ML20108D505

From kanterella
Jump to navigation Jump to search
NPDES Discharge Monitoring Rept for Jan 1985
ML20108D505
Person / Time
Site: Browns Ferry  
Issue date: 01/31/1985
From:
TENNESSEE VALLEY AUTHORITY
To:
References
NUDOCS 8503080386
Download: ML20108D505 (11)


Text

,

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGDIENT DISCHARGE MONITORING REPORT Tennessee Valley Authority DSN 101:

DIFFUSER DISCHARGE Browns Ferry Nuclear Plant STRUCTURE Athens, Alabama 35611 MONTH JANUARY 19 85 1& DES # AL0022080 AMBIENT RIVER DOWNSTREAM DOWNSTREAM DOWNSTREAM TDiP P

FwW nH TEMP RTVFR TFMP RTVER TEMP RTVER TEMP RTSF 24-HOUR 6-HOUR INST 24-HOUR AVG 6_O AVC MAY AVC MAY HOURLY MAY AVC MAY E

9.0 90.0 92.0 91.0 10.0 UNITS MGD UNITS U

O O

O F

F F

F FREQ CONT 1/WK 2/, 6/ CONT 3/, 6/ CONT 3_/, 6_/ CONT 3_/, 6/ CONT 4/, 6/ CONT 56.1 l

65.9 l

9.6 1

ggoj 2

1901 7.8 53.6 l

l 59.6 l

5.0 3

1901 51.0 l 55.9 l

3.9 4

1901 48.8 l

l 5

1901 46.8 l

l 6

1901 47.2 l

l 7

1901 48.1 l

8 1901 7.7 47.6 9

1901 46.9 l

l 10 1901 47.0 l

l 11 1901 43.4 l

12 1901 42.5 l

13 1901 42.6 14 1901 41.5 51.2 8.4 15 1901 42.9 l 48.6 l

4.5 m

~

Q 16 1901 7.7 41.7 l

l l

17 1901 42.6 l

~~

18 1901 41.7 1

l 46.1 4.8

~

l9 1901 42.5 48.9 6.1 20 1901 38.7 44.6 l

4.8 35.6 21 1901 42.4 6.8 22 1901 36.6 l

39.I 2.8 23 1901 37.7 41.6 3.4 24 1901 39.1 42.9 4.7 25 1901 39.5 45.7 6.2 26 1901 37.5 8503080386 850131 43./

b.1 PDR ADOCK 05000259 28 1901 37.6 _

R PDR 44.9 7.4 27 1901 37.5 l

U9 1901 7.8 38.0 43.4 5.9

'30 1901 39.1 M

47.I 8.5 31 1901 40.4

/*F y 46.3 5.8 MAX 1901 56.1

((

M4 o_6 AVG 1901 7.7-7.8 43.0 Oll 47.7 5.8 I certsfy under penalty of law that this document and all attachments were prepared under the directson or supervosson on accordance wotn a system designed to assure that qualsfied personnelproperty gather and evaluate the Informatson submstted C: sed on my snquiry of the person or persons who manage the system, or those persons directly responsoble for gatherung the Informatoon, the snformatson submstled Is. *o the best of my knowledge and belsef, true, accurate, and complete. I am aware that there are sognsticant penaltnes for submstling false Informatson, oncludong the possibristy of inne and smptssonment for knowong

  • ##"*'* DATA NOT AVAILABLE.
  • S AI[?'bE IfADVERTENTLY NUT ANALYZED.

b Sognature of Responsobte Offacsal Date.

ADEM Form 43 3/84

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority DSN 102: SEDIMENTATION POND Browns Ferry Nuclear Plant EFFLUENT Athens, Alabama 35611 MONTH JANUARY 19 85 NPDES # AL0022080 PARAM FLOW pH O&G TSS AVG 6.0 15 30 MAX 9.0 20 100 UNITS MGD UNITS MG/L MG/L FREQ 1/ BATCH L/ BATCH 1/BATCHl/ BATCH I

l l

l l

l l

2 ';0 FLOW l

l l

l l

3 l

l l

l 4

l l

l 5

l l

6 l

7 8

l 9 t;o ptow 10 11 12 13 14 15 30 ytow l

H wy 16 l

17 l

18 l

ll 19 20 21 l

22 NO FLOW H

23 l

24 25 26 27 28 l

l M:;0 FLOW i

10

~

31 MAX AVG CO FLOW I c:stify under penalty of law that this document and all attachments were prepared under the direction or supervosion on cccordance witn a system dessgned to assure that qualoisedpersonnelproperly gather and evaluate the enformatoon submitted.

