Wisconsin 1 Electnc POWER COMPANY Point Beach Nuclear PkJnt 6610 Nuclear Rd., Two Rivers, WI 54241 PBL 96-0120 May 31,1996 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:

DOCKET NOS. 50-266 & 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES l

POINT BEACH NUCLEAR PLANT. UNITS 1 & 2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes which should be filed in your copics of the subject document in accordance with the attached instructions.

Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE." A copy of the affected procedures, with names and numbers deleted, are provided and

{

stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rooms.

Sincerely, e

G.1 Mac teld Manager clb Enclosure cc:

NRC Resident inspector (w/o/c)

Incident Response Center, Region III 9606100006 960531

~

PDR ADOCK 05000266 F

PDR

// )

unnou-> n, cnn

May 31,1996 Nuclear Regulatory Commission Document Control Desk Mail Station PI-137 Washington, DC 20555 Manual:

EPIP Manual No.:

18 Issue Date:

May 31,1996 The following changes have been made to the Emergency Plan Implementing Procedures Manual. Pleasc remove the previous revision (s) and replace them with the current revision (s) that are attached.

1.

EPIP Index, Revision 37.

2.

EPIP Form Index, Revision 32 3.

EPIP 4.3, Emergency Operations Facility (EOF) Activation, Revision 16.

4.

EPIP-4.3a, Emergency Operations Facility Activation Checklist, Revision 3.

The following procedure (s) are being CANCELED. Please remove them from your manual and discard.

5.

EPIP-4.2b, Operations Support Center Team Status, dated 02/91.

AFTER UPDATING YOUR MANUAL, PLEASE SIGN AND RETURN TO Tile DISTRIBUTION CENTER, POINT BEACil NUCLEAR PLANT.

If you have any questions, please call the Distribution Center at Extension 6386,6128 or 6244.

  • * * * * * "Special Distribution Notes * * * * * * *
  • NRC Only - Not For Public Disclosure - Make sure WEs return address is on receipt and an addressed envelope is enclosed.

Distribution Center - PBNP K. M. Thompson /K. A. Krueger/C. L. Braun Date 940 6 c5 o =.2-)

/ 9,?p=

  • POINT BEACH NUCLEAR PLANT EPIP INDEX l

EMERGENCY PLAN IMPLEMENTING Revision 37 PROCEDURES May 31,1996

(~

INDEX BIENNIAL REVIEW /

PROCEDURE REVISION EFFECTIVE CANCELED NUMBER PROCEDURE TITLE NUMBER DATE DATE EPIP 1.0 INITIAL RESPONSE, CLASSIFICATION AND i

i IMMEDIATE ACTIONS 1

EPIP 1.1 Plant Operations Manager: Initial Response.

. 27 C

06/02/95 08/26/94 l

EPIP 1.1.1 Plant Operations Manager Radiological Release Evaluation 15 C

03/01/95 08/26/94 EPIP 1.1.2 Plant Operations Manager, General Emergency -

Protective Actions 9

C 03/01/95 08/26/94 l

EPIP 1.2 Event Classification.

.. 28 R

06/02/95 06/02/95 i

EPIP 1.3 Emergency Event - Immediate Actions.

.21 C

01/01/93 12/15/93 1

EPIP 2.0 OFFSITE NOTIFICATIONS EPIP 2.1 State and County Agency Notification 13 C

04/29/96 12/01/94 l

l EPIP 2.2 NRC Notification..

6 C

12/17/93 12/17/93 l

l l /*

EPIP 3.0 PLANT AND COMPANY PERSONNEL NOTIFICATIONS

! d i

EPIP 3.1 Emergency Event - Plant and Company Personnel l

Notification 10 CANCELED 01/01/93 I

EPIP 3.2 Paging System Operation...

14 I

10/04/95 12/17/93 EPIP 3.3 Notification and Response for Headquarters Support Personnel.

.16 R

03/01/95 12/01/94 EPIP 3.4 Public Information - Notification and Immediate Response...

12 I

12/17/93 12/17/93 EPIP 4.0 EMERGENCY RESPONSE FACILITY ACTIVATION EPIP 4.1 Technical Support Center Activation

. 23 R

08/31/95 12/17/93 l

l EPIP 4.2 Operations Support Center Activation

.9 R

01/01/93 11/05/93 j

l EPIP 4.3 Emergency Operations Facility (EOF) Activation..,, 16 R

05/31/96 05/31/96 1

l EPIP 4.4 Alternate Emergency Operations Facility l

(AEOF) Activation.

.3 R. 03/01/95 12/17/93 i

l EPIP 4.5 Alternate Offsite Health Physics Facility

{

Activation.

1 R

01/09/95 01/09/95 j

EPIP 4.6 Corporate Emergency Center Activation..

