ML20112D489
| ML20112D489 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 07/24/1984 |
| From: | COMMONWEALTH EDISON CO. |
| To: | |
| References | |
| OL-I-R-005, OL-I-R-5, NUDOCS 8501140319 | |
| Download: ML20112D489 (4) | |
Text
_ _ _ _ _ - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _. - - _ _ _ _ _ _ _.. - ____
NUCLE R REGULATORY COMMI 10 3
/
[Tcem - Tcrminattens 3
ru.a :84 0 omcias ta., '
EQSET - Equipment Coi.tinig i, ea matter er O. ECD
! O EQMOD - Equip, Modification stet c5moro j A325 - Structural Bolting s
weant
__ -.runn" PAN - Cable Pan
~
PANHCR - Cable Pan Hangers sm:ruc3 _
_/
R E r_ ci w --- - --- -- -
COND - Conduit cena rt _._ __ __ _.. -
/
/
Asbit - Conduit Asbuilt cenncu ____ _ ______tu _~)/'M fL DATE: 01-04-84 M'UUWI - Visual Welding i>
c
'c other u..es 50 ~ 4 C4NS'5" 0 t, Reprter
- - - BYRON-OC-INSPECTOR REINSPECTION:
STATUS M
CONTRACTOR INITIAL SPECIFICATION CERTIFICATION LEUEL NAME POPULATION RESULTS F-2790 77-05-31 III W.
Gratza F-2790 77-08-19 II D.
Rice Init.
OK 3-UWI 97%
F-2790 77-11-15 II K.
Donica F-2790 78-01-05 I
J.
Anderson Init.
OK 3-Asbit 96%
F-2790 78-05-12 II J.
Johnson F-2790 78-10-20 II W.
Wright F-2790 78-12-05 II.
D.
Hoffman Init.
Raj 3-UWI 86%
F-2790 79-03-06 II P.
Lane Subst.
F-2790 80-01-08 I
J.
Hardenbrook F-2790 80-01-14 II J.
Buchanan NRC OK 3-Term 100%
-EQSET 100%
-A325 100%
-COND 100%
F-2790 80-05-12 I
E.
Cetzelman NRC OK 3-Term 100%
F-zT90 8 0 * #-12
-K g. (pe t sel N a m pec.
-COND 100%
-UWI 91%
F-2790 80-08-04 I
L.
Droege F-2790 81-02-09 II K.
Cripps NRC OK L-Term 100%
-EQMOD 100%
-COND 100%
F-2790 81-02-27 II E.
Dumas Init.
OK 3-Term 99%
i
-EQMOD 100%
-COND 95%
-UWI 93%
F-2790 81-03-12 II W.
Jackson F-2790 81-03-29 I
J.
Elgin Init.
OK 3-Ashlt 97%
F-2790 81-05-09 I
T.
Maas F-2790 82-05-15 I
R.
Barziloski 8501140319 840724 PDR ADOCK 05000454 OOO3r G
Tcrm - TCrmin2ticn3 EQSET - Equipment Co-cina EQMOD - Equip. Modification A325 - Structural Bolting r
PAN - Cable Pan PANHCR - Cable Pan Hangers CONO - Conduit Asblt - Conduit Asbuilt DATE: 01-04-84 I
UWI - Visual Welding BYRON OC INSPECTOR REINSPECTION STATUS CONTRACTOR INITIAL SPECIFICATION CERTIFICATION LEVEL NAME POPULATION RESULTS i
F-2790 81-05-13 II R.
Barziloski F-2790 81-05-13 I
R.
Mulkey F-2790
$1-05-13 II R.
Mulkey F-2790 81-05-13 II T.
Smith Init.
OK 3-UWI 94%
)
F-2790 81-05-26 I
J.
Malunda F-2790 81-05-26 II J.
Malunda F-2790 81-06-05 I
G.
Cason i
.F-2790 81-06-05 II G.
Cason F-2790 81-06-26 I
H.
Holze Init.
OK 3-COND 96%
}
F-2790
'81-06-26 I
J.
Merritt 1
F-2790 81-06-29 I
J.
Konowal F -2790 81-06-29 I
L.
Dobosh
)
F-2790 81-08-10 I
A.
Blake i
F-2790 81-08-10 I
F.
Keep Init.
OK 3-COND 98%
F-2790 81-08-10 I
J.
Fornwall I
F-2790 81-08-10 I
J.
Wilson i
F-2790 81-08-21 I
S.
Bindenagel F-2790 81-08-26 I
D.
McDuffie i
F-2790 81-09-08 I
G.
Server Init.
NR F-2790 81-09-12 II D.
Richards j
F-2790 81-10-02 I
S.
Hubler Next OK 3-PANHCR 98%
1 F-2790 81-10-05 I
D.
