t I /
e, i
BYRON NUCLEAR POWER STATION UNIT 1 MONTHLY PERFORMANCE REPORT C0fMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 LICENSE NO. NPF-23 yh
\\
f w e aaaa m 1,
R PDR_ _.
'(0036Y)
I.
Monthly Report for Unit One A.
Summ.ary of Operating Experience for Unit One In this reportiny, period, Byron Unit I loaded fuel into the core and installed the reactor vessel head. Currently the Unit is under post core load festiag.
J I
4 (0036Y)
C.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byron One DATE: 12/07/84 COMPLETED BY:
K. Hayes TELEPHONE:
(815)234-5441 MONTH: November, 1984 1.
0 17.
0 2.
0 18.
0 3.
0 19.
0 4.
0 20.
0 5.
0 21.
0 6.
0 22.
0 7.
0 23.
0 8.
0 24.
0 9.
0 25.
0 10.
0 26.
0 11.
0 27.
0 12.
0 28.
0 13.
0 29.
0 14.
0 30.
0 15.
0 31.
16.
O INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note chat when maximum dependable capacity is used for the net electricel rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
l (0625M)
L
B.
OPERATING DATA REPORT DOCKET NO.: 050-454 UNIT: Byron One DATE: 12/07/84 COMPLETED BY:
K. Hayes TELEPHONE:
(815)234-5441 OPERATING STATUS
- 1. ' Reporting Period: November-1984 Gross Hours in Reprting Period: 744 2.
Currently Authorized Power Level (MWt): 170 Max Depend Capacity
.(We-Net): 1129 Design Electrical Rating (MWe-Net): 1175 3.
Power Level to Nhich Restricted (If Any) (MWe-Net): 58.75 4.
Reasons for Restriction (If Any): Condition of Facility Operating License i
NPF-23 THIS MONTH YR M DATE CUMULATIVE 5.- Number of Hours Reactor was Critical 0
0-0 6.
Reactor Reserve Shutdown Hours 0
0 0
7.
Hours Generator on Line 0
0 0
8.
Unit Reserve Shutdown Hours 0
0 0
9.
Gross Thermal Energy Generated (MWH) 0 0
0
- 10. Gross Elec. Energy Generated (MWH) 0 0
0
- 11. Net Elec. Energy Generated (MWH) 0 0
0
- 12. Reactor Service Factor
'O O
-0 f
- 13. Reactor Availability Factor 0
0 6
- 14. Unit Service Factor 0
0.
0 IS. Unit Availability Factor 0
0 0
- 16. Unit Capacity Factor (Using EC) 0 0
0
- 17. Unit Capacity Factor (Using Design MWe) 0 0
0
- 18. Unit Forced Outage Rate 0
0 0
' 19. Shutdowns Scheduled Over Next 6. Months (Type Date, and DurationLof Each)
N/A
- 20. If Shutdown at End of Report Period. Estimated Date of Startup: 'N/A i
- 21. Units in Test Status (Prior to Comunercial Operation):
FORECAST ACHIEVED Initial Criticality 1-1-84' Initial' Electricity Comunercial Operation
.~
~ D.
UNIT SHUTDOWNS AIO PONER REDUCTIONS DOCKET NO.: 050-454 UNIT: Byron One DATE:
12/0~1/84 COMPLETED BY:
K. Hayes.
TELEPHONE:
(815)234-5441 REPORT MONTH: November, 1984 METHOD OF TYPE SHUTTING DONN F: FORCED DURATION THE REACTOR OR CORRBCTIVE NO.
DATE S: SCHEDULED (HOURS)
REASON (1)
REDUCING PONER ACTIONS /COlWEENTS N/A I
(0036Y)
4 E.
UNIQUE REPORTING REQUIREMENTS 1.
Safety / Relief valve operatioris for Uriit Orie.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION Col 0ITION OF EVENT Note i
f
-(0036Y)
A
.s Commonwrith Edison
.Z, i') Byron NucleirStation
- ~ ~ *
'~'
4450 North German Church Road Byron, Illinois 61010 December 14, 1984 1.TR:
BYBON 84-1528 File:
2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Nashington, D.C.
20555 ATTN: Document Control Desk Gentlesen:
Enclosed for your information is the Monthly Performance Report covering Byron Nucleat Power Station for the period covering November 1 through November 30, 1984.
Very truly yours, f,tQAJV R. E. Querio Station Superintendent Byron Nuclear Power Station REQ /KRH/cib Enclosure cc:
J.G. Keppler, NRC, Region III NRC Resident Inspector Byron Gary Ntight, Ill. Dept. of Nuclear Safety D.P. Galle, CBCo D.L. Farrar, CECO INPO Records Centet 4
IlI 1E29