ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Generating Station Date of Exam: 11/5/18 Operating Test No.: 2018-301 A E Scenarios (Crew 1)
P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 2 2 2 3 1 1 0 NOR 1 - 1 2 1 1 1 SRO-I I/C 4578 78 3568 10 4 4 2 (1)
SRO-U MAJ 9 10 9 9 10 11 6 2 2 1 TS 36 - 47 4 0 2 2 RO RX 2 2 - 2 1 1 0 NOR - 1 1 2 1 1 1 SRO-I I/C 45 4578 56 8 4 4 2 (2)
SRO-U MAJ 9 10 9 9 10 11 6 2 2 1 TS - 36 - 2 0 2 2 RO RX - - 2 1 1 1 0 (1) NOR 1 1 - 2 1 1 1 SRO-I I/C 78 45 38 6 4 4 2 SRO-U MAJ 9 10 9 9 10 11 6 2 2 1 TS - - - 0 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Generating Station Date of Exam: 11/5/18 Operating Test No.: 2018-301 A E Scenarios (Crew 2)
P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 2 2 2 3 1 1 0 NOR 1 1 - 2 1 1 1 SRO-I I/C 4578 4578 38 10 4 4 2 (3)
SRO-U MAJ 9 10 9 9 10 11 6 2 2 1 TS 36 36 - 4 0 2 2 RO RX 2 2 2 3 1 1 0 NOR - 1 1 2 1 1 1 SRO-I I/C 45 3568 3468 10 4 4 2 (4)
SRO-U MAJ 9 10 9 10 11 9 10 7 2 2 1 TS - 47 57 4 0 2 2 RO RX - - 2 1 1 1 0 (2) NOR 1 1 - 2 1 1 1 SRO-I I/C 78 45 46 6 4 4 2 SRO-U MAJ 9 10 9 9 10 5 2 2 1 TS - - - 0 0 2 2 RO RX 2 - - 1 1 1 0 (3) NOR - 1 1 2 1 1 1 SRO-I I/C 78 56 38 6 4 4 2 SRO-U MAJ 9 9 10 11 9 10 6 2 2 1 TS - - - 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Generating Station Date of Exam: 11/5/18 Operating Test No.: 2018-301 A E Scenarios (Crew 3)
P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 2 2 2 3 1 1 0 NOR 1 1 - 2 1 1 1 SRO-I I/C 4578 4578 46 10 4 4 2 (5)
SRO-U MAJ 9 10 9 9 10 5 2 2 1 TS 36 36 - 4 0 2 2 RO RX 2 - 2 2 1 1 0 NOR - 1 1 2 1 1 1 SRO-I I/C 45 45 3468 8 4 4 2 (6)
SRO-U MAJ 9 10 9 9 10 5 2 2 1 TS - - 57 2 0 2 2 RO RX - 2 - 1 1 1 0 (4) NOR 1 - 1 2 1 1 1 SRO-I I/C 78 78 38 6 4 4 2 SRO-U MAJ 9 10 9 9 10 5 2 2 1 TS - - - 0 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Generating Station Date of Exam: 11/5/18 Operating Test No.: 2018-301 A E Scenarios (Crew 4)
P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 2 2 2 3 1 1 0 NOR 1 1 - 2 1 1 1 SRO-I I/C 4578 4578 38 10 4 4 2 (7)
SRO-U MAJ 9 10 9 9 10 11 6 2 2 1 TS 36 36 - 4 0 2 2 RO RX 2 2 2 3 1 1 0 NOR - 1 1 2 1 1 1 SRO-I I/C 45 3568 3468 10 4 4 2 (8)
SRO-U MAJ 9 10 9 10 11 9 10 7 2 2 1 TS - 47 57 4 0 2 2 RO RX - - 2 1 1 1 0 (5) NOR 1 1 - 2 1 1 1 SRO-I I/C 78 45 46 6 4 4 2 SRO-U MAJ 9 10 9 9 10 5 2 2 1 TS - - - 0 0 2 2 RO RX 2 - - 1 1 1 0 (6) NOR - 1 1 2 1 1 1 SRO-I I/C 78 56 38 6 4 4 2 SRO-U MAJ 9 9 10 11 9 10 6 2 2 1 TS - - - 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.