. _ _ _ _ _ _ _
e 's,_
Calling Address
'k..A Alabims Power Company 600 North 18th Street e
Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 7834090
.h h R. P. Mcdonald Senior Vice Prasident 0: 21 AlabamaPower Flintridge Building n e_
,.n e-February 18, 1985 Docket No. 50-348 Docket No. 50-364 Mr. D. M. Verre111 U. S. Nuclear Regulatory Coninission Region II 101 Marietta Street, N.W.
Suite 3100 Atlanta, GA 30323
SUBJECT:
J. M. Farley Nuclear Plant NRC Inspection of December 11, 1984 - January 10, 1985 RE:
Report Numbers 50-348/84-32 50-364/84-32
Dear Mr. Verre111:
This letter refers to the violation, cited in the subject inspection reports, which states:
"The following violations were identified during an inspection conducted on December 11, 1984 - January 10, 1985. The Severity Levels were assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).
Technical Specification 6.8.1.c requires that written procedures shall be established covering surveillance activities of safety related equipment.
Contrary to the above, adequate surveillance procedures were not established in that no procedure existed to set the flowrate for the chlorine detectors.
This is a Severity Level V violation (Supplement I)."
8503190258 850228 PDR ADOCK 0$000348 G
,j e 'o.
8' Mr. D. M. Verrelli-February 18, 1985 Page Two Admission or Denial The above violation occurred as described in the subject report.
Reason for Violation The above violation was caused by procedural inadequacies.
Corrective Action Taken and Results Achieved The flow rates for the chlorine detectors were adjusted to the proper range.
Corrective Steps Taken to Avoid Further Violations Surveillance Test Procedures were revised to require the flow rates for the chlorine detectors be checked on a monthly interval during the monthly surveillance testing and following maintenance.
Date of Full Compliance February 10, 1985 Affirmation I affirm that this response is true and complete to the best of my knowledge, information and belief.
The information contained in this letter is not considered to be of a proprietary nature.
Yours very tru
'I g
/
R. P. Mcdonald RPM: sam /F-2