ML20107M497
ML20107M497 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 02/21/1985 |
From: | Duck J MARSH & MCLENNAN, INC. |
To: | Saltzman J NRC OFFICE OF STATE PROGRAMS (OSP) |
References | |
NUDOCS 8503010306 | |
Download: ML20107M497 (3) | |
Similar Documents at Browns Ferry | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18039A9021999-10-15015 October 1999
[Table view]Forwards LER 99-010-00 Re Occurrence of Plant Reactor Scram Due to Main Turbine Trip Which Resulted in Main Steam Moisture Separator.All Plant Safety Systems Operated as Designed in Response to Event ML20217E0711999-10-14014 October 1999 Grants Approval for Util to Submit Original,One Signed Paper Copy & Six CD-ROM Copies of Updates to FSAR as Listed,Per 10CFR50.4(c),in Response to ML18039A8961999-10-14014 October 1999 Forwards LER 99-009-00,re Manual Reactor Scram on Unit 2 from 54% Power,Iaw 10CFR50.73(a)(2)(iv).All Plant Safety Sys Operated as Designed in Response to Event ML20217D3261999-10-0808 October 1999 Responds to Re Event Concerning Spent Fuel Pool Water Temperature Being Undetected for Approx Two Days at Browns Ferry Unit 3 ML20217F7751999-10-0808 October 1999 Confirms 991006 Telcon Between T Abney of Licensee Staff & a Belisle of NRC Re Meeting to Be Conducted on 991109 in Atlanta,Ga to Discuss Various Maintenance Issues ML18039A8931999-10-0808 October 1999 Forwards LER 99-008-00,concerning HPCI Sys Being Declared Inoperable,Iaw 10CFR50.73(a)(2)(v).There Are No Commitments Contained in Ltr ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR ML20212M1481999-09-28028 September 1999 Refers to Management Meeting Conducted on 990927 at Region II for Presentation of Recent Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML20212D3651999-09-20020 September 1999 Forwards SE Accepting Licensee 990430 Proposed Rev to Plant, Unit 3 Matl Surveillance Program ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util 981023 Ltr.Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20211G6491999-08-26026 August 1999 Confirms Telcon with T Abney on 990824 Re Mgt Meeting Which Has Been re-scheduled from 990830-0927.Purpose of Meeting to Discuss BFN Status & Performance ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML20210Q4421999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit Ltr with List of Individuals to Take exam,30 Days Before Exam Date ML20210N1051999-08-0202 August 1999 Forwards SE Accepting Licensee 990326 Request for Relief from ASME B&PV Code,Section XI Requirements.Request for Relief 3-ISI-7,pertains to Second 10-year Interval ISI for Plant,Unit 3 ML20210G8991999-07-28028 July 1999 Discusses 990726 Open Mgt Meeting for Discussion on Plant Engineering Status & Performance.List of Attendees & Presentation Handout Encl ML18039A8181999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20210G8051999-07-22022 July 1999 Discusses DOL Case DC Smith Vs TVA Investigation.Oi Concluded That There Was Not Sufficient Evidence Developed During Investigation to Substantiate Discrimination.Nrc Providing Results of OI Investigation to Parties ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 ML20209J0251999-07-16016 July 1999 Forwards SE Which Constitutes Staff Review & Approval of TVA Ampacity Derating Test & Analyses for Thermo-Lag Fire Barrier Configurations as Required in App K of Draft Temporary Instruction, Fpfi, ML20210B2671999-07-14014 July 1999 Confirms 990702 Telcon Between T Abney of Licensee Staff & Author Re Mgt Meeting Scheduled for 990830 at Licensee Request in Atlanta,Ga to Discuss Browns Ferry Nuclear Plant Status & Performance ML20209E3421999-07-0707 July 1999 Confirms Arrangements Made During 990628 Telephone Conversation to Hold Meeting on 990726 in Atlanta,Ga to Discuss Plant Engineering Status & Performance ML20209E5511999-07-0707 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes TACs MA1180,MA1181 & MA1179 ML20196J3531999-06-30030 June 1999 Responds to Re Boeing Rocket Booster Mfg Facility Being Constructed in Decatur,Al.Nrc Has No Unique