C: sed on my Inquory of the person or persons who manage the system. or those persons directly responsoble for gatherong the snformatoon, the unformatoon submstted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are segnotocant penaltres for submottsng false informatoon, including the possibility of lone and improsonment for knowong vool:tions Sognature of Responsoble Officsal Date.

ADEM Form 43 3/84

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority DSN 103:

UNITS 1, 2, AND 3 Browns Ferry Nuclear Plant TURBINE BUILDING SUMP Athens, Alabama 35611 MONTH JANUARY 19 85 NPDES # AL0022080 PARAM N

O&G TSS AVG 15 30 MAX 20 100 UNITS MGD MG/L MG/L FREQ 1/WK 1/WK 1/WK 1

l l

l l

l 2

l l

l 3 0.158

<5.0 2.3 l

l 4

l l

5 l

l 6

l l

7 l

l 8

l l

l 9

l l

l 10

<s n l

l 11 8.9 l

l 12 l

l 13 14 15 l

l g

Q 16 l

l 17 0.144 -

<5.0 9.0 l

l g

18 l

l

~

19

-1 l

20 l

21 22 l

23 l

24 0.144

<5.0 16 l

25 26 27 28 l

69 30 31 0,144

<5.0 11 MAX 0. 15 8

<s n 16 AVG 0.118

<5.0 9.4 i Gcrtofy under penally of law that this document and all attachments were prepared under the directron or supervoston on Eccordance wotn a system designed to assure that qualofoed personnelproperly gather and evaluate the information submitted.

Bas:d on my onquory of the person or persons who manage the system. or those persons detectly responsible for gatherung the enformatoon, the Informatoon submotted os, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are sognotocant penaltoes for submotting false informstron, includong the possiboloty of tone and imprisonment for knowong

'dO88t'005* FLOW RATE INADVERTENTLY NOT CHECKED.

Sognature of Responsible Official Date.

[ADEMFGrm433/84

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority DSN 104:

LlQUID RADWASTE SYSTEM Browns Ferry Nuclear Plant Athens, Alabama 35611 MONTH JANUARY 19 85 NPDES # AL0022080 TOTAL TOTAL PARAM FLOW O&G TSS Cu Fe TSS*

AVG 15 30 30 MAX 20 100 1.0 1.0 100 UNITS MGD MG/L MG/L MG/L MG/L MG/L FREQ 1/ BATCH 2/WK 2/WK L/BATCHL/ BATCH 1

l l

l l

l 2

1 l

l

[

3 0.012

<s.n 9.1 l

l l

l 4

l l

l 5

0.017 (s_n so l

l l

6 0 n14 l

7 0.011

<s.n (1 n 8

n.n46

<s n 6.2 l

9 n 014 l

10 0_081 15 1.5 12 1

11 j

12 n_n14 13 0.012 18 15 14 n nal

<s n

<1 n

1 15 n.n74 i

my 16 0.122

<5.0 17

?

17 0.073

<5.0

<1.0 l

18 n_nR7

<s.n 9.1 l

j 19 o 113 20 n_046 11 5.7 l

21 l

)

22 o 034 l

l J

23 n nna s.1 22 24 n_11s 6.1 in 7.5 25 0.ogs g.1 9.8 26 0.074 27 n_n67 l

28 n_n11 l

M n nR7 16 6.7 12 10

~

31 0.046

<5.0 22 MAX n 197 1R in so AVG n_ns6

<7.8

<4.6 16 I c:rtoly under penalty of law that thus document and all attachments were prepared under the direction or supervoston on Eccordance worn a system designed to assure that quatofoed personnel properly gather and evaluate the onformation submitted.

C sed on my onquory of the person or persons who manage the system, or thosepersons directly responsoble for gatherung the onformation, the onformation submotted os, to the best of my knowledge and bolset. true. accurate, and complete. I am aware that there are signifocant penaltors for submottong false information, oncludong the possibokty of tone and improsonment for knowong voofatoons.

Sognature of Responsoble Offocoal Date.

ADEM Form 43 3/84

..,.,_--___=

ALABAMA DEPARDfENT OF ENVIRONME :TAL MANaCEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority DSN 105:

RESIDUAL llEAT REMOVAL Browns Ferry Nuclear Plant Athens, Alabama 35611 MONTH

.TANIIARY 19 R5 NPDES # ALOO22080 PARAM FLOW TEMP AVC MAX UNITS MCD F

FREQ 1/gg 1/gg 1

ll l

l l

l 2

l l

l l

3 l

l l

4 l

l 5

l l

6 l

7 8

1 l

9 l

l 10 I

i 11 12 13 14 15 l

l gy 16 l

r 17 l

l l

18 i_is ing l

19 l

~

20 l

21 l

l 22 I

I 23 i,is iss l

24 25 26 27 l

28 l

is l

l

~

30 I

31 MAX

, is ing AVC n 46 172 l

1 cStisfy under penally of law that this document and all attachments were prepared under the direcison or supervosson on Cccordance wotn a system designed to assure that Qualifsed personnel properly gather and evaluate the onformatson submstted.

