l Wisconsin Electnc POWER COMPANY 231 W Michgon PO Box 2046. Mdwoukee.WI S3201-2046 M14) 221-2345 VPNPD-96-029 10 CFR 50.54(f)
May 9,1996 l
J Document Control Desk US NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 RESPONSE TO N'RC BULLETIN 96-02.
MOVEMENT OF HEAVY LOADS OVER SPENT FUEL.
OVER FUEL IN THE REACTOR CDRE. OR OVER SAFETY-RELATED EOUIPMENT POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 This letter provides informMion pursuant to 10 CFR 50.54(f) in response to the requested actions contained in NRC Bulletin 96-02, " Movement of Heavy Loads Over Spent Fuel, Over Fuel in the Reactor Core, or Over Safety-Related Equipment." The Bulletin required licensees to review their plans and capabilities for the handling of heavy loads in accordance with existing regulatory guidelines and within their licensing basis, and submit a report addressing the reviews.
Wisconsin Electric addressed the handling of heavy loads at the Point Beach Nuclear Plant in accordance with the guidelines of NUREG-0612, " Control of Heavy Loads at Nuclear Power Plants,"
and the December 22,1980, Generic Letter, in correspondence with the Commission Staff, and subsequently received an NRC Safety Evaluation dated March 27,1984. This Safety Evaluation addressed Phase I actions which included:
The identification ofload handling equipment within the scope of NUREG 0612, a description of associated load paths, procedures, and operator training, e
a description of special and general purpose lifling devices, and e
a description of the maintenance, testing, and repair of equipment and the handling e
equipment specifications.
I 9605160391 960509 i
PDR ADOCK 05000266 G
PDR 160010 g
9.
(
Document Control Desk May 9,1996 Page 2 In addition to the Phase I actions evaluated in the March 27,1984, Safety Evaluation, Wisconsin Electric upgraded the crane in the Primary Auxiliary Building to single failure proof criteria as a result of concerns over the movement of heavy loads over or near the spent fuel pool with fuel stored in the pool. The NRC reviewed and accepted this modification along with surveillance requirements for auxiliary building crane lifling devices in a Safety Evaluation dated September 3,1985, which accompanied License Amendments 96 and 100 for Point Beach Nuclear Plant Units 1 and 2 j
respectively.
l In response to required Item 1 of the Bulletin, we have reviewed our plans and capabilities for the handling of heavy loads at the Point Beach Nuclear Plant. These reviews have been performed I
to verify that load handling related activities including equipment requirements, continue to be performed as accepted by the NRC in the March 271984, and September 3,1985, Safety Evaluations. We have concluded that heavy load handling and related activities continue to be performed in accordance with our licensing basis as accepted by the NRC in the referenced safety evaluations. One clarification of our activities is warranted.
i Wisconsin Electric recently completed modifications which installed two additional emergency diesel generators at PBNP and realigned portions of the safety related electrical system. The original, existing Train B diesel generator was converted to a Train A diesel generator. The additional diesel generators, both Train B, related support equipment and 4160 volt switchgear, were installed in a separate Class I structure within the plant protected area. Each Train A and Train B diesel generator I
is f. illy capable of supplying the accident loads in one unit and maintain safe shutdown in the other unit.
Auxiliary cranes were installed in the new structure capable of handling heavy loads over safety related equipment. These cranes are normally used only during diesel generator related maintenance activities. Safe load paths and controls are being established to ensure heavy loads are not trans-ported over safety related equipment in this area during times that the equipment is required to be operable.
In response to required Item 3, heavy load handling activities performed over spent reactor fuel in the spent fuel pool are accomplished using a single failure proof crane and special lifling devices which meet the guidance in NUREG 0612. Point Beach Nuclear Plant presently utilizes the VSC-24 dry storage system at PBNP under the provisions of the general license granted by 10 CFR 72.210.
Heavy load handling activities over the spent fuel pool in support of dry storage activities are performed in accordance with the PBNP licensing basis as well as the VSC-24 Safety Analysis
]
Report, the related NRC Safety Evaluation Report and Certificate of Compliance 1007.
Consideration of a cask drop is therefore not required.
The PBNP Technical Specifications were modified by Amendment 96 and 100 as discussed previously to reflect the use of the single failure proof crane when handling heavy loads over spent fuel in the spent fuel pool. As directed by Items 2 and 3 of the Bulletin, we will continue to review
. ~. -. -
DocumentControl Desk May 9,1996 Page 3 i
future handling activities over and around the spent fuel pool as well as the balance of plant to ensure they continue to be performed in accordance with the PBNP licensing basis as reviewed and accepted by the Commission Staff. Should we detennine that future activities cannot be performed as previously reviewed and accepted by the NRC, appropriate approvals, including license amendments as appropriate will be obtained prior to proceeding.
Ifyou have any questions, please contact us.
Sincerely, i
l
~
l Bob Link Vice President Nuclear Power l
TGM l
cc: NRC Resident Inspector NRC Regional Administrator, Region III Subscribed and sworn to before me this @ day of 77b
,1996.
U J ro w t < r _A b% G
[ Notdry fublic, State of Wisconsin
.Q/
l My commission expires /b-M-90 l