_
AYlll AGE DAILY UNIT P0h1R LEVEL o.
DOCKET NO.
50-250 Turkey Point t
UNIT Unit 3 DATE 10/15/84 N. W. Grant COMPLETED BY (305) 552-3675' TELEPilONE MONTH September 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
-(MWe Neil 3
657 17 656 658 2
18 664 3
658 668 39 20 675 S
660 23 677 6
659 672 22 664 7
23 673 674 8
28 666 9
25 679
~
682 10 662 26 660 27 fA6 658 d86 g,
2S
~
13 663 29 681 655 34 30 673 35 655 31 659 16 INSTRUCTIONS On this forsnai.hst the aserage daily unit power leselin MWe Nei fot each day in the reporting in.inth. Compute to the nearest whole twpwaii.
(9/77) 8411150139 B40930 PDR ADOCK 05000250 gy PDR R
/
//
l OPER ATING D/.TA REPORT
)
DOCKET NO. 50-2h0 DATE -10/15/84 COMPLETED BY N. W. Grant TELEPHONE (3051552-3675 OPERATING STATUS Notes
- 1. Unit Name:
Turkey Point Unit 3
- 2. Reporting Period:
September 1984 Unit 3 Operated at 2200 essentially full power.
- 3. Liansed Thennal Power (MWI):
/60
- 4. Nameplate Rating (Gross MWe):
693
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe).
700 666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasone
- 9. Power level To Which Restricted,If Any (Net MWe):
- 80. Reasons For Restrictions.lf Any:
This Month Yr to Date Cinnulative
- 11. Hours In Reporting Period 720 6,575 103,640.6
- 12. Number Of Hours Reactor Was Critical 720 5.61 3.3 71.919.5
- 13. Reactor Reserve Shutdown Hours 0
i 0
' 844.4
- 14. Hours Generator On-Line 720 5.503.8 71.425.8 0
0 121.8
- 15. Unit Reserve Shutdown }{ours
- 16. Cross Thermal Energy Generated (MWH) 1:562_568 11 812,047 147,300,639 3
- 17. Gross Electrical Energy Generated (MWH) 504,485 3,798,785 47,009,350 480,213 3,600,657 44,513,654
- 18. Net Electrical Energy Generated (MWH)^
l00.0 83.7 68.9
- 19. Unit Service Factor
- 20. Unit Availability Factor 100.0 83.7 69.0
- 21. Unit Capacity Factor (Using MDC Net) 100.1 82.2 66.3
- 22. Unit Capacity Factor (Using DER Net) 96.2 79.0 62.0
- 23. Unit Forced Outage Rate 0
12.6 6.0
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units in Test Status (Prior o Commercial Operation):
Forecast As hined e
INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPER ATION (9/771
50-250 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point Unit 3 DATE 10/15/84 COMPLETED BY N.W.
Grant REPORT MONTH September 1984 1ELEPHONE (305) 552-3675 l
e.
E c
- L Cauw & Corrective jg "h
j $* 5 Licensee
[*,
g*h i
N...
Date g
3g 4
2s5 Event u 'ir E
Prevent Recurrence jE 5
j;gg Report *
- a O H
g c5 Unit 3 had no " Shutdowns or Power i
Reductions".
i i
l t
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Resttietion 9-01her (Explain) 01611 E. Operator Training & Ucense Examination 9,
5 F-Administrative G-Operational Frner iFiplaini 4. /.
4.
Asswe
.d Eshibit I Same Source I
19/77)
Il-Other (Explain t
)
I
s-EUMMARY OF OPERATING EXPERIENCE DOCKET NO.
50-250 UNIT Turkey Point Unit 3 DATE October -15,1984 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH September 1984 Unit 3 op3 rated at essentially full power.
Inspection and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & L(ght Company commitments for NUREG-0737 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
O e
e AVlll AGE DAILY UNil Poh1R LF. VEL
~
DOCKET NO.
50-251 Turkey Point UNIT Unit 4 10/15/$4 DATE ant COMPLETED BY (305) 552-3675' TELEPilONE MONTH September 1984 DAY AVERACE DAILY POWER LEVEL DAY Aygp AGE DAILY POWER LEVEL IMWe Net)
, g g w,,g,,,
I 663 si 668 663 2
18 670 3
665 19 676 667 497 4
5 668 21 265 666 322 6
22 7
670 33 39) 675 672 g
21 9
674 25 680 to 669 3
681 666 II 3
633 12 669 28 541 672 13 14 665
~~~
30 668 15 31 16 668 INSTRUCTIONS On this format. list the averag daily unit pinwer leselin MWe Net for each day In the repiiriing in.inth.Coimpute to the Dearest whole ITj'Jwall.
