Forwards List of SER Open/Outstanding Issues.Requests Specific Description of Unresolved Issues & Schedule for Issuing SER
ML20112A911
Person / Time
Site: Beaver Valley
Issue date: 03/07/1985
From: Woolever E
DUQUESNE LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
2NRC-5-039, 2NRC-5-39, NUDOCS 8503180509
Download: ML20112A911 (4)


Text

e

}Vg

'Af 4 )78 -5 41 (412) 923-1960 Nuclear Construction Division Telecopy (412) 787-2629 Robinson Plaza. Building 2 Suite 210 Pittsburgh, PA 15205 March 7, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Mr. George W. Knighton, Chief Licensing Branch 3 Of fice of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Do cke t No. 50-412 S.E.R. Outstanding Issues Status Gentlemen:

Attached is a current list, as of February 25, 1985, which provides our unde rs t and ing of the outstanding issues wh ich remain open.

Items identified as "c om p le t e" are those for which res pons es have been provided and no confirmation of status has yet been received from the staff.

We cons ide r these items satisfactorily closed unless not ified otherwise.

In o rde r to permit timely resolution of items ident if ied as "c ompl e t e" wh ic h may not be resolved to the staf f's sat is fact ion, please provide a specific description of the issue which remains to be resolved.

Items identified as

" confirmatory" are based upon fo rmal or informal communications or agreements with the staf f.

Please inform us of any disagreement of status described on the attached list.

As indicated by the attached list, the number of outst anding issues remaining open is less than 20.

Please provide a schedule for issuing the Safety Evaluation Report.

DUQUESNE LIGHT COMPANY By E. J. Wdolever Vice President GH0/wjs Attachment cc:

Mr. H. R. Denton, Director NRR (w/ attachment)

Mr. H. Thompson, Director Division of Licensing (w/ at t achment )

Mr. B. K. Singh, Project Manager (w/ attachment)

Mr. T. Novak, Assistant Director Division of Licensing (w/ attachment)

Mr. G. Walton, NRC Resident Inspector (w/ attachment) 8503180509 850307 D Ool PDR ADOCK 05000412 D

E PDR

'//

f

\\

BVPS-2 Outstanding Issues Status APPLIC#4T RE!PONSE DIV.

BRMOi REVIEER ISSUE NOTE DATE REWKS DSI RS E. Lantz

  • Qualification of PJR ptrips Closed 02/08/85
  • Natural Circulation Test A

ICS F. Burmws

05/30/84 AS R. Anand

  • Intemally Generated Missiles -

Outside contairment Closed 01/0845

  • Internally Generated Missiles -

Inside contairnent Closed 01/08/85

  • Protection against postulated pipe bred s outside containnent Confinnatory 01/0845
  • Fuel Pool Cooling and Clearup systen Closed 0148/85
  • Overhead heavy load handling systen E

02/13/85

  • Primary Camonent Cooling Water systen A

04/30/85

  • Condensate and Feedwater Systen Closed 0148/85

01/08/85 P2 J. Knox

  • Electrical - 17 open Itens A

R. Gianiina

  • Mechanical - 46 open ite'is A

CPB A. Gill

  • Loose part detection A

02/28/85

  • Inadequate com cooling instnrentation A 03/31/85 M. Dunefeld
  • Analysis of canbined LEA ard seisnic loads A
  • Oreline detection nethod Closed 09/07/84 ETB E. Markee
  • y/q B

02/15/85

  • Snow & Ice load B

01/16/85 AR K. Denpsey

  • Ra11ation consequences of LOCA B

llSB/84

  • Rod ejection accidents B

llS8/84 MB Y. Li

  • Primary vs. secondary loads Complete T/20/85
  • In service testing A

06/85

  • APPLICANT RETONSE DIV.

BRMOi REVIEER ISSUE NOTE DALE REM 0KS

  • Asynmetric LOCA loads RC DE ffB
0. Rot 2 erg
  • PIV leak testing RC SGEB K. Leu
  • Seismic Input Closed 02/01/85
  • Seismic systen analysis Closed 02/01/85
  • Concmte containnent Closed 12/21/84
  • Corrmte and Stmetural steel intemal stmetures Closed 12/21/84
  • Other Category I stmetums Closed 12 /17/84
  • Foundations Closed 12/17/84 Soil Structum Interaction (SSI)

Analysis RC 02Sl/85 G5B G. Giese-Koch

  • Seismology A

02/15/85 E0B H. Walker

  • Erwimanental Qualification Confinnatory 08/05/84 J. Lonbardo
  • Ptap & Valve Confinnatory 08S5/84 A. Lee
  • Seisnic Qualification Confinnatory 08/05/84 MIEB M. Hisn
  • Pmservice Inspection Program A

06/85

  • Inservice inspection of Class 2 & 3 conponents A

06/85 D. Smith

  • Underclad cracking of forgings in R.V.

Closed 08/10/84 CHEB J. Stang

09/85

  • Alternate shutdown A

09/85

  • Fim in Cable spmading roon 8

05/30/84 EHEB R. Gonzales

  • Potential for flooding fron local precipitation B

05/30S4

  • Flooding frun Peggs Rtm B

05/30/84 DWS WEB R. Eckenrode

  • Safety paraneter display systen and control roon & sign review A

0341/85 LQB F. Allenspack

  • Managenent & Onjanization A
  • APPLICMT RE90E>E DIV.

BRMCH REVIEER ISSUE NOTE DATE REMKS DWS PSIB R. Becker

  • Initial test progran A

S. Bryan

  • Bnergency operating procedure Closed IE EPB J. Sinmonds
  • Energency Preparedness Plan A

03/15/85 Reg.1

  • Cross-Trainirg progran A

03/01/85 NOTE: These open issues include backfit itens A - Applicant to prwide infonnation B - Backfit i