ML20108D421
| ML20108D421 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 02/26/1985 |
| From: | Danni Smith COMMONWEALTH EDISON CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| 9806N, NUDOCS 8503080358 | |
| Download: ML20108D421 (6) | |
Text
_ _ _ _ - _
Commonwealth Edison One First National Plaz-1, Chicago Ilknois Address Reply to: Post Office Box 767 Chicago. lifinois 60690
~
February 26, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Braidwood Station Units 1 and 2 Request for Exemptions from Observation Training per 10CFR 55.7 NRC Docket Nos. 50-456 and 50-457 References (a):
September 28, 1984 letter from J. G. Marshall to H. R. Denton concerning Observation Training Exemptions (b):
January 3, 1985 letter from W.
S. Little to J. G. Marshall
Dear Mr. Denton:
Reference (a) requested exemptions from Observation Training for selected individuals at our Braidwood Station.
Reference (b) granted waivers for some of the individuals and requested additional information for others.
Attached are resume's taken from the FSAR and updated for Messrs. Cretens and McGee.
With them is a corrected operating shift experience data sheet showing that Mr. Baer's SRO License was on a "Same Type" Plant instead of an "Other type" plant as inadvertently shown in reference (a).
This information should be sufficient to satisfy the reference (b) request.
Waivers for Messrs. Herbert and Bowers are no longer requested since they began observation training on January 7, 1985.
8503080358 850226 8 I PDR ADOCK 05000456 v
V PDR
2-Please direct any questions you may have concerning this matter to this.of fice.
One signed original and fifteen copies if this letter and its' attachment are provided for your use.
Very truly yours, David H. Smith Nuclear Licensing Administrator
'bs cc:
Joseph I. McMillen - RIII Don H. Beckham - NRR Operator Licensing Branch 9806N L__
ASSISTANT SUPERINTENDENT, OPERATING - BRAIDWOOD STATION NAME:
Phillip G. Cretens CITIZENSHIP:
United States of America AGE:
41 PRIOR AEC/NRC LICENSE (S):
SR0 Quad Cities 1/2, S0P-3447, 3-14-79 SRO LSCS 1, SOP-4112,11,18, 81 FORMAL EDUCATION:
B.S.E.E., University of Michigan, 1969-1973 TRAINING:
License Training and SR0 Certification, Braidwood Station,1984 License Training, LaSalle Station, 1981 SCRE Augmented Training. LaSalle Station, 1980 SR0 Certification, Westinghouse N.T.C. Zion,1980 License Training, Quad Cities,1978 Nuclear. Power School, U.S. Navy,1965 Submarine School, U. S. Navy,1963 Electronics Technician School, U. S. Navy, 1962.
WORK EXPERIENCE:
Commonwealth Edison Company Starting Date:
August 1973 Total Work Experience:
19 years 4-83 to Present:
Assistant Superintendent, Operating -
Braidwood Station 8-79 to 4-83:
Operating Engineer at Braidwood Station 9-81 to 11-82:
SCRE at LaSalle County Station 12-80 to 9-81:
License and SCRE Training at LaSalle County Station 3-80 to 12-80:
Assigned "Special Projects: at LaSalle Station LGS (Symptomatic) Procedures GSEP Exercise Coordinator-Operating Procedure Preparation and Review 9-79 to 2-80:
License Training at Westinghouse N.T.C., Zion 2-79 to 8-79:
Shift Foreman at Quad Cities Station
PHILLIP G. CRETENS.
8-78 to 2-79:
License Training at Quad Cities Station
~
6-77 to 8-70:
Radwaste Supervisor at Quad Cities Station 5-76 to 6-77:
Staff Assistant to Maintenance Engineer at Quad Cities Station
.9-74 to 5-76:
Thermal Engineer (Mechanical and Electrical Group Leader) in Technical Staff at Quad Cities 8-73 to 9-74:
Technical. Staff Engineer at Quad Cities 6-62 to 6-69:
Qualified Reactor Operator, Electronics Technician, Qualified in Submari.ies Assigned to U.S.S. Pargo, SS(N) 650; Assigned to U.S.S. Lafayette, SSB (N) 616; Assigned to U.S.S. Gudgeon, SS(N) 567 I
.y.