Based on my onqusry of the person or persons who manage the system. or those persons dotectly responsoble for gatherong the Informatson, the snformatson submstled os, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signotscant penalties for submstting false informaison, sncluding the possibolstv of fone and smprssonment for knowong 1

l voolatsons OUT OF SERVICE JANUARY 1-15, 1985.

  • SAMPLES WERE INADVERTENTLY h0T COLLECTED.

Sognature of Responsoble Offocsal Da te.

ADEM Form 43 3/84

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCllARGE MONITORING REPORT Tennessee Valley Authority DSN 106:

CONDENSER COOLING WATER Browns Ferry Nuclear Plant PUMP STATION SUMP Athens, Alabama 35611 MONTH JANUARY 19 85

!EDES # AL0022080 PARAM FLOW O&G TSS AVG 15 30 MAX 20 100 UNITS MGD MG/L MG/L FREQ 1/gg 1/gg 1/gg 1

l l

l l

4 2

l l

l

[

3 l

l l

4 0.00

<s.O s_n l

l 5

l l

6 1

l 7

8 l

9 1

l 10 l

l 11 0.036

<5.0

<1.0 l

12 4

13 14 15 Q

16 17 l

18 l

19 n_n?9

<s n s_6 20 1

1 21 l

22 l

23

[

24 25 26 n.016 (s.0 7_6 27 28 l

49 fo

~

31 MAX 0.043

<5.0 7.6 AVG 0.016

<5.0

<4.8 I certsfy under penalty of law that this document and all attachments were prepared under the direction or supervssion on cccordance wit.1 a system designed to assure that quatofted personnel properly gather and evaluate the informatron submstted.

Ccsed on my onquory of the person or persons who manage the system. Or those persons directly responsible for gatherung the information, the Informatson submatted os, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signaticant penalties for submattong false informstron, oncluding the possiboloty of lone and imprisonment for knowing vo:latoons.

Sognature of Responsible Ofhcral Date.

ADEM Form 43 3/84

ALABAMA DEPAR'DIENT OF ENVIRONMENTAL MANAGEMENT

~

DISCHARGE MONITORING REPORT Tennessee Valley Authority DSN 107: UNIT 3 CONTROL Browns Ferry Nuclear Plant BUILDING DRAIN Athens, Alabama 35611 MONTH JANUARY 19 85 NPDES # AL0022080 PARAM FLOW 0&G TSS AVG 15 30 MAX 20 100 UNITS MGD MG/L MG/L FREQ 1/WK 1/WK 1/WK 1

l l

l l

l 2

0.0009 (s O 11 l

l 3.

l l

l 4

l 5

l 6

l 7

l 8

9 l

10 l

11 0.0022

<5.0 2.1 12 13 14 15 n _ nni s

<s n ta g

~

y 16 17 1

~

18 l

19 l

20 l

21 l

22 Nn FT n2 23 l

24 I

25 26 27

[

28 1

39 No FT 0M 10 31 MAX 0.0022

<5.0 11 AVG n nnno (s.n s_s I certify under penalty of law that this document and all attachments were prepared under the directron or supervssion on Cccordance witn a system designed to assure that qualoised personnet properly gather and evaluate the Informatron submstted C:: sed on my Inqusly of the person or persons who manage the system, or those persons directly responsoble for gatherung the Informstron, the snformatoon submitted Is, to the best of my knowledge and belief, true accurate, and complete. I am aware that there are signitscant penalties for submitting false information, including the possibalsty of fine and improsonment for knowong vsolations.

l Senature of Responsoble Official Da te.

ADEM Form 43 3/84 u

i ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority DSN 108:

UNIT 1 AND 2 DIESEL Browns Ferry Nuclear Plant GENERATOR BUILDING SUMP Athens, Alabama 35611 MONTH JANUARY 19 85 NPDES # AL0022080 PARAM FLOW 0&G TSS AVG 15 30 MAX 20 100 UNITS MGD MG/L MG/L FREQ 1/WK 1/WK 1/WK l

l l

l l

l 1

2 0.0012 6.6 17 l

l l

I 3

l l

l 1

4 l

l l

l 5

l l

i 6

7 1

\\

8 l

l

[

9 No ptow l

l

[

10 j

l 11 l

l l

12 l

l 13 I

[

14 l

L 15 30 ptow l

[

Q 16 17 ll t

18 l

19 20 21 22 go prow 4

23 24 25 26 l

27 l

l 28 l

l

$29 l

vn n nt' I

30 l

31 l

=

l MAX 0.0012

[

AVG n.0002 6.6 17 I certsfy under penalty of law that this document and o!I attachments were preoared under the direction or supervosen o accordance witn a system dessgned to assure that qualsised personnet properly gather and evaluate the information subruttet Based on my onquory of the person or persons who manage the system. or those persons directly responssble for gatherung tt, onformatron, the snformation submstled us, to the best of my knowledge and belief. arue, accurate, and complete, I am aware th<

there are significant penalties for submittong false information, encluding the possebsloty of fone and Improsonment for knowon voolations.