.O R

12/01/94 12/01/94 l

1 i

O x a c o 8 -. Y I

NOT FOR PUBLIC DISCLOSURE C = Continuous Use (T - Temporary Change)

I = Information Use Page 1 of 5 R = Reference Use

)

POINT BEACH NUCLEAR PLANT EPIP INDEX EMERGENCY PLAN IMPLEMENTING Revision 37 PROCEDURES May 31,1996 INDEX BIENNIAL REVIEW /

PROCEDURE REVISION EFFECTIVE CANCELED NUMBER PROCEDURE TITLE NUMBER DATE DATE EPIP 5.0 EXPOSURE GUIDELINES AND RADIOIODINE BLOCKING l

EPIP 5.1 Personnel Emergency Dose Guidelines..

8 R

01/01/94 01/01/94 EPIP 5.2 Radiciodine Blocking and Thyroid Dose Accounting..

.8 R

04/09/96 04/09/96 EPIP 5.3 General Emergency - Offsite Agency Notification.... 5 CANCELED 12/17/85 EPIP 6.0 EVACUATION AND ACCOUNTABILITY 1

i EPIP 6.1 Limited Plant Evacuation.

. 12 R

10/04/95 12/17/93 EPIP 6.2 Plant Evacuation To Onsite Assembly Areas

. 16 R

12/01/94 12/17/93 j

EPIP 6.3 Plant and Exclusion Area Evacuation To Offsite l

Assembly Areas..

. 12 R

12/17/93 12/17/93 l

l EPIP 6.4 Evacuation of Emergency Response Facilities l

l v

EPIP 6.4.2 Technical Support Center / Operations Support Center (TSC/OSC) Evacuation......

.2 R

12/17/93 12/17/93 EPIP 6.4.3 Emergency Operations Facility Evacuation.

.6 R

01/01/93 11/05/93 l

EPIP 6.4.4 Offsite Health Physics Facility (OSHPF)

Evacuation..

.4 R

01/01/93 11/05/93 EPIP 6.4.5 Alternate Offsite Health Physics Facility j

Activation..

..O CANCELED 01/23/92 EPIP 6.5 Energy Center Evacuation...

10 R

12/17/93 12/17/93 EPIP 6.6 Personnel Assembly and Accountability.

16 R

03/28/96 03/28/96 EPIP 6.7 Post-Emergency Release ofPersonnel from the I

Plant Site.....

.4 R

12/17/93 12/17/93 l

EPIP 7.0 HEALTH PHYSICS RESPONSE EPIP 7.1 Health PhysicsInitial Response......

.. 4 R

12/17/93 12/17/93 EPIP 7.1.1 Chemistry and Health Physics On-Site Notification and Response.

10 CANCELED 09/13/89 EPIP 7.1.2 Chemistry and Health Physics Offsite l

Notification and Response.

.5 CANCELED 09/13/89 C = Continuous Use (T - Temporary Change)

I = Information Use Page 2 of 5 R = Reference Use

I POINT BEACH NUCLEAR PLANT EPIP INDEX i

EMERGENCY PLAN IMPLEMENTING Revision 37 l

PROCEDURES May 31,1996 O-INDEX BIENNIAL REVIEW /

PROCEDURE REVISION EFFECTIVE CANCELED NUMBER PROCEDURE TITLE NUMBER DATE DATE

/

EPIP 7.1.3 Health Physics Actions by On-Shift HP Technologist Prior to Arrival of Additional Health Physics Support.

10 R

12/17/93 12/17/93 EPIP 7.2 Health Physics Facility Activation EPIP 7.2.1 Activation of the Offsite Health Physics Facility at Site Boundary Control Center.......

. 14 I

12/17/93 12/17/93 EPIP 7.2.2 Activation of Health Physics Facilities at Technical Support Center / Operations Support Center...

13 I

01/31/92 11/05/93 EPIP 7.2.4 Health Physics Communications..

.6 CANCELED 10/31/89 EPIP 7.2.5 Control and Use of Vehicles..

1 CANCELED 09/09/83 EPIP 7.3 Radiological Survey, Sampling and Analysis EPIP 7.3.1 Offsite Airborne Radiation Sampling and Direct Q

Dose Rate Survey Guidelines..

15 R

08/31/95 11/05/93 O

EPIP 7.3.2 Post-Accident Sampling of the Auxiliary Building and Drumming Area Vent Stacks Using the Isokinetic Stack Sampling System...

.2 R

01/31/92 11/05/93 l

EPIP 7.3.3 Post-Accident Sampling of Containment Atmosphere.

.20 CANCELED 09/13/89 EPIP 7.3.4 Movement of Required Chemistry Equipment and Materials to the Technical Support Center Counting Room and Mini-Laboratory.

... 4 CANCELED 09/13/89 EPIP 7.3.5 Post-Accident Sampling of the Auxiliary Building and Drumming Area Vent Stacks Using the Isokinetic Stack Sampling System.

.4 CANCELED 02/06/90 EPIP 7.3.6 Emergency Containment Sump "A" Sampling.

.O CANCELED 09/13/89 EPIP 7.3.7 Estimating Radioiodine Air Concentrations.

..1 R

01/01/93 11/05/93 EPIP 7.4 Emergency Equipment EPIP 7.4.1 Routine Check, Maintenance, Calibration and Inventory Schedule for Health Physics Emergency Plan Equipment.

