- , o p neo g g
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066-0001 ENTERGY OPERATIONS. INC.
DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION. UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.120 License No. NPF-38 l
1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The application for amendment by Entergy Operations, Inc. (the licensee) dated August 11, 1995, as supplemented by letter dated February 12, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; that the activities authorized by There is reasonable assurance (i)ithout endangering the health and C.
this amendment can be conducted w safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have i
been satisfied.
9606200262 960624 yDR ADOCK 05000382 PDR l
,, 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-38 is hereby amended to read as follows:
(2) Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.120, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance to be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION t0L bf Chandu P. Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: June 24, 1996 i
i 1
=
ATTACHMENT TO LICENSE AMENDMENT NO. 120 TO FACILITY OPERATING LICENSE NO. NPF-38 1
DOCKET NO. 50-382 i
l Replace the following page of the Appendix A Technical Specifications with the attached page.
The revised page is identified by Amendment number and contains a vertical line indicating the area of change. The corresponding l
overleaf page is also provided to maintain document completeness.
REMOVE PAGE INSERT PAGE 3/4 2-11 3/4 2-11 i
i i
POWER DISTRIB1L]10N LIMITS 3/4.2.0 REACTOR COOLANT COLD LEG TEMPERATURE LIMITINC CONDITION FOR OPERATION l
3.2.6 The reactor coolant cold leg temperature (T,) shall be maintained between 541*F and 558'F.*
l APPLICABILITY: MODE I above 30% of RATED THERMAL POWER.
ACTION:
With the reactor coolant cold leg temperature exceeding its limit, restore the temperature to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 30% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVEILLANCE RE0VIREMENTS 4.2.6 The reactor coolant cold leg temperature shall be determined to be i
within its limit at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- Following a reactor power cutback in which (1) Regulating Groups 5 and/or 6 are dropped or (2) Regulating Groups 5 and/or 6 are dropped and the remaining Regulating Groups (Groups 1, 2, 3, and 4) are sequentially inserted, the upper limit on T, may increase to 568*F for up to 30 minutes.
WATERFORD - UNIT 3 3/4 2-11 AMENDMENT NO.120
POWER DISTRIBUTION LIMITS 3/4.2.7 AXIAL SHAPE INDEX LIMITING CONDITION FOR OPERATION 3.2.7 The AXIAL SHAPE INDEX (AII) shall be maintained within the limits specified in the COLR.
APPLICABILITY: MODE I above 20% of RATED THERMAL POWER.*
ACTION:
With the AXIAL SHAPE INDEX outside the limits specified in the COLR, restore l
the AXIAL SHAPE INDEX to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 20% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.7 The AXIAL SHAPE INDEX shall be determined to be within its limit at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> using the COLSS or any OPERABLE Core Protection Calculator channel.
- See Special Test Exception 3.10.2.
I WATERFORD - UNIT 3 3/4 2-12 AMENDMENT NO. 13,25, 102
- - - - - - -,