(9/77) b N
OPER AT!NG DATA REPORT 50-251 DOCKET NO.
DATE 10/ lb/M COMPLETED BY N. W. Grant TELEPHONE (305)S52-3675 OPERATING STATUS l
Notes Turkey Point Unit 4
- 1. Unit Name:
September 1984 Unit 4 operated at full power
- 2. Repor'ing Period:
except as indicated in the 2200
- 3. Licensed Thermal Power (MWI):
Unit Shutdowns & Power 760
- 4. Nameplate Rating (Gross MWe):
Reduct' ions" Report.
693
- 5. Design Electrical Rating (Net MWe):
700
- 6. Maximum Dependable Capacity (Gross MWe):
666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasone
- 9. Power Level To Which Restricted,lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr to Date Cumulatise II. Hours in Reporting Period 720 6.575 97.372
- 12. Number Of Hours Reactor Was Critical 658.5 3,806.7 168,445.3
- 13. Resetor Reserve Shutdown Hours 0
6 0
' 166'.6
- 14. Hours Generator On-Line 655.3 3i633.0 66,101.1 0
0 31.2
- 15. Unit Reserve Shutdown Qours
- 16. Gross Thermal Energy Generated (MWH) 1,369,268 7,914,159 139,660,900
- 17. Gross Electrical Energy Generated (MWil) 440.6M _,..
2.462.485 44.383.787 417,936 2,320,533 42,024,592
- 18. Net Electrical Energy Generated (MWH).
91.0 55.3 67.9
- 19. Unit Service Factor
- 20. Unit Availability Factor 91.0 55.3 67.9
- 21. Unit Capacity Factor (Using MDC Net) -
87.2 53.0 66.6 83.8 50.9 6U
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 1.9 19.1 5.4
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eachl:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Uniss in Test Staius (Prior io Commercial Operation):
Forecast Athiaed INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION (9/771
s.
DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point Unit #4 DATE 10-15-84 CORWLETED BY N.W. Grant September
- 1984 (305) 552-36/T REPORT MONTH TELEPHONE
~:.:
c*
Ei Licensee
,E g g*.
Cause & Corrective
}s&
jg 2
Event
=7 q
Actiim to N..
Date c.
- E 4
C j@
y j ;ji; Repori a eG V
Prevent Recurrence 6
20 840920 F
12.9 A
3 251-84-21
'EB GENERA Reactor trip as a result of steam flow-feed flow mismatch and low steam generator level following a turbine runback. The runback resulted from a blown fuse in an inverter, which gave a dropped rod signal. The fuse was replaced and the unit returned to power, although full power operation was delayed due to secondary chemistry condition s and MTC verification.
I 21 840928 5
51.8 B
1 CB VALVEX Unit 4 removed from power operation to repair leakage to the pressurizer relief tank.
t 2
3 4
T Forced Reason:
Method:
Exhibit G. Instructions S Scheduled A Equipment Failure (Euplaml
- 1. Manual for Preparation of Data i
B Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C. Refueling
- 3. Automatic Scram.
Event ReporiILER) File (NUREC.
D-Regulatory Restrictiim
@-Other IExplaml 016I1 E-Operator Traming a beense Fsamination F-Administrative
)
G Operational Feror IFiptaml 4_
/.e 4. Ashwca..d Ethibit I Same Source (9/77)
II-Ot her i E xplain t
r--
t-
-o
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-251 UNIT Turkey Point Unit #4 DATE October 15,-1984 COMPLETED BY N. W. Grant (305) 552-3675 TELEPHONE REPORT MONTH September 1984 Unit #4 operated at essentially full power except as indicated in the " Unit Shutdowns and Power Reduction" Report.
Inspections and requirements of IE Bulletin and NUREG-0737 are continuing.
Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
AYLil AC.E DAILY UN11 POWE R LEVEL" DOCKE7 NO.
50-335 St. Lucie Unit 1 o
v3,.3 o
DATE 10/15/84 COMPLETED gy N. W. Grant (305) 552-3675 TELEPflONE MONTH September 1984 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Neil
-(MWe Net) 794
~
~~
3 g-y 18 796 3
77 841 g,
4 20 845 846
~~~
23 6
22 847 98 7
23 847 562 g
24 846 9
762 844 25 848 844 30 26 27 848 11 850 844 850 33 2g 13 Ros 29 848 14 249 835 30 707 15 31 16 796 o
INSTRUCTIONS On this forinai, list the average daily unit power leselin MWe Nei foi cach day in the reporting m.inth. Compute su the nearest whole ivraware.