.7 CANCELED 11/09/83 EPIP 7.4.2 Emergency Plan Equipment Routine Check, Maintenance and Calibration Instructions..

.4 CANCELED 06/08/83 I

C = Continuous Use (T - Temporary Change)

I = Information Use Page 3 of 5 R = Reference Use

' POINT BEACH NUCLEAR PLANT EPIP INDEX EMERGENCY PLAN IMPLEMENTING Revision 37 PROCEDURES May 31,1996 iO INDEX v

BIENNIAL 1

REVIEW /

l PROCEDURE REVISION EFFECTIVE CANCELED NUMBER PROCEDURE TITLE

. NUMBER DATE DATE l

i EPIP 7.4.3 Use of Baird Model 530 Single Channel Iodine Spectrometer to Determine Airborne Iodine l

Activities.

.1 CANCELED 08/31/84 l

EPIP 7.4.3.1 Use of Canberra Model 3100 Series 30 Multichannel Analyzer to Determine AirborneIodine Activities

.O CANCELED 01/21/88 EPIP 7.4.4 AMS-2 Air Particulate, Iodine and Noble Gas Sampler / Detector...

1 CANCELED 03/18/86 l

EPIP 8.0 CHEMISTRY RESPONSE EPIP 8.1 Chemistry Notification and Response.

.3 I

12/17/93 12/17/93 EPIP 8.2 Activation of Chemistry Facilities at Technical Support Center / Operations Support Center..

.2 I

12/17/93 12/17/93 EPIP 8.3 Movement of Chemistry Equipment and Materials to the Technical Support Center Counting j

Room and Mini-Laboratory

.2 I

03/29/93 11/05/93 EPIP 8.4 Sampling & Analysis l

EPIP 8.4.1 Post-Accident Sampling and Analysis of Potentially High Activity Reactor Coolant..

8 C

03/28/96 03/28/96 EPIP 8.4.2 Post-Accident Sampling of Containment Atmosphere

.5 C

08/26/94 12/17/93 EPIP 8.4.3 Emergency Containment Sump "A" Sampling.

.3 I

12/17/93 12/17/93 EPIP 8.4.4 Estimating Radiciodine Air Concentrations...

.O CANCELED 05/04/90 l

EPIP 9.0 EVALUATION OF OFFSITE CONSEQUENCES l

l EPIP 9.1 Emergency Off-Site Dose Estimations.

.. I1 CANCELED 10/31/89 EPIP 9.2 Radiological Dose Evaluation.

.,,. 20 R

01/01/94 01/01/94 EPIP 9.3 Protective Action Evaluation 17 I

01/01/94 01/01/94

\\.

EPIP 10.0 EMERGENCY REENTRY AND DAMAGE ASSESSMENT EPIP 10.1 Emergency Reentry...

. 14 R

12/17/93 12/17/93 EPIP 10.2 Core Damage Estimation.

. 13 R

08/31/95 12/17/93

O C = Continuous Use (T - Temporary Change)

I = Information Use Page 4 of 5 R = Reference Use

i POINT BEACH NUCLEAR PLANT EPIP INDEX EMERGENCY PLAN IMPLEMENTING Revision 37 PROCEDURES May 31,1996 INDEX l

BIENNIAL REVIEW /

PROCEDURE REVISION EFFECTIVE CANCELED NUMBER PROCEDURE TITLE NUMBER DATE DATE EPIP 10.3 Post Accident Containment Ventilation System l

Operation.

.1 C

12/17/93 12/17/93 EPIP 11.0 MEDICAL ASSISTANCE l

EPIP 11.1 Search and Rescue..

10 CANCELED 02/17/89 1

EPIP 11.2 Injured Person's Immediate Care...

.9 I

03/01/95 12/17/93 EPIP 11.3 Offsite Medical Assistance..

14 R

12/17/93 12/17/93 EPIP 11.4 Personnel Decontaminstion...

.O CANCELED 03/19/85 EPIP 12.0 RECOVERY PLANNING EPIP 12.1 Event Termination and Recovery Classification..

.4 R

06/02/95 12/01/94 EPIP 12.2 Recovery - Organization and Responsibility.

.6 R

12/17/93 12/17/93 EPIP 14.1 Testing of Communications Equipment.

..O CANCELED 06/08/83 EPIP 15.1 Employee Training...

1 CANCELED 06/08/83 EPIP 15.2 Offsite Personnel Training....

.. O CANCELED 06/08/83 EPIP 15.3 Drills and Exercises.

.2 CANCELED 06/08/83 EPIP 15.4 Emergency Preparedness Review...

..O CANCELED 06/08/83 APPENDIX A Emergency Plan - Abbreviations and Acronyms.

.5 I

12/17/93 12/17/93 APPENDIX B Radio Operation

.2 R

12/17/93 12/17/93 APPENDIX C Use of Emergency Plan Telephones..

.4 R

04/29/96 04/29/96 C = Continuous Use (T - Temporary Change)

I = Information Use Page 5 of 5 R = Reference Use

POINT BEACH NUCLEAR PLANT EPIP FORM INDEX EMERGENCY PLAN IMPLEMENTING Revision 32 PROCEDURES May 31,1996 INDEX

~

PROCEDURE REVISION EFFECTIVE CANCELED NUMBER _,

FORM TITLE

_ NUMBER DATE DATE EPIP-04 Status Report on Plant Systems and Controls for Affected Unit (Insert behind EPIP 4.1.)

