l OPERATING DATA REPORT (Revised Data for November 1984)
DOCKET NO. 50-336 l
DATE 2/14/85 COMPLETED BY J. Gibson TELEPHONE (203)447-1791 EXT. 4431 OPERATING STATUS 1.
Unit Name:
Millstone Unit 2 Notes Items 21 and 22 2.
Reporting Period:
November 1.984 cumulative are weighted 3.
Licensed Thermal Power (MWt):
2700 Ave. Unit operated at 4.
Nameplate Rating (Gross MWe):
909 2560 MW Thermal prior 5.
Design Electrical Rating (Net MWe):
870 to its uprating to the 6.
Maximum Dependable Capacity (Gross MWe):
866.25 current 2700 MW Thermal 7.
Maximum Dependable Capacity (Net MWe):
833.25 Power Level.
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
The Conversion of the Main Steam Control Valves from partial ARC to full ARC, Condenser Tube Fouling, Feedwater Flow Venturi Fouling, and High Steam Generator Blowdown Rates.
t 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 720 8040 78312 12.
Number Of Hours Reactbr Was Critical 655.9 7852.8 56218.1 13.
Reactor Reserve Shutdown Hours 0
0 2205.5 14.
Hours Generator On-Line 583.3 7477.4 53659.6 15.
Unit Reserve Shutdown Hours 0
0 468.2 16.
Gross Thermal Energy Generated (MWH) 1524599.3 19437265 135748934 17.
Gross Elec. Energy Generated (MWH) 492400 6241101 44047479 18.
Net Electrical Energy Generated (MWH) 470885 5996396 42212097 19.
Unit Service Factor 81.0 93.0 68.5 20.
Unit Availability Factor 81.0 93.0 69.1 21.
Unit Capacity Factor (Using MDC Net) 78.5 86.7 64.1 22.
Unit Capacity Factor (Usir.g DER Net) 75.2 85.7 63.2 23.
Unit Forced Outage Rate 19.0 4.0 17.3 l
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Millstone Unit 2 is scheduled to shutdown in February 1985 for a 16 week refueling and Maintenance Outage.
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A C0t#4ERCIAL OPERATION N/A N/A l
- Item 21 Yr-To-Jate is weighted Ave. due to a change in MOC effective Nov W er 1, 1984.
85031;O107 850215 PDR ADOCK 05000336 R