ML20113C682
| ML20113C682 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/20/1996 |
| From: | Naslund C UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| RTR-NUREG-1058 ULNRC-3394, NUDOCS 9607020055 | |
| Download: ML20113C682 (2) | |
Text
--
Ca!!away Plant i
Post OMce Box 620 Fulton. Missoun 65251 j
l Union Eucenue June 20,1996
'5 h
ULNRC-3394 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-0001 Gentlemen:
NOTIFICATION OF SNUBBER SAMPLE PLANS 4
FUNCriONAL TEST PROGRAM CALLAWAY PLANT UNIT-1 Ref.
- 1) NUREG-1058 Rev.1, Technical Specifications Callaway Plant, Unit 1, Section 4.7.8
)
- 2) ULNRC - 1162
- 3) ULNRC - 3126
- 4) ULNRC - 3309, Tech Spec Amendment #103
- 5) ULNRC - 3285, FSAR Revision OL - 8 Snubber Technical Specification (reference 1) has been moved to Callaway Plant FS AR Chapter 16, item 16.7.2.1, per references 4 and 5 as part of the Tech Spec Improvement process. FSAR Change Notice #96-007 has subsequently been issued to enhance FSAR Section 16.7.2.1 regarding functional testing for snubbers. Union Electric will be implementing the requirements as set forth below beginning in 1996.
At least once per 18 months, a representative sample of each snubber type will be tested using Plan 2 (37 Plan). An initial sample of 37 mechanical snubbers (Pacific Scientific) will be tested and evaluated against the acceptance criteria. The results of each day's testing will be plotted on Figure 16.7-1 until the point plotted falls in the " Accept" region, or all snubbers have been tested.
9607020055 960620 PDR ADOCK 05000483
[ip-P PDR O
g e
ULNRC-3394
- June 20,1996
.. p.
Any changes to the above sample plan choices by Union Electric - Callaway will be directed in writing to your office in accordance with FSAR 16.7.2.1.
^
a u
D. Naslu, Manager Nuclear Engineering Ihf M &#
KWK/DLB/RLR/kkm cc:
USNRC Document Control USNRC Region III - Regional Administrator USNRC Resident Inspector, Callaway Plant USNRC Licensing Project Manager (2 copies)
Missouri Public Service Commission - Manager, Electric Dept.
Deputy Director, Missouri Department of Natural Resources Shaw, Pittman, Potts & Trowbridge