.0 04/29/96 EPIP-05 RMS Status Release Point Monitors (Insert behind EPIP 4.1.)..

...0 03/28/96 EPIP-06 RMS Status Area Type Monitors (Insert behind EPIP 4.1.).

.0 03/28/96 EPIP-07 For X/Q Determination CANCELED 03/85 (Now a worksheet in EPIP 9.2)

EPIP-07 RMS Status Process Monitors (Insert behind EPIP 4.1.)...

.0 03/28/96 EPIP-1.3a Emergency Event - Immediate Actions, Duty Shift Superintendent (Insert behind EPIP 1.3)..

I 12/17/93 EPIP-1.3b Emergency Event - Immediate Actions Duty Technical Advisor (Insert behind EPIP 1.3)....

I 12/01/94 EPIP-1.3c Emergency Event - Immediate Actions Plant Operations Manager (Insert behind EPIP 1.3).

.2 12/01/94 EPIP-1.3d Emergency Event - Immediate Actions Site Manager (Insert behind EPIP 1.3)..

.I 12/01/94 EPIP-1.3e Emergency Event - Immediate Actions Emergency Support Manager (Insert behind EPIP 1.3)....

.3 12/01/94 EPIP-4.1a Technical Support Center Activation Checklist (Insert behind EPIP 4.1.)..

.0 01/01/93 EPIP-4.2a Operations Support Center Activation Checklist (Insert behind EPIP 4.2.)

.0 01/01/93 EPIP-4.2b Operations Support Center Team Status (Insert behind EPIP 4.2)..

CANCELED 05/03/96 EPIP-4.2c Communicator - OSC Activation and Responsibilities (Insert behind EPIP 4.2.)..

,1 12/17/93 EPIP-4.2d Technical Person - OSC Activation and Responsibilities (Insert behind EPIP 4.2.)..

....0 01/01/93 EPIP-4.2e Staff Services Support-OSC Activation and Responsibilities (Insert behind EPIP 4.2.).......

02/91 EPIP-4.2f Operations Support Center Activation Health Physics Support Supervisor-OSC Activation and Responsibilities (Insert behind EPIP 4.2.)..

02/91 EPIP-4.2g Reentry Team Qualification Listing (Insert behind EPIP 4.2.).

.0 01/01/93 g

EPIP-4.3a Emergency Operations Facility Activation V

Checklist (Insert behind EPIP 4.3.).

.3 05/31/96 (T - Temporary Change)

Page1of5 NOT FOR PUBLIC DISCLOSURE l

1 POINT BEACH NUCLEAR PLANT EPIP FORM INDEX EMERGENCY PLAN IMPLEMENTING Revision 32 PROCEDURES May 31,1996

/7 INDEX U

t PROCEDURE REVISION EFFECTIVE CANCELED NUMBER FORM TITLE NUMBER DATE DATE 1

EPIP-4.4a Alternate Emergency Operations Facility Activation Checklist (Insert behind EPIP 4.4.).......

.2 12/17/93 EPIP-4.5a Alternate Offsite Health Physics Facility i

(AOSHPF) Activation Checklist j

(Insen behind EPIP 4.5).

I 12/17/93 EPIP-4.6a Corporate Emergency Center Activation Checklist (Insert behind EPIP 4.6.)...

.0 12/01/94 d

EPIP 5.1a Emergency Plan Dose Authorization...

..I 12/17/93 i

EPIP-6.4.5a Alternate Offsite Health Physics Facility Activation l

(Insert behind EPIP 6.4.5)....

.O CANCELED 01/22/92 j

EPIP-6.6a Accountability Short Form (Insert behind EPIP 6.6.)..

CANCELED 02/88 i

EPIP-6.6b Assembly Area Roster (Insert behind EPIP 6.6.)....

CANCELED 02/88 EPIP-6.6c Assembly Area Designations (Insert behind EPIP 6.6.).

03/25/96 EPIP-6.6d Front Office Accountability Summary iO (Insert behind EPIP 6.6).

.1 03/28/96 O

EPIP-6.6e TSC Accountability Summary (Insert behind EPIP 6.6).

1 03/28/96 EPIP-6.6f NSB Cafeteria Accountability Summary (Insert behind EPIP 6.6).

1 03/28/96 EPIP-6.6g Control Room Accountability Summary (Insert behind EPIP 6.6).

1 03/28/96 i

EPIP-6.6h HP Station Accountability Summary (Insert behind EPIP 6.6)...............

1 03/28/96 EPIP-6.7a Event Involvement Summary j

(Insert behind EPIP 6.7.)..

.. 0 01/31/92 i

EPIP-6.7b Emergency Event Information Sheet 4

(Insert behind EPIP 6.7.).

.. 0 01/31/92 EPIP-6.7c Personnel " Dismissal-From-Site" Briefing i

Checklist (Insert behind EPIP 6.7.)........