OPER ATING DATA REPORT DOCKET NO. 5._0-335 DATE ]0/15/84 COMPLETED BY N. W. Grant TELEPHONE (305J5bz 5675 OPERATING STATUS Notes
- 1. Unit Name:
St. Lucie Unit 1 September 1984 Unit 1 Operated at Full Pcwer
- 2. Reporting reriod:
2700 except as Indicated in the
- 3. Licensed Thermal Power (MWI):
893 Unit. Shutdowns and Power
- 4. Namepiste Rating (Gross MWe):
Reductions" Report 830
- 5. Design Electrical Rating (Net MWe):
867
- 6. Maximum Dependable Capacity (Gross MWe):
822
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasonc
- 9. Power I.svel To which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr to.Date Cumulatise
- 11. Hours in Reporting Period 720 6.575 68.183
- 12. Number Of Hours Reactor Was Critical 711.7 3.377.5 47.843.6 0
i 0 205.3
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 555.9 31002.3 46.578.5 0
0 39.3
- 15. Unit Reserve Shutdown Qours
- 16. Gross Thermal Energy Generated (MWH) 1,415,580
_7,714,846 116,382,784
- 17. Gross Electrical Energy Generated (MWH) 465,310 2,563,180 37,937,055 436,781 2,403,007 35,737,780
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 77 3 45.7 68.3
- 20. Unit Availability Factor 77.2 45.7 68.4 73.8 44.5 66.2
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 73.1 44.0 64.6 22.8 9.0 4.9
- 23. Unit Forced 06tage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Staius (Prior o Commercial Operalion):
Forecast Arliined INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION j
m
v s-O
~*
~
DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS dL. Luue Unit #1 UNIT NAME DATE 10-15-84 N.W. Grant COMPLETED BY REPORT MONTH September, 1984 TELEPHONE (305) 552-3675
~5 E
{*b 1,
Cause & Corrective
.{ g 3
j E5 Licensee Et
^ ' " " ' "
No.
Date g
3g
(
2sE Event 3,7 E
Prevent Recurrence jE 5
j$g Report 8r mV H
g 6
10 840831 F
54.8 H
4 HF ZZZZZZ Excessive jellyfish in intake canal prevented plant operation at power.
Turbine generator vibrations re-quired reduced powerwhen the unit was raturned to operation.
11 840903 F
96.1 H
4 HF ZZZZZZ The unit was removed from power operation to balance the turbine and then kept shutdown due to excessive jellyfish in intake.
12 840914 F
13.0 H
H HF ZZZZZZ Excessive jellyfish in intake canal prevented plant operation at power.
The unit returned to operation at reduced. power initially to repair travelling screens.
I 2
3 4
F Forced Reason:
Method:
Exhibit G Instructions 5 Schedufed A Equipment Failure (Explain) 1 -Manual for Preparation of Data B. Maintenance or Test
- 2. Manual Scram.
Entry Sheets for Licensee C Refueling
- 3. Automatic Scram.
Event Report (LER) File (NUREG.
D Regulatory Restriction
%Other(Explaini 0161)
I -Operator Training A Ixenw Esamination p
F-Adnunistrative S
G-Operational Feror I F splain t s
/,eao A E ewc.v..,3 Eshibit I. Same Source es/77)
Il-Other ( E uplain)
I.
i
SUMMARY
OF OPERATING EXPERIEECE DOCKET NO.
50-335 UNIT St. Lucie Unit 1 DATE October 15, 1984 COMPLETED BY N. W. Grant
~
TELEPHONE REPORT MONTH September 1984
~
Unit #1 operated at essentially full power except as indicated in the
" Unit Shutdowns and Power Reduction" Report.
Inspections and requirements of IE Bulletins' and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety. valves during the report month.
t e
_.,___m_._._.__
m
..m
.m
r
~
AVLil AGE DAILY UNil Pow 1g tr,ytt s:
DOCKET NO.
