ML20108C983

From kanterella
Jump to navigation Jump to search
Forwards Sets of Reproductions of Current Rev to Project Drawings Ref in Plant Ufsar,Rev 13.Ensure One Set of Project Drawings Forwarded to LPDR.W/507 Oversize Drawings
ML20108C983
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/29/1996
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20108C984 List: ... further results
References
NUDOCS 9605070225
Download: ML20108C983 (1)


Text

..

f Southern Nucisst Operating Company i

Post Office Box 1295 i

Birmingham, Alabama 35201

,, Teltphone (205) 868-5131 L

Southern Nudear Operating Company o... uor.,

Vce President Farley Project April 29,1996 the southem electnc pstem Docket Numbers: 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant (FNP) l Submittal of Project Drawings I

Ladies and Gentlemen:

I Attached for your information are two sets of reproductions of the current revision to those project drawings referenced in the FNP Updated Final Safety Analysis Report, Revision 13. Please ensure 1

one set of project drawings is forwarded to the local PDR.

if there are any questions, or if additional information is needed, please advise.

Respectfully submitted, i

Wh lllw Dave Morey I

1 DRC/r13 draws. doc Attachments: Project Drawings Referenced in FNP's Updated FSAR, Revision 13 N.,

cc:

U. S. Nuclear Regulatory Commission. Washincton. DC Mr. B. L. Siegel, NRR Senior Project Manager (w/2 attachments) i U. S. Nuclear Regulatory Commission. Region II i

Mr. S. D. Ebneter, Region II Administrator (w/0)

Mr. T. M. Ross, FNP Senior Resident inspector (w/0) 0 gt 070000 90, 4.'

fp jf1885M8$jjge i i g

.]

1 OVERSIZE l

DOCUMENT

~

PAGE PULLED l

l SEE APER URE CARDS NUMBER OF OVERSIZE PAGES FILMED ON APERTURE CARDS j

~

r i

AP5RTURE CARD /HARD COPY AVAILABLE FROM MECORDS AND REPORTS MANAGEMENT BRANCH 9

9 g

e 6

e e

0

-