ML20107M516

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Info Re Archaeological & Historical Resources Along Vogtle - Thalmann Transmission Line right- of-way,per 840803 Commitment
ML20107M516
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/07/1984
From: Foster D
GEORGIA POWER CO.
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML19269A779 List:
References
GN-440, NUDOCS 8411140176
Download: ML20107M516 (2)


Text

.

ds Georgia Power Company

,~&

' Route 2 Box 299A -

^ U!

/

~ Waynesocro. Georgia 30830

- Telephone 404 55L9961, Ett 3360 404 724 8114. Ext. 3360 g,,,

Georgia Power Vice President and Project Generat Manager the soumem ektoc systern

_ Vogtle Project November 7, 1984 Director of Nuclear Reactor Regulation Attention: Ms. Elinor G. Adensam, Chief Licensing Branch #4-File: X7T02.6 Division.of Licensing Log: GN-440 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 INFORMATION CONCERNING ARCHAEOLOGICAL AND HISTORICAL RESOURCES EXEMPT FROM PUBLIC DISCLOSURE

Dear Mr. Denton:

By g letter of August 3,1984 (File X7T02.6, Log: GN-400), Georgia Power Company provided consultants reports and Cultural Resource Management Plans (CRM) delineating historical and archaeological properties along certain transmission line rights-of-way associated with the Vogtle project. As notea in that letter, additional reports and CRM plans were being developed and would be submitted as they became available.

Attached are the Consultant's report and submi.ttal letter to the Georgia State Historic Preservation Officer for the Vogtle to Thalmann transmission line.

This information is being provided with the understanding that it will not be subject to public disclosure. Withholding this information from public disclosure-is necessary to protect these resources and insure their preservation. The basis for witholding from public disclosure were stated in g letter of August 3,1984..

Additional reports and CRM plans are being developed for submittal to the i=

State Historic Preservation Officer for the transmission lines associated with the Vogtle Electric Generating Plant. Such reports will be submitted to you under the same conditions noted herein as they become available.

If you have any questions concerning the enclosed information please contact us.

Yours very

uly,

/.$

GQ: 4M n Ok D. O. Foster MM ej

$51&

) p)eh MM 8411140176 841'07

(

1 PDR ADOCK 05000424 A

PDR

=

b.

Director of Nuclear Reactor Regulation November 7,1984

- Page 2 DOF/WLB/sro

' Attachments cc:

M. A. Miller

. R. A. Thomas J. A. Bailey L.-T. Gucwa G. F. Trowbridge, Esquire G. Bockhold, Jr.

J. E. Joiner L. Fowler C. A. Stangler i

e

,..,e y

w- - -,

e---~, - - - +.