Emergency Planning Concerns Re Proximity of Boeing Facility to BFN ML20196G9111999-06-28028 June 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits ML18039A8081999-06-28028 June 1999 Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF ML18039A8111999-06-25025 June 1999 Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 ML20196F8741999-06-23023 June 1999 Forwards Safety Evaluation Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20196F8131999-06-22022 June 1999 Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld ML18039A8051999-06-22022 June 1999 Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept ML18039A8031999-06-18018 June 1999 Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days ML18039A7931999-06-0101 June 1999 Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage ML20195D3321999-06-0101 June 1999 Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 ML18039A7911999-05-24024 May 1999 Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training ML18039A7891999-05-24024 May 1999 Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 ML20195B9361999-05-24024 May 1999 Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License ML20206U6551999-05-14014 May 1999 Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 ML20206Q8421999-05-10010 May 1999 Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) ML18039A7771999-05-0606 May 1999 Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments ML20206G6611999-05-0404 May 1999 Forwards SE Accepting GL 88-20,submitted by TVA Re multi-unit Probabilistic Risk Assessement (Mupra) for Plant, Units 1,2 & 3 ML18039A7741999-04-30030 April 1999 Forwards Proposed Rev to BFN Unit 3 RPV Matl Surveillance Program,For NRC Approval ML20206H5901999-04-30030 April 1999 Forwards Notification of Revs to BFN Unit 2 Emergency Response Data Sys Data Point Library.Revs Were Implemented on 990413 DD-99-06, Informs That Time Provided by NRC within Which Commission May Act to Review Director'S Decision (DD-99-06) Has Expired.Decision Became Final Agency Action on 990423.With Certificate of Svc.Served on 9904281999-04-28028 April 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Director'S Decision (DD-99-06) Has Expired.Decision Became Final Agency Action on 990423.With Certificate of Svc.Served on 990428 ML18039A7681999-04-27027 April 1999 Requests Relief from Specified Inservice Insp Requirements in Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a(a)(3)(i).Relief Requests 2-ISI-8 & 3-ISI-8,encl for NRC Review & Approval ML18039A7591999-04-27027 April 1999 Forwards Annual Radiological Environ Operating Rept Browns Ferry Nuclear Plant 1998. Rept Includes Results of Land Use Censuses,Summarized & Tabulated Results of Radiological Environ Samples in Format of Reg Guide 4.8 & NUREG-1302 ML18039A7651999-04-27027 April 1999 Forwards Rev 0 to TVA-COLR-BF2C11, Browns Ferry Nuclear Plant Unit 2,Cycle 11 Colr. ML18039A7541999-04-23023 April 1999 Requests Approval of Bfnp Unit 3 Risk-Informed ISI (RI-ISI) Program,Per 10CFR50.55(a)(3)(i) & GL 88-01.Encl RI-ISI Program Is Alternative to Current ASME Section XI ISI Requirments for Code Class 1,2 & 3 Piping 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML18039A9021999-10-15015 October 1999
[Table view]Forwards LER 99-010-00 Re Occurrence of Plant Reactor Scram Due to Main Turbine Trip Which Resulted in Main Steam Moisture Separator.All Plant Safety Systems Operated as Designed in Response to Event ML18039A8961999-10-14014 October 1999 Forwards LER 99-009-00,re Manual Reactor Scram on Unit 2 from 54% Power,Iaw 10CFR50.73(a)(2)(iv).All Plant Safety Sys Operated as Designed in Response to Event ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. ML18039A8931999-10-0808 October 1999 Forwards LER 99-008-00,concerning HPCI Sys Being Declared Inoperable,Iaw 10CFR50.73(a)(2)(v).There Are No Commitments Contained in Ltr ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util 981023 Ltr.Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML18039A8181999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 ML18039A8081999-06-28028 June 1999 Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF ML18039A8111999-06-25025 June 1999 Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 ML20196F8131999-06-22022 June 1999 Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld ML18039A8051999-06-22022 June 1999 Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept ML18039A8031999-06-18018 June 1999 Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days ML18039A7931999-06-0101 June 1999 Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage ML20195D3321999-06-0101 June 1999 Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 ML20195B9361999-05-24024 May 1999 Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License ML18039A7911999-05-24024 May 1999 Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training ML18039A7891999-05-24024 May 1999 Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 ML20206U6551999-05-14014 May 1999 Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 ML20206Q8421999-05-10010 May 1999 Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) ML18039A7771999-05-0606 May 1999 Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments ML20206H5901999-04-30030 April 1999 Forwards Notification of Revs to BFN Unit 2 Emergency Response Data Sys Data Point Library.Revs Were Implemented on 990413 ML18039A7741999-04-30030 April 1999 Forwards Proposed Rev to BFN Unit 3 RPV Matl Surveillance Program,For NRC Approval ML18039A7681999-04-27027 April 1999 Requests Relief from Specified Inservice Insp Requirements in Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a(a)(3)(i).Relief Requests 2-ISI-8 & 3-ISI-8,encl for NRC Review & Approval ML18039A7591999-04-27027 April 1999 Forwards Annual Radiological Environ Operating Rept Browns Ferry Nuclear Plant 1998. Rept Includes Results of Land Use Censuses,Summarized & Tabulated Results of Radiological Environ Samples in Format of Reg Guide 4.8 & NUREG-1302 ML18039A7651999-04-27027 April 1999 Forwards Rev 0 to TVA-COLR-BF2C11, Browns Ferry Nuclear Plant Unit 2,Cycle 11 Colr. ML20206C8591999-04-23023 April 1999 Informs That Util Has Determined,Dr Bateman No Longer Needs to Maintain His License,Effective 990331,per Requirement of 10CFR55.55(a) ML18039A7541999-04-23023 April 1999 Requests Approval of Bfnp Unit 3 Risk-Informed ISI (RI-ISI) Program,Per 10CFR50.55(a)(3)(i) & GL 88-01.Encl RI-ISI Program Is Alternative to Current ASME Section XI ISI Requirments for Code Class 1,2 & 3 Piping ML18039A7581999-04-23023 April 1999 Responds to Item 4 of 981117 RAI Re TS Change Request 376 Re Extended EDG Allowed Outage Time,In Manner Consistent with Rgs 1.174 & 1.177 ML20206C1241999-04-21021 April 1999 Forwards Annual Occupational Radiation Exposure Rept for 1998, IAW TS Section 5.6.1.Rept Reflects Radiation Exposure Data as Tracked by Electronic Dosimeters on Radiation Work Permits ML20205T0971999-04-15015 April 1999 Submits Change in Medical Status for DM Olive in Accordance with 10CFR55.25,effective 990315.Encl Medical Info & Certification of Medical Exam,Considered by Util to Be of Personal Nature & to Be Withheld,Per 10CFR2.790(a)(6) ML18039A7441999-04-0707 April 1999 Forwards LER 99-001-00,providing Details Re Inoperability of Two Trains of Standby Gas Treatment Due to Breaker Trip on One Train in Conjunction with Planned Maint Activities on Other.Ltr Contains No New Commitments ML18039A7431999-03-30030 March 1999 Responds to NRC 990112 RAI Re BFN Program,Per GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs. ML18039A7421999-03-30030 March 1999 Provides Results of Analysis of Design Basis Loca,As Required by License Condition Re Plants Power Uprate Operating License Amends 254 & 214 ML18039A7411999-03-30030 March 1999 Provides Partial Response to NRC 981117 RAI Re TS Change Request 376,proposing to Extend Current 7 Day AOT for EDG to 14 Days ML18039A7371999-03-26026 March 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME Boiler & Pressure Vessel