Responds to NRC Re Submission of Reactor Bldg Purging Summary Rept After First Cycle of Operation After Restart.Rept Will Be Submitted within 120 Days Following Shutdown for Cycle 6 Refueling
ML20112B659
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/13/1985
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
0192A, 192A, 5211-85-2051, NUDOCS 8503190276
Download: ML20112B659 (1)


Text

__

f GPU Nuclear Corporation L

Nuclear

,ome: 48o s

Middletown, Pennsylvania 17057 0191 717 944-7621 TELEX 84-2386 Writer's Direct Dial Number:

I March 13, 1985 5211-85-2051 g,

i Office of Nuclear Reactor Regulation Attn:

J. F. Stolz, Chief

]

Operating Reactor Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Stolz:

i Three Mile Island Nuclear Station Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Reactor Building Purging Summary Report Your letter of December 5,1984, regarding containment purging, requested that GPUN provide a summary report after the first cycle of operation after restart that contains (1) the actual number of hours of purging for each of the operations or combination of operations listed in T.S. 3.6.9, (2) an analysis of the benefits of purgin exposure to plant personnel, and (g in terms of reduction in radiation 3) the actions taken to entries. We agree with your conclusions that our proposed Technical Specification requirements (TSCR 116, Rev. 2) combined with other actions to limit off-site doses are adequate to ensure protection of the public health and safety. Additionally, we shall submit the requested report within 120 days following shutdown for Cycle 6 refueling.

Sincerely, L

.H ill i

Director THI-1 HDH/ RAS /spb cc:

R. Conte

&[

8503190276 850313

0. Thompson PDR ADOCK 05000289 P

PDR t

0192A 0

GPU Nuclear Corporation is a subsidiary of the General Public utilities Corporation

.