1 TRAINING SUPERVISOR, BRAIDWOOD STATION'
.j 1NAME:
William E. McGee CITIZENSHIP:
United States of American AGE:
39-PRIOR AEC/NRC LICENSE (S):
.SRO Dresden Units 2/3 (1977 - Dresden 2; 1980. Dresden 2 & 3)
FORMAL' EDUCATION:
B.S., Mathematics, Illinois Institute of Technology, 1966' M.S., Mathematics,-University of Illinois, 1967 M.B.A., Northern Illinois University,1984 -
TRAINING:-
United States Navy Nuclear Power School and Prototype Training General Electric BWRTC Certification; Morris, Illinois
License Training and SR0 Certification, Braidwood Station, 1983 WORK EXPERIENCE:
Comonwealth Edison Company Starting Date: 9-19-78 Total Work Experience:
18 years
~2/83 to Present:
Training Supervisor for Braidwood Station 6/82 to 2/83:
Shift Foreman at Dresden Station 2/80 to 6/82:
Group Leader, Technical Staff, Dresden Station 9/78 to 2/80:
Staff Assistant, Technical Staff, Braidwood Station 7/76 to 9/78:
Instructor, General Electric BWRTC, Morris, Illinois 7/67 to 6/76:
United States Navy
i l*
OATE 0/31/B4
~~
PLANT MAf1E Bra f dwood ;
OPERATING SHIFT EXPERIENCE UTILITT Coninonwealth Edtson JOB TITLE: Shift Foreman 0.L. DATE August 1985 NUCLEAR POWER PLANT EXPERIENCE (NOTE 2)
FOR OPERATING SHIFT POSITIONS (NOTE 1) t l
ENTER DATA: MONTHS / MONTHS I WEIGHTING FACTOR TYPE OF EXPERIENCE FACTOR CRE0!T Nfqinbotham Bush Meents McCoy Bgst Chofnicitt Swf rt Weber Ener Habel 1.
SAME TYPE C0ittERCIAL SRO '
1.00 NO LIMIT
\\
9N 2.
OTHER CQttERCIAL SRO '
.75 NO LIMIT 3.
SAME TYPE C0mERCIAL R0 1.00 NO LIMIT e
4.
OTHER CGYtERCIAL R0
.75 NO LIh!T gl 3.
NAVY (MILITART) NUCLEAR 36 MONTM R0, EWS. E00W. PPWS)
.50 21 m 36 m 12 m 12 m 6m OTHER)
.25 42 m 120 m 48 m 49 m ga
?.
$1MULATOR 12 MONTHS 3.5 m 3.5 m 3.5 m 3m 3m 3m (REFERENCE PUNT) 5.00 (12f10NTHS)
($1MILAR) 3.00 (9 MONTHS) 3w 3w 3w 4w 4w 4w 7
NUCLEAR PLANT EXPERIENCE C"15; TIFT (OWN PLANT) 24 MONTHS
\\"
(LESS THAN I TEARS PRIOR TO F.L.
.75 12 NONTHS 6a 2m 2m 38 m 45 m 25 m (MORE THAf! 1% TEARS PRIOR TO F.L.
.50 12 MonT;is 3,
1 LICENSED CLASSROOM TRA!'NING AND EIAM
.50 9 MONTHS 6
6 N
7 PARTICIPATION AT OPERATING Pl. ANT
.75 12 MONTHS 9
).
OTHER NUCLEAR PUNT EXPERIENCE
.25 12 MONTHS 7
8
. CONDUCTING LICENSE TRAINING
.25 9 MONTHS
. DEGREE (ENGINEERING. APPLIED SCIENCE OR
\\
EQUITALENT) i I"
12 MONTHS BACHELORSCEGREE)
(12 MONTHS 55 ASSOCIATES CEGREE)
AS TOTAL NUCLEAR PLANT EXPERIENCE:
45.5 m 36.5 m 55.5 m 45 m 43.5 m 32.5 m 48 m 34 m 61 m 51 m l
HOT PARTICIPATION EXPERIENCE TIr1E 20% PWR/8WR (WKS) 54 w (BWR, 134 w (BlR)
- 93 w
- 33 w 101 w (BW()
STARTUP & $ HUT 00WN (TES/NO) yes (BWR) yes (BWR yes yes yes (BWR)
MONTHS CN $HIFT 20 M (BWR, 49 m (BWR) 34 m 12 m 52 m (BWA)
NOTE 1: SEE
- INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)*
CHECK ONE OF THE FOLLOWING:
NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55). SHIFT SRO'S. REACTOR OPERATORS (RO)O a-g,y,*,d'g,y,,t y,p,y l,o 3,t,yg,y,y ***
AND SHIFT TEHCNICAL ADVISORS (STA).
- This time f s based on 751 availability of CECO's Zion Nuciear Power Station
- 06. Shirt advisors wiii Probabir be required. at least for so-e shirts.
- This time is based on 75% availability of Winrnnsin E'ertrfr Power's Point Beach O
c-Do aat Plaa to use shirt savisors Waless so'"e uatoreseea circumstaace arises Mucipar PoMr $tatto a
O 1
M'
- 5' F4 h
es e g