..,.. 0 01/31/92 EPIP-7. la -

Health Physics Personnel Assignments (Insert behind EPIP 7.1.)..

1 12/17/93 EPIP-7. lb Emergency Plan Equipment Requiring Transport from the Health Physics Station (Insert behind EPIP 7.1.).

......0 01/31/92 l

O 1

(T - Temporary Change)

Page 2 of 5

)

  • POINT BEACH NUCLEAR PLANT EPIP FORM INDEX EMERGENCY PLAN IMPLEMENTING Revision 32 PROCEDURES May 31,1996

(

INDEX PROCEDURE REVISION EFFECTIVE CANCELED NUMBER FORM TITLE NUMBER DATE DATE EPIP-7.2. la SBCC Radiation Control Team Equipment Inventory and Functional Test Checklist (Insert behind EPIP 7.2.1.).

.3 04/09/96 EPIP-7.2. lb Offsite Mobile Survey Team Equipment Inventory and Functional Test Checklist (Insert behind EPIP 7.2.1.).

I 12/17/93 EPIP-7.2. lc Sample Shuttle Vehicle Equipment Inventory and Functional Test Checklist (Insert behind EPIP 7.2.1.).

.. I 12/17/93 EPIP-7.2.1d Offsite Health Physics Facility Offsite Health Physics Director Checklist (Insert behind EPIP 7.2.1.).

I 12/17/93 EPIP-7.2. l e Dosimetry Device Issue Record and Exposure Log i

(Insert behind EPIP 7.2.1.)...

05/90 EPIP-7.2. lf Meteorologit al Data.

.0 01/31/92 EPIP-7.3.la Offsite Airborne Radiation Survey Sample Analysis (Insert behind EPIP 7.3.1.)..

1 01/01/93 EPIP-7.3. lb Ground Deposition (Insert behind EPIP 7.3.1.).

.0 01/31/92 EPIP-7.3.1c Dose Factor Calculations For Specific Noble Gas Analysis Results (Insert behind EPIP 7.3.1.)....

.0 01/31/92 EPIP-7.3. ld Offsite Airborne Radiation Survey Sample Data (Insert behind EPIP 7.3.1).

.0 01/31/92 EPIP-08 Estimated Whole Body and Thyroid Projected Doses (Now a worksheet in EPIP 9.2).

CANCELED 03/85 EPIP-8.4. la Reactor Coolant Post Accident Sampling Analysis Report (Insert behind EPIP 8.4.1.).

.. 3 03/28/96 EPIP-8.4.2a Containment Atmosphere Post-Accident Sampling Analysis Report (Insert behind EPIP 8.4.2.)....

.....0 12/17/93 1

EPIP-09 Estimated Whole Body Dose Calculation Worksheet for Specific Noble Gas Releases.

- CANCELED 03/85 (Now a worksheet in EPIP 9.2)

EPIP-9.2a Estimated Population Dose (Insert behind EPIP 9.2.)..

CANCELED 12/30/93 EPIP-9.2b Summary of Radiological Dose Evaluation Calculations (Insert behind EPIP 9.2.)..

CANCELED 12/30/93 O

i (T - Temporary Change)

Page 3 of 5 j

POINT BEACH NUCLEAR PLANT EPIP FORM INDEX EMERGENCY PLAN IMPLEMENTING Revision 32 PROCEDURES May 31,1996 INDEX PROCEDURE REVISION EFFECTIVE CANCELED NUMBER FORM TITLE NUMBER DATE DATE EPIP-10 Estimated Ground Deposition Calculation Worksheet for Particulate Radionuclide Releases..

CANCELED 03/85 (Now a worksheet in EPIP 9.2)

EPIP-10. la Reentry Team Preparation and Deployment (Insert behind EPIP 10.1.).

.I 12/17/93 EPIP-10. lb Reentry Team Debrief (Insert behind EPIP 10.1.)... I 12/17/93 EPIP-11. l a Search and Rescue / Emergency Reentry Checklist (Insert behind EPIP 11.1.)..

CANCELED 03/90 EPIP-11. lb Search and Rescue / Emergency Reentry Team Dispatch Checklist (Insen behind EPIP 11.1.)..

CANCELED 03/90 EPIP-11.3a Offsite Medical Assistance Checklist (Insert behind EPIP 11.3.)....

2 12/17/93 EPIP-11.3b Health Physics Response Checklist Ambulance Assistance (Insert behind EPIP 11.3.)..

1 01/01/93 EPIP-11.3c Health Physics Response Checklist Nuclear First Aid Room (NFAR) (Insert behind EPIP 11.3.)...2 12/17/93 EPIP-12 Incident Report Form (Insert behind EPIP 2.1.).

.7 03/01/95 O

EPIP-13 Status Update - Plant Form (Insert behind EPIP 2.1.).

.2 03/01/95 EPIP-13a Status Update - Radiological Form (Insen behind EPIP-13, behind EPIP 2.1).

.0 03/01/95 EPIP-14 Event Notification Worksheet (Insert behind EPIP 2.2.)..

