ML20108D600

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Emergency Plan Annex,Partially Closing SER Outstanding Item 6.Annex Includes Emergency Action Levels & Evacuation Time Estimates Not Included in Draft Annex
ML20108D600
Person / Time
Site: Braidwood  
Issue date: 01/21/1985
From: Danni Smith
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20108D603 List:
References
9665N, NUDOCS 8503080420
Download: ML20108D600 (1)


Text

_ _ _ -

O Address Reply to: Post Office Box 767 Commonwealth Edison one First National Plaza Chicago, Illinois Chicago, lilinois 60690

]

January 21, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Braidwood Station Units 1 and 2 Annex to GSEP NRC Docket Nos. 50-456/457 Reference (a):

E. D. Swartz letter to H. R. Denton dated May 15, 1984

Dear Mr. Denton:

The enclosure to this letter provides a copy of our Braidwood Station Annex to the Commonwealth Edison Generating Stations Emergency Plan (GSEP) for your review.

NRC Staf f review of Part A Item No. 6 in the Braidwood SER.this information should allow for partial closur the Commonwealth Edison GSEP.This Annex has been incorporated into controlled copies of It includes Emergency Action Levels (Table BWA 5-1) and Evacuation Time Estimates (Figure BWA 6-2) which were not part of the Draft Annex submitted with Reference (a).

Please address any comments or concerns that you or your staf f may have regarding the enclosure to this office.

One (1) signed original and fifteen (15) co letter with the Enclosure are provided for your use, pies of this ery truly ypurs, David H.

S th Nuclear Licensing Administrator cc:

Monte P. Phillips - RIII RIII Inspector - Braidwood b $k i

L cis 9665N 8503080420 850121 PDR ADOCK 05000456 F

PDR


__