ML20107M560

From kanterella
Jump to navigation Jump to search
Application for Amend to Licenses NPF-11 & NPF-18,changing Tech Specs to Conform to 10CFR50.73 Requirements & Deleting Channel Check Requirements from Certain Instruments.Fee Paid
ML20107M560
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/21/1985
From: John Marshall
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20107M570 List:
References
9785N, NUDOCS 8503010343
Download: ML20107M560 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

~

Commonwealth Edison

  • One First National Plaza, Chicago, Ilknois Address Reply to: Post Office Box 767 Chicago, Illinois 60690
February 21, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

LaSalle County Station Units 1 and 2 Proposed Amendments to Technical Specification for Facility Operating License NPF-ll and NPF-18 concerning Reporting Requirements and Channel Check Requirements NRC-Docket Nos. 50-373 and 50-374 References (a): 10 CFR Part 50, Section 50.73.

(b): Generic Letter 83-43.

(c): Section 6.6.8 of Technical Specifications.

(d): J. G. Marshall letter to H. R. Denton dated January 8, 1985.

(e): NPF-ll License Condition 2.C.(ll).

(f): NPF-18 License Condition 2.C.(5). .

Dear Mr. Denton:

Pursuant to 10 CFR 50.59, Commonwealth Edison proposes to amend Appendix A, Technical Specification, to Facility Operating Licenses NPF-ll and NPF-18. These amendment changes are being submitted for your staff's review and approval.

The proposed changes cover two general areas. Technical Specification reporting requirements are revised to conform to 10 I CFR 50.73 requirements. These changes are contained in Attachment C and are requested to become effective upon approval. Attachment F contains requested changes which delete channel check requirements from certain instruments. These changes are necessitated by the upcoming replacement of instrumentation which has local readout capability with blind instrumentation which complys with the require-ments of 10 CFR 50.49. If approved, these changes should become effective November 30, 1985. Reference (d) contains additional information on this topic.

. 9{'ef e503010343 e50221 PDR ADOCK 05000373 Q(

D %D p PDR Sqf l

)

...r

.o; e

'H. R. Denton February 21, 1985 t.

l Both the proposed changes have received On-site and Off-site L review-and approval. .We have reviewed these changes and find.that no

significant hazards considerations exist. Our review is documented Lin:-Attachments D and G, respectively. Commonwealth Edison is notifying the State of Illinois of our-request for these amendments

.by transmitting a copy of this letter and its attachments to the designated State Of ficial.

In.accordance with 10 CFR 170, a' fee remittance of $150.00 is enclosed.

Please direct any questions you may have concerning this matter'to this office.

Three (3) signed originals and thirty-seven (37) copies of this transmittal and its attachments are provided for your use.

Very truly yours,

. h 33. W J. G. Marshall Nuclear Licensing Administrator 1m cc: Region'III Inspector - LSCS A. Bournia~ 'NRR G. Wright - Ill

~

Attachments (A): Changed Page Listing l(B&E): Background and Discussion (C&F): Techncial. Specification Changes to NPF-ll and NPF (D&G):: .. Evaluation of'Significant Hazards Consideration SUBSCRIBED /AND SWORN'to

~before me th'is c2/46 day of M/4.uattk , 1985

~

Mb Obv Notary Pub;1c 9785N

-_____- -__