05/90 EPIP-22 Plant Personnel Emergency Call List (Insert behind Call List Tab.).

.. 19 03/28/96 EPIP-23 Offsite Agency Emergency Call List (Insert behind Call List Tab.).

.... I 8 03/28/96 EPIP-24 Emergency Response Facility Telephone i

Directory.

... I 1 10/04/95 EPIP-25 Headquarters Support Personnel Emergency Call List (Insert behind Call List Tab.).

17 03/28/96 EPIP-26 Oil and Hazardous Material Spill Call List (Insert behind Call List Tab).................,,.16 03/28/96 EPIP-27 Notification / Augmentation Guideline............

1 06/16/93 EPIP-30 Reactor Coolant Post Accident Sampling Analysis Remrt (Renumbered to EPIP-8.4.1a)

CANCELED 02/89 EPIP-31 Containment Mephere Post-Accident Sampling An%: Report (Renumbered to EPIP-8.4.2a).....

CANCELED 02/89 O

EPIP-33 Estimate of Core Damage Worksheet CANCELED 08/87 (T - Temporary Change)

Page 4 of 5

s-l POINT BEACH NUCLEAR PLANT EPIP FORM INDEX EMERGENCY PLAN IMPLEMENTING Revision 32 PROCEDURES May 31,1996 I

INDEX PROCEDURE REVISION EFFECTIVE CANCELED NUMBER FORM TITLE

. NUMBER DATE DATE EPIP-34 Calculation of XE-133 Equivalent Release Rates.

CANCELED d8/87 EPIP-35 Dose Calculations CANCELED 09/85 l

)

I

'v I

1 j

A i

!O 1

(T - Temporary Change)

Page 5 of 5

POINT BEACH NUCLEAR PLANT EPIP 4.3 l

EMERGENCY PLAN IMPLEMENTING PROCEDURES NNSR Revision 16 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION May 31,1996 Q) f l.0 PURPOSE 1.1 The purpose of this procedure is to provide instructions for the activation of the Emergency Operations Facility (EOF). The EOF is activated upon declaration of a SITE EMERGENCY, GENERAL l

EMERGENCY, or at any other time deemed necessary.

j 1.2 Attachment I outlines the operation of the EOF ventilation system, discusses the electric power supply to the EOF and describes the EOF annunciator panel.

1.3 outlines the operation of the dose projection programs.

1.4 outlines the use of the Site Boundary Control Center radiation monitors.

2.0 ACTIVATION OF THE EMERGENCY OPERATIONS FACILITY NOTE:

Anyfully qualified Duty and Call Superintendent (DCS) may assume the duties of the acting Emergency Support Manager untilrelieved. This allowsfor the designatedSite Manager to stay in the TSC.

2.1 The activatwn of the EOF is the responsibility of the facility manager (the Site Manager, acting Emergency Support Manager, or the Emergency Support Manager).

NOTE:

Thefirst DTA to arrive should commence completion ofchecklist EPIP 4.3a as part ofhis initial actionfou nd in the EOF Guliebook, EOF 1.1.

D[b 2.2 The facility marager should assure the completion of EPIP 4.3a, " EOF Activation Checklist."

2.3 The facility manager should assure the health physics area has been, or is being activated, in accordance with EPIP 7.2.1, " Activation of the Health Physics Facility at the Site Boundary Control Center."

2.4 Once the facility is sufficiently staffed, the facility manager should assume responsibility for off-site communications, radiological dose assessment, and off-site protective action recommendations.

2.4.1 Follow the guidance in EPIP 4.3a, " EOF Activation Checklist" to make announcements within the facility and to other emergency facilities that the EOF is activated.

2.4.2 Minimum stalling includes:

a.

Emergency Support Manager (or Acting ESM) b.

RadCon Waste Manager c.

Duty Technical Advisors (2) d.

Communicators to staff agency communications (3) 2.5 Reference the EOF Guidebook, EOF 5.1, " Emergency Support Manager" for details in the management of the EOF.

n\\,3 N RC O N LY NOT FOR PUBLIC DISCLOSURE Page 1 of 7 REFERENCE USE

POINT BEACH NUCLEAR PLANT EPIP 4.3 l

EMERGENCY PLAN IMPLEMENTING PROCEDURES NNSR Revision 16 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION May 31,1996 O

^

3.0 ACTIVATION OF THE DOSE PROJECTION / PAR ARE A 3.1 Activation of the EOF's dose projection area is the responsibility of the RadCon Waste Manager or Assistant RadCon Waste Manager.

3.1.1 Check the availability of the computer dose projection program on the LAN. If not available, obtain the floppy diskette from the EOF supply cabinet. Windows is loaded on the dose projection PC in the EOF.

3.1.2 Check the availability of data from the PPCS.

3.2 Communicate with the Chemistry Director in the TSC to determine if dose projections have been made, and if so, discuss what information was used for the latest dose projection (s).

3.3 Reference the EOF Guidebook, EOF 4.1, "RadCon Waste Manager" or EOF 4.2, " Assistant to the RadCon Waste Manager" for details in management of the dose projection area of the EOF.