Sognature of Responsible Officoat Date.

ADEM Form 43 3/84

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority DSN 109: UNIT 3 DIESEL GENERATOR Browns Ferry Nuclear Plant BUILDING SUMP Athens, Alabama 35611 MONTH JANUARY I9 85 NPDES # AL0022080 PARAM FLOW O&G TSS AVG 15 30 MAX 20 100 UNITS MGD MG/L MG/L FREQ 1/WK 1/WK 1/WK 1

l l

l l

l l

2 i

l l

I an vi nu 3

l l

l 4

l 5

6 l

l 7

8 l

9 30 ptow l

l 10 l

11 l

12 l

13 14 15 go ptog l

j w

Q 16 l

17 i

l 18 l

19 20 l

21 l

22*

l Nn vi nu 23 24 25 26 27 28 l

69 no pr og 30 31 l

max

~

AVG vn vi nu i c:rtoly under penalty of law that this document and all attachments were prepared under the direction of superviston on Cccordance wotn a system designed to assure that quahfoed personnel properly gather and eva!uate the Information submitted.

C sed on my onqusty of the person or persons who manage the system, of those persons directly responssble for gatherung the Informstron, the enformatnon submstled os, to the best of my knowledge and belief, true, accurate, and complete I am aware that there are signahcant penattoes for submstfang false enformstron, including the possibthly of hne and improsonment for knowong voolations Sognature of Feesponsoble Othcoal Date.

ADEM Form 43 3/84

a ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority DSN 110: UNITS 1 AND 2 0FFICE Browns Ferry Nuclear Plant BUILDING DRAIN Athens, Alabama 35611 MONTH JANUARY 19 85 ITDES # AL0022080 PARAM FLOW O&G TSS AVG 15 30 MAX 20 100 UNITS MGD MG/L MG/L FREQ 1/WK 1/WK 1/WK 1

l l

l l

1 2 30 ptow l

l 3

l l

4 ll 5

1 6

l 7

8 l

9 30 ptog 10 11 l

12 13 14 15 NO FLOW l

g Q

16 17 18 l

l 19 l

20 21 22 NO FT.OW 23 24 25 lb 27 2.8 l

8 l

NO FiOW

.Tb

~

31 MAX AVG NO FIOu I c:rtify under penalty of law that this document and all attachments were prepared under the direction or supervoston on accrrdance wrth a system designed to assure that qualofred personnel properly gather and evaluate the enformation submitted Based on my snquory of the person or persons who manage the system, or those persons directly responssble for gatherung the enformatoon, the informatron submitted os, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signaticant penalties for submitting false enformatron, including the possiboloty of fine and improsonment for knowong vool:tions Sognature of Responsobre Othcial Da te.

ADEM fcrm 43 3/84

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority DSN 111:

SEWAGE TREATMENT PLANT Browns Ferry Nuclear Plant Athens, Alabama 35611 MONTH JANUARY 19 85 NPDES # AL0022080 PARAM FLOW BOD TSS 5

AVC 30 30 MAX 45 45 UNITS MGD MG/L MG/L FREQ 5/WK 1/WK 1/WK 1

l l

l l

2 30 ptog l

l 3

l l

4 l

l 5

l l

6 l

l 7

1 8

l 9 NO FLOW l

10 l

11

[

12 13 14 15 30 prow l

w Q

16 l

17 l

l 18 l

19 20 l

21 l

22 l

yn ptny 23 24 25 26 27 28 l

l

&9 l

No vi ou 30 31 MAX l

AVC l

yn ptny I c:rtoly under penalty of law that thos document and all attachments were prepared under the detectron or supewosson on Cccordance with a system desogned to assure that qualofred personnet properly gather and evaluate the mformatoon submotted.

Bas:d on my onquory of the person or persons who manage the system. or those persons detectly responsoble for gatherong the snformation, the snformatoon submotted os, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are sognefocant penaltoes for submolling false enformatron, sncludong the possiboloty of fine and improsonment for knowong vool:toons Sognature of Responsoble Offocial Da te.

. ADEM Form 43 3/84

_