50-389 St.Lucie Unit 2 UNIT DATE 10/15/84 N. W. Grant COMPLETED BY TELEPilONE (305) 552-3675 MONTH SeDtember 1984 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe. Net)
.(MWe-Neil 3
17 780 743 la 3
19 7n7 796 4
20 g
21 799
~~-
800 6
22 7
23 800 768 g
2.s 92 9
25 775 680 804 to 26 II 722 27 804 685 12 28 804 13 685 8 01 29 601 8 01 14 30 IS 664 31 707 16 INSTRUCTIONS On this format.hst the aseiage daily unit power leselin MWe Net fut each day in the reporting :nonth. Compute to the nearest wheele twgaware.
4 /771 9
~
l.
OPER ATING DATA REPORT DOCKET NO. 5,0-3h9 DATE.10/15/84 COMPLETED BY N.W. GRANT TELEPHONE (305)SS2-3675 OPERATING STATUS Notes
- 1. Unit Name:
St. Lucfe Unit 2 September 1984 Unit 2 Operated at Full Power
- 2. Repo@esd:
2560 except as Indicated in the
- 3. Licensed Thermal Power (MWI):
" Unit Shutdowns and Power 850
- 4. Nameplate Rating (Gross MWe):
Reduct'. ions" Report.
804
- 5. Design Electrial Rating (Net MWe):
832
- 6. Maximum Dependable Capacity (Gross MWe):
700
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasone
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to Date Cumulative 79n 6,575 10,080 I1. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 577.9 6,380.9 9.607.9 0
0 0~
- 13. Resetor Reserve Shutdown Hours
- 14. Hours Generator On.Line 513.2 6.179.7 9.310.1 0
0 0
- 15. Unit Reserve Shutdown Qours
- 16. Gross Thermal Energy Generated (MWH) 1.242.195 15.623.970 23.281.914
- 17. Gross Electrical Energy Generated (MWH) 402.980 5,216.6R0 7;754; Ann 375,570 4.929,859 7.327.445
- 18. Net Electrical Energy Generated (MWH)'
71.3 94.0 92.4
- 19. Unit Service Factor 71.3 94.0 92.4
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 66.4 95.4 92.5 64.9 93.3 90.4
- 22. Unit Capacity Factor (Using DER Net) 19.2 4.2 6.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:
Refuelina. October 13.1984. 5 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Atleined INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPER ATION e
i-DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME L. Lucie-Unit 2 10-1b-64 DATE N.W. Grant September,1984 Cosee ETED BY REPORT MONTH TEI. N (305) 552-3675 E
E
[g 3
j E'i Licensee
,E
- Cause & CurrectIve
^ " '
N..
Date i
3g i
2s&
Event l'!
Ed g5 5
jg Report 8 mO Prevent Recurrence H
g 6
08 840831 F
121.9 H
4 HF ZZZZZZ Excessive jellyfish in intake canal prevented plant operation 09 840906 S
84.9 8
4 HH ZZZZZZ The above outage was continued to perform maintenance on the secondary system. The unit returned to oper-ation initially at re.duced load due to secondary chemistry requirements and turbine controls.
10 840914 F
0.0 H
5 HF ZZZZZZ Power was reduced for about 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> due to excessive jellyfish in intake canal.
I 2
3 4
F Forced Reaum.
Method:
Exhibit G. instructions C Scheduled A Equiprnent Failure (Euplam) 1-Manual for Preparation of Data B Maintenance or Test 2-Manual Scram-Entry Sheets for I.ieensee C Refueling 3-Automatic Scram.
Event Report t t.ER) File (NUREG-D-Regulatory Restriction
$Other(Explaml 0161)
E-Operator Trammg A txense Fuamination p
5 F-Administ rative G-Operational Ferier f F tplain) 4.
4 4.
Asewc.w.4 Eshibit I Same Source 49/77)
Ilother f Euptam t
_ ~ -
1
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-389 UNIT St. Lucie Unit '#2 DATE October 15, 1984 COMPLETED BY N. W. Grant
(
~
TELEPHONE REPORT MONTH September 1984 I
Unit 2 operated at essentially full power except as indicated in the
" Unit Shutdowns and Power Reduction" Report.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
?
Florida Power & Light Company commitments for NUkEG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional in formation.
In accordance with requirements of Technical specification 6.9.1.6 there were no challenges to PORV or safety valves during the report month, i
0 4
h ',
FLOHIDA POWER & LIGHT COMPANY October 15, 1984 PNS-LI-84-359 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Attached are the September 1984 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.
Very truly yours,
&CJ J. W. Willi
, Jr.
Group Vice resident Nuclear Energy JWW/NWG/js Attachment cc:
J. P. O'Reilly, Region II
}
, i PEOPLE.. 5CHVING PEDPLE
-