4.0 ACTIVATION OF THE ADMINISTRATIVE AND LOGISTICS AREA IN THE EOF 4.1 The activation of the Administrative and Logistics area of the EOF is the responsibility of the Administrative and Logistics Manager.

4.2 The Administrative and Logistics area is located in the ESM room in the Site Boundary Control Center.

4.3 When the Administrative and Logistics area is ready for operation, the A&LM should contact the O

Emergency Support Manager.

1 O

Page 2 of 7 REFERENCE USE

POINT BEACH NUCLEAR PLANT EPIP 4.3 l

EMERGENCY PLAN IMPLEMENTING PROCEDURES NNSR Revision 16 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION May 31,1996 G

f h ATTACHMENT 1 OPERATION OF THE EMERGENCY VENTILATION SYSTEM & EOF ANNUNCIATOR PANEL AT THE EOF

1.0 DESCRIPTION

- EMERGENCY VENTILATION SYSTEM J

1.1 The EOF's emergency ventilation system has a nor;nal and emergency operation mode.

1.2 Under all modes of operation, fresh air is taken in from the vent on the seui end of the west side of the building.

1.3 Under normal conditions the air is filtered by roughing and electrostatic filters.

1.4 in the emergency mode, a minimum amount of outside air is taken into the building and incoming air is ro 'ted through an additional high efficiency particulate filter.

j 2.0 ILN ERGENCY OPERATION OF THE EMERGENCY VENTILATION SYSTEM M

2.1 The control panel for the SBCC ventilation system (MI) is located in the me tanical equipment room.

Access to the mechanical equipment room is through the men's locker and testrocm 2.2 To shift the heating, sentilation and air conditioning system from the norreal to the emergency mode, manually select the " Emergency" position with switch S3 on panel M t.

3.0 EMERGENCY OPERATIONS POWER SUPPLY O

f Electrical power to the Site Boundary Control Center, and therefore the EOF, is prosia-d by Wisconsin Public Senice Corporation (WPSC) via a distribution feeder, in case of a total electrical power failure, call WPSC. The telephone number for WPSC can be found in EPIP-23, "Off-site Agency Emergency Call List."

4.0 DESCRIPTION

- EOF ANNUNCIATOR PANEL 4.1 The EOF's annunciator panel monitors eight parameters in the Site Boundary Control Center building.

4.1.1 The control room will receive an alarm upon annunciation of any of the eight alarms.

4.1.2 The eight alarms are:

Holding tank high level alarms on high level, holding a.

tank must be pumped by a contractor.

b.

Dosing tank high level - alarms on high 1cvel.

c.

Fire detector - annunciates upon detection of a fire.

d.

Emergency mode annunciates when building HVAC system is switched to the emerger.cy mode, Building temperature low - annuciates upon exceeding the setpoint for the building c.

temperature. This usually indicates a heating system failure, f.

Pump failure - annunciates whenever a pump associated with control panel M1, does not start on demand, after a 30-second time delay.

Page 3 of 7 REFERENCE USE

POINT BEACH NUCLEAR PLANT EPIP 4.3 l

EMERGENCY PLAN IMPLEMENTING PROCEDURES NNSR Revision 16 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION May 31,1996 O

d g.

Air filter plugged - annunciates when the electrostatic air filter is plugged and the differential pressure across the filter exceeds the setpoint.

h.

Compressed air low pressure - annunciates'when the air pressure in the supply header to the Johnson Controls control system falls belcw the setpoint.

4.2 Response to annunicator panel alarms.

4.2.1 Call the control room to acknowledge the alarm.

4.2.2 Call for the appropriate assistance required.

O P

Page 4 of 7 REFERENCE USE

l POINT BEACH NUCLEAR PLANT EPIP 4.3 l

EMERGENCY PLAN IMPLEMENTING PROCEDURES NNSR Revision 16 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION May 31,1996 l

ATTACHMENT 2 1.0 ACCESS OF EMERGENCY METEOROLOGICAL AND DOSE ASSESSMENT (MAD) PROGRAM 1.1 PC Press the " master" button on the PC power director choose MAD-PC from menu options. The MAD dose projection program should boot up.

1.2 Back-up (Floooy Disk) MAD-PC If for any reason the MAD PC program, which resides on the hard drive, is aborted because of unintentional mechanical failure or program erasure or intentional facility evacuation, the back-up copy of the MAD-PC program should be used. The copy of this program is kept in the facility supply cabinet along with the user instructions.

If it is necessary to use the back-up copy of MAD-PC, perform the following steps:

1.2.1 Insert the back-up MAD-PC floppy disk into the appropriate drive on the PC the program will run on.

1.2.2 Reboot the PC and the program menu will appear on the screen.

(A 1.2.3 Follow the user prompts to run MAD-PC.

l.2.4 If the hard drive version has been erased, the floppy disk program can be installed onto the hard drive, if necessary, at a later time.

