period of time due to a loss of flow indication of.the "B" Main Feedwates Pump. The power level was returned to 100% after indication was restored.

On 11/11/84 the reactor power level was reduced to ~ 46% for a period of seven hours to perform a series of turbine valve and trip tests.

The power level was restored to 100% after the tests.

i

e-

.* =

GINNA STATION.

-- MAINTENANCE REPORT-

SUMMARY

NOVEMBER, 1984 D'uring the-month of. November, routine maintenance and inspections.were

- performed.

Major work included theLatart of-major preventive maintenance ^

of the 1B Service Water Pump and Motor.

+

t 4

F I

4 I

e 4

i a

E 4

e f

i I

a

}$

+---p

_, y

-_-.y

  1. m3,

-w,.g

.-,.e

-p.-.e-

.p 4

p-s_,,.

.,c.

,w9 e

9%

,e-.g

.-y W

py-tW-t'

e: --

e p

nm 4:<. [' " ~

}%%u qm:1

~ ~ ~7

};,,f; O i.

- %on'a v

Ud!talmv dia sf"'"-

ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y.14649

^%

fruewoNr a.a coerno 546-2700 GINNA STATION December 12, 1984 Director, Office of Management Information and Program Analysis U.S.

NUCLEAR REGULATORY COMMISSION

' Washington, DC 20555

Subject:

Monthly Report for November, 1984 Operating Status Information R.

E.

Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1984.

Very truly yours, b

Bruce Snow Plant Superintendent BAS /eeg Attachments cc Dr. Thomas E. Murley NRC (1) l

{