Amend 4 to License NPF-30,changing Tech Specs to Allow for Appropriate Compensatory Actions When Two Source Range Monitor Channels Out of Svc
ML20112A179
Person / Time
Site: Callaway 
(NPF-30-A-004, NPF-30-A-4)
Issue date: 03/06/1985
From: Youngblood B
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20112A181 List:
References
NUDOCS 8503180198
Download: ML20112A179 (5)


Text

.

[f j

UNITED STATES

( (p,

+

Q(/ 'i j NUCLEAR REGULATORY COMMISSION 5

WASHINGTON, D. C. 20555 k.%4,/

UNION ELECTRIC COMPANY 4

DOCKET NO. 50-483 CALLAWAY PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 4 License No. NPF-30 1.

The Nuclear Regulatory Comission (the Comission) has found that:

1 A.

The application for amendment by Union Electric Company (the licensee),

i dated August 1, 1984, as supplemented October 26, 1984, complies l

with the standards and requirements of the Atomic Energy Act of 1954, as emended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter,I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51' of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by a change to the Technical Specifi-cations as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Operating License No. NPF-30 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised i

through Amendment No. 4, and the Environmental Protection Plan i

contained in Appendix B,.both of which are attached hereto, are hereby incorporated into this license. UE shall operate the facility 4

in accordance with the Technical Specifications and the Environmental Protection Plan.

8503180198 850306

^

PDR ADOCK 05000483 P

PDR,

. 3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing

Attachment:

Change to the Technical Specifications Date of Issuance: MAR 6 1985

[

CONCURRENCE :

DL:LB#1 D

qfl DL:LB#1/

OELD DL f

JStevens: s MR norook P0'Connor

'Al-//[g BM('ngblood JJ3/85 g

85 2.//V/85 L/p'/85 85 AD:DL:SA:

49 DCrutchfield TMNovak i

/ /85 h85

e 2

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Sun het)

B. J Youngb ood, Chief Lic sing Branch No. 1 Division of Licensing

Attachment:

Change to the Technical Specifications Date of Issuance: March 6,1985 e

e 9

i ATTACHMENT TO LICENSE AMENDMENT NO. 4 OPERATING LICENSE NO. NPF-30 DOCKET N0. STN 50-483 Revise Appendix A, as follows:

REMOVE INSERT 3/4 3-6 3/4 3-6 9

)

-4,

' TABLE 3.3-1(Centinuedl j

ACTION STATEMENTS (Continued)

ACTION 4 - With the' number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement.. spend all operations involving

' positive reactivity changes.

ACTION 5 - a.

With the number of OPERABLE channels one less than the Minimum' Channels OPERABLE requirement, restore the in-operable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or open the Reactor trip. breakers, suspend all opfrations involving

~

positive. reactivity changes and verify Valves BG-V178 and l

BG-V601 are closed and secured in position within the next hour.

b.

With no channels OPERABLE, open the Reactor Trip Breakers, suspend all operations involving positive reactivity changes and verify compliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1 or 3.1.1.2, as applicable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter, and verify valves BG-V178 and BG-V501 are closed and secured in position within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and verifi'ed to be closed and secured in position every 14 days.

ACTION 6 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfie.d:

a.

The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and

~

b.

The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may'be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> l

for surveillance testing of other channels per 3

Specification 4.3.1.1.

ACTION 7 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed i

until performance of the next required ANALOG CHANNEL OPERATIONAL TEST provided the inoperable channel is pla,ced in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

ACTION 8 - With less than the Minimum Number of Channels OPERABLE, within 1

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> determine by observation of the associated permissive

~

annunciator window (s) that the interlock-is in its required state for the existing plant condition, or apply Specification 3.0.3.

With the. number of OPERABLE channels one less than the Minimum ACTION 9 Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per. Specification 4;3.1'.1, provided the other channel is OPERABLE.

ACTION 10 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or open the Reactor trip i

breakers within the next hour.

ACTION 11 - With the number of OPERABLE channels less than the Total Number of Channels, operation may continue provided the inoperable channels are placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

CALLD!AY - UNIT 1 3/4 3-6

.m

.. ~. -.

--