Page 5 of 7 REFERENCE USE

POINT BEACH NUCLEAR PLANT EPIP 4.3 l

EMERGENCY PLAN IMPLEMENTING PROCEDURES NNSR Revision 16 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION May 31,1996 ATTACHMENT 3 ACTIVATION OF THE IODINE AND NOBI'E GAS (ING)

RADIATION MONITORS 1.0 ACTIVATION OF IODINE AND NOBLE GAS RADIATION MONITORS 1.1 Coordinate with the offsite health physics director to have the iodine and noble gas sample pump started.

The pump is in the heating and ventilation room adjacent to the men's lavatory. Ensure that a new charcoal canister is installed and that the initial sample flow rate and start time are recorded.

1.2 Interpretation of RMS Readouts 1.2.1 The concentration of noble gas is determined by multiplying the obsened count rate on the readout labeled "RE-242" by the calibration constant posted adjacent to the meter. The resulting units are Ci/cc Xc-133 dose equivalents.

1.2.2 The iodine activity on the charcoal cartridge is obtained by multiplying the obsened count rate on the readout labeled "RE 241" by the calibration constant posted adjacent to the meter.

The resulting units are Ci-I 131 dose equivalents.

1.2.3 To convert the iodine activity into a concentration, calculate the volume of air that passed A

through the filter. The concentration ofiodine is approximately the actisity on the filter V

( Ci) divided oy the total volume (cm') for sampling periods less than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, assuming no short-lived isotopes are present.

NOTE:

For longer sampling periods and when short-lived lodine isotopes are e.xpected to bepresent, thefollowingformula may be used to calculate the lodine concentration:

C=

(AAc*')'s f p(1-c*s)

Where:

iLni11 C

concentration in air Ci/cc

=

F sample volume

=

cc A

decay constant,0.693T'/

min

=

2 A

total activity on filter Ci

=

elapsed time from sample's' top to count start min t

=

's

. total samp!: time min

=

p filter collection efficiency min

=

Any changes to the alarm setpoints shall be made in accordance with the Radiation Monitoring System Alarm Setpoint & Response Book (RMSASRB) kept in the control room.

I O

i i

Page 6 of 7 REFERENCE USE

~

%.n Ln O..^

)

)

l E

EP M

MO I

E EN

_ Es l' xj "M a&

G G

R R T B

E E

g E

[

N N A C

C C q'd 5 Y

Y H j

O P

P LN

/3 O

E AU R

NC S

I ll' A

L c

o.

I T

ME t

.a v

C

(

A TVmJ1 a

S A

a I

o D

L m

O P

,s J.u L R r

s

  • e N

EP a

A A

E I

Ou @

g ML n

u, L"u.

e s

F EA u

A EI NN O

V K _*m C

,ud.h

@ u,. dc.u.h

.m &

T T FF

,u.

u I

Fgi E

L IN AI I

Lu T

G r

Oe Y

P O.4 P

g R3

)T g

"(

5g eJ m

E R

a

(

O O

e P-

}

)

)

m F

C L1 7

A

)

E t

o N

w.

f A

D 7

C U

T R

I E

(r g!i s I V

S A

n

W

"@ eu$ _D a'W D D

T E

I O

. a-5 O

a n

N g

  • l

.j m

)

)

)

m 5

L MRNE vNP e

a l "Bg, y

I iSP s

3 iR o

4 R

,1 n 3

E 1

1 F

9 6 9

E 6

R EN gf CE U

SE l

l l

l ll i11

POINT BEACH NUCLEAR PLANT EMERGENCY OPERATIONS FACILITY ACTIVATION CHECKLIST NOTE:

EOFactivation may bephased. Communication responsibilities may be assumed separatelyfrom dose assessment andprotective action recommendations.

O..

This checklist should be completed by the Emergency Support Manager, the Site Manager, or a designee.

[nitiali I! gig A lead communicator has been assigned and directed to initiate EOF communications support.

Communicators have performed the Immediate Duties in EOF Guidebook, EOF 3.1, 3.4, and 3.5.

A lead technical person has been assigned and directed to initiate EOF data support.

Technical persons have performed the Immediate Duties in EOF Guidebook, EOF 3.8 and 3.9.

Information Management Specialists have performed the Immediate Duties in EOF Guidebook, EOF 2.1.

The RadCon Waste Manager, or the Assistant RCWM has the ability to perform dose projections and assessments.

The EOF ventilation system has been placed in the emergency mode and the iodine and noble gas monitor has been activated. (See OSHPD)

The following positions have been staffed in the EOF:

Emergency SupportManager RadCon Waste Manager Duty Technical Advisors (2)

Communicator to the State and Counties Communicator to the SRC g

Communicator to the NRC via HPN Following satisfaction of the above items, or when deemed appropriate, please contact the Site manager and formally assume responsibility of each of the following:

Time Transferred Announced to Area of Resoonsibility to EOF (24 hr EOF staff Dh clock) 1.

Offsite communications and status 4

updates.

2.

Offsite radiological assessment.

3.

Offsite protective action recommendations.

4.

Others:

Announce the activation of the EOF and assumption of responsibilities to the EOF staff Announce the activation and assumption t)f responsibilities to other Emergency i

Response Facilities Completed by Date O

N RC O N _Y EPIP-4.3a Revision 3 05/31m Page1of1