t

~

Commonwealth Edison Quad Cities Nucrar Power Station 22710 206 Avenue North Cordova. Illinois 61242 l

Telephone 309/654-2241 j

6i

-2 0 " g,6 50 NJK-84-345 h

November 1, 1984 Mr. Edson G. Case, Deputy Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission liashington, D. C.

20555 Dear Mr. Case Enclosed please find a listing of those changes, tests, and experi-ments completed during the month of October 1984, for Quad-Cities Station Units 1 and 2, DPR-29 and DPR-30.

A summary of the safety evaluation is being reported in compliance with 10 CFR 50.59.

Thirty-nine copies are provided for your use.

Very truly yours, COMMONWEALTH EDISON COMPANY QUAD-CITIES NUCLEAR POWER STATION l/,

8 N. J Kalivianakis Station Superintendent bb Enclosu re cc:

B. Rybak 0

8411190153 841101 PDR ADOCK 05000254 sS R

PDR b

f{br:

~

-~

1 e s 1

Modi ficat ion M-4-1 (2)-78-20.

~

Descripilon-Additional local instrumentation'has.been installed in the RCIC room

- to allow ~ local startup and_ control of the RCIC_ pump.' The instrumentation includes ON/0FF switches for:the' vacuum pump and the Condensate pump;

. Reactor-water : level, and pump speed and flow indicators. This modifica-tion _was performed to satisfy a NRC commitment for Fire Protection safe 1 shutdown.

Evaluation This modification enhances the RCIC System since the Operator has nar<e effective control of the RCIC pump during local operation. All.

Instruments and switches are equivalent in design to existing installed equipment.

Modification M-4-1-81-2' Description This modification installed Marathon terminal blocks in the Drywell Junction boxes associated with the Electromatic Relief Valves 1-203-3B, 3C, 3D, and 3E. The existing Junction boxes were replaced with larger boxes in order to accommodate the blocks. The Marathon terminal blocks were environmentally qualifed and have a qualified voltage rating of 240 volts. The modification was acccmplished by replacing the existing Junction boxes with larger ones and installing the Marathon terminal-blocks inside.

Evaluation The installation of Harathon terminal blocks increases the margin of safety by providing a method of making environmentally qualified.

electrical connections.

In addition, the qualification of these blocks i

provides assurances that the Electromatic Relief Valves will function as designed when needed.

L.

j

s c.;

y

' Modi fication M-4-1-80-22 Description This modification upgraded the r.nchorage of various safety related instrument-racks,' MCC's, buses, and distribution panels in order to seismically qualify them. The modification is a result of I.E.

Information notice 80-21, " Anchorage and Support of Safety-Related

-Electrical Equipment". The upgrade was accomplished by installing braces or additional welds.

Evaluation The additional bracing of the equipment and. foundations on which that' equipment rests will improve the:cepability of this equipnent to withstand a seismic event.

I I