Nicholson F-2790 81-10-05 I
D.
Stoner Init.
OK 3-Asbit 96%
t F-2790 81-10-05 I
L.
Kiergaard F-2790 81-10-05 I
R.
Ewbank l
F-2790 81-10-05 I
R.
Riemer F-2790 81-10-09 II P.
Burke j
F-2790 81-10-26 I
J.
Rosick i
F-2790 81-11-02 II T.
Wells Init.
OK 3-UNI 97%
OOO3r
Term - Tceminattena EQ ET - Equipment Costing EQM00 - Equip. Modification A325 - Structural Solting PAN - Cable Pan PANHGR - Cable Pan Hangers COND - Conduit Ashlt - Conduit Asbuilt DATE: 01-04-84 UWI - U1sual Welding f
i BYRON OC INSPECTOR REINSPECTION '
)
STATUS i
CONTRACTOR INITIAL SPECIFICATION CERTIFICATION LEUEL NAME POPULATION RESULTS I
1 F-2790 81-11-09 I
D.
Meyer F-2790 81-11-16 II W.
Levell F-2790 81-12-05 II A.
Koca NRC OK 3-UWI 100%
F-2790 81-12-16 I
J.
Anderson i
F-2790 81-12-16 I
J.
Eggum F-2790 12-16 I
R.
Emerson Init.
OK 3-Ashlt 96%
F-2790 81-12-16 I
T.
Ahlquist F-2790 81-12-18 I
B.
Mandurano j
F-2790 81-12-18 I
8.
Peterson F-2790 81-12-18 I
D.
Dehmlow Init.
OK 3-Ashlt 95%
F-2790 81-12-18 I
D.
Hoffman l
F-2790 81-12-18 I
D.
Opatrny i
F-2790 81-12-18 I
D.
Perko Init.
OK 3-Ashlt 96%
l F-2790 81-12-18 I
E.
Sarver l
F-2790 81-12-18 I
F.
Rickert F-2790 12-18 I
H.
Kainz
}
F-2790 81-12-18 I
J.
Mandurano F-2790 81-12-18 I
J.
Mulroney F-2790 81-12-18 I
J.
Pathman F-2790 81-12-18 I
J.
Wood i
F-2790 81-12-18 I
M.
Momaly i
F-2790 81-12-18 I
R.
Peterson Init.
OK 3-Asbit 96%
F-2790 81-12-18 I
S.
Webb F-2790 81-12-18 I
T.
Joyce F-2790 81-12-28 I
C.
Lindberg Init.
OK 3-Asblt 95%
F-2790 82-01-04 I
A.
Schutt F-2790 82-03-06 II J.
Hayes F-2790 82-03-16 I
K.
Knoebber F-2790 82-03-19 I
S.
Wagner i
,1 OOO3r
=
TCrm - Terminntieno EQIET'- Equipment Co cing -
j EQMOD - Equip. Modification A325 - Structural Bolting PAN - Cable Pan 4
PANHCR - Cable Pan Hangers COND - Conduit a
Ashlt - Conduit Asbuilt j
DATE: 01-04-84 UWI - Visual Welding i,
BYRON QC INSPECTOR REINSPECTION _
STATUS j
CONTRACTOR INITIAL SPECIFICATION CERTIFICATION.
LEUEL NAME POPULATION RESULTS i
1 j
F-2790 82-03-19 II S.
Wagner 1
F-2790 82-03-24 II H.
Hanson
~ Init.
OK 3-Term 99%
-EQSET 100%
l F-2790 82-05-28 II J.
Ogsbury I
F-2790 82-06-03 II I.
Souder
)
F-2790 82-06-09 I
R.
Ruefer F-2790 82-06-09 II R.
Ruefer F-2790 82-06-24 I
G.
Berry Init.
OK 3-PANHCR 97%
-PAN 100%
j F-2790 82-06-24 I
S.
Karr 1
F-2790 82-09-24 II J.
Spangler j
F-2790 82-10-15 I
S.
Cullen i
i F-2790 82-10-18 I
M.
Andrews
)
F-2790 82-10-25 I
T.
Nowakowski F-2790 82-11-01 II J.
Hughs
}
F-2790 82-11-04 I
P.
McMenamin i
F-2790 82-11-06 I
R.
Friel F-2790 82-11-10 I
B.
Weldon i
F-2790 82-11-17 I
J.
Henson
}
F-2790' 82-11-18 I
G.
Ostrander i
F-2790 83-01-07 II D.
Swick F-2790 83-01-11 II R.
Quijas l
F-2790 83-01-12 II C.
Cavins i
F-2790 83-01-13 II J.
Fedorko i
F-2790 83-01-25 II D.
May i
5 I
OOO3r