Advises That Seismic Qualification of Shunt Trip & Reactor Trip Breaker Shunt Trip Mod Completed Satisfactorily. Proposed Tech Specs Consistent w/840622 Test Procedure Will Be Submitted by 850430
ML20111A460
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/08/1985
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
1131, GL-83-28, TAC-53170, NUDOCS 8503120512
Download: ML20111A460 (1)


Text

Docket No. 50-346 TOLEDO License No. NPF-3 A04AAo P. CROUSE Serial No. 1131 vo %.

Nm a m a m 22i March 8, 1985 Director of Nuclear Reactor Pegulation Attn.:

Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Licensing United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Stolz:

This is in response to the Supplemental Safety Evaluation Report of January 31,1985 (Log No.1683), regarding the Automatic Shunt Trip Design; Generic Letter 83-28. Item 4.3.

Toledo Edison implemented the reactor trip breaker shunt trip modifica-tion during the 1984 refueling outage, as ccmmitted to in our letter dated June 22, 1984 (Serial No. 1054). Additionally, the seismic quali-fication of the shunt trip attachment has been completed satisfactorily.

Regarding your request that Toledo Edison submit proposed technical specifications consistent with the test procedure outline subeitted in Toledo Edison letter dated June 22, 1984, a telephone conversation was conducted with Mr. A. DeAgazio (NRC Project Manager) on February 14, 1985, requesting additional time to review the request for submitting technical specifications. Toledo Edison will provide a response to this requent by April 30, 1985.

l Very truly yours, un RPC:LCS SGW:nif cc: DB-1 NRC Resident Inspector I.off

'a g3120512850300 p

ADOCK 05000346 PDR THE TOLEDO E0iSON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43052