Code,1989 Edition.Encl Contains Request for Relief 3-ISI-7,for NRC Review & Approval ML18039A7331999-03-26026 March 1999 Forwards Rev 4 to TVA-COLR-BF2C10, Bnfp,Unit 2,Cycle 10 COLR, IAW Requirements of TS 5.6.5.d.COLR Was Revised to Extend Max Allowable Nodal Exposure for GE GE7B Fuel Bundles ML18039A7291999-03-22022 March 1999 Forwards Revised Epips,Including Index,Rev 26A to EPIP-1, Emergency Classification Procedure & Rev 26A to EPIP-5, General Emergency. Rev 26A Includes All Changes Made in Rev 26 as Well as Identified Errors ML20204G8471999-03-19019 March 1999 Reports Change in Medical Status for Ma Morrow,In Accordance with 10CFR55.25.Encl Medical Info & Certification of Medical Exam,Considered by Util to Be of Personal Nature & to Be Withheld from Pdr,Per 10CFR2.790(a)(6).Without Encl ML20207M0611999-03-11011 March 1999 Forwards Goals & Objectives for May 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3,radiological Emergency Plan Exercise.Plant Exercise Is Currently Scheduled for Wk of 990524 ML18039A6971999-02-22022 February 1999 Forwards Typed TS Pages,Reflecting NRC Approved TS Change 354 Requiring Oscillation PRM to Be Integrated Into Approved Power uprate,24-month Operating Cycle & Single Recirculation Loop Operation ML18039A6961999-02-19019 February 1999 Provides Util Response to GL 95-07 Re RCIC Sys Injection Valves (2/3-FCV-71-39) for BFN Units 2 & 3.Previous Responses,Dtd 951215,1016 & 960730,0315 & 0213,supplemented ML18039A6911999-02-19019 February 1999 Forwards Rev 3 to Unit 2 Cycle 10 & Rev 1 to Unit 3 Cycle 9, Colr.Colrs for Each Unit Were Revised to Include OLs Consistent with Single Recirculation Loop Operation ML20203B6031999-02-0404 February 1999 Requests Temporary Partial Exemption from Requirements of 10CFR50.65,maint Rule for Unit 1.Util Requesting Exemption to Resolve Issue Initially Raised in NRC Insp Repts 50-259/97-04,50-260/97-04 & 50-296/97-04,dtd 970521 ML18039A6741999-01-21021 January 1999 Responds to NRC 981209 Ltr Re Violations Noted in Insp Repts 50-259/98-07,50-260/98-07 & 50-296/98-07,respectively. Corrective Actions:Will Revise Procedure NEPD-8 Re Vendor Nonconformance Documentation Submission to TVA ML20199F6951999-01-0808 January 1999 Submits Request for Relief from ASME Section XI Inservice Testing Valve Program to Extend Interval Between Disassembly of Check Valve,Within Group of Four Similar Check Valves for EECW Dgs,From 18 to 24 Months 1999-09-09 Category:LEGAL/LAW FIRM TO NRC MONTHYEARML20245C9081989-04-11011 April 1989
[Table view]Forwards Endorsements 63 & 64 to Maelu Policy MF-102, Endorsements 71 & 72 to Nelia Policy NF-247.Endorsements 106 & 107 to Nelia Policy NF-198,Endorsement 11 to Nelia Certificates N-38,N-39 & N-40 & Endorsement 10 to MF-75 ML20235K9091989-01-31031 January 1989 Forwards Endorsement 89 to Maelu Policy MF-66 & Endorsement 103 to Nelia Policy NF-198 ML20206F2581988-11-0101 November 1988 Forwards Endorsements 102,67,43,33 to Nelia Policies NF-198, NF-247,NF-256 & NF-258,respectively,Endorsements 88,59 to Maelu Policies MF-66 & MF-102,respectively & Endorsements 9 to Nelia Certificates N-38,N-38,N-40,respectively ML20150E3561988-07-0505 July 1988 Forwards Endorsements 101,87,66,58 & 42 to Nelia Policies NF-198,MF-66,NF-247,MF-102 & NF-256,respectively ML20154P0371988-05-26026 May 1988 Forwards Policy Endorsments,Including Endorsments 51,36,91 & 77 to Nelia Policies NF-252,NF-281,NF-182 & NF-238, Respectively & Endorsements 32,28,72 & 65 to Maelu Policies MF-108,MF-112,MF-61 & MF-93,respectively ML20236F7221987-10-0202 October 1987 Forwards,On Behalf of Util,Request for Exemption Per 10CFR50.12(a)(2)(v).Fee Paid ML17347A4841987-05-0707 May 1987 Forwards Endorsements 72,104,46,67,83,96 & 59 to Nelia Policies NF-238,NF-215,NF-252,NF-227,NF-185,NF-198 & NF-247 & Endorsements 60,86,27,54,70,82 & 51 to Maelu Policies MF-93,MF-78,MF-108,MF-88,MF-55,MF-66 & MF-102,respectively ML20214M8271986-07-30030 July 1986 Forwards Endorsements 1,34,54 & 91 to Nelia Policies N-104, NF-256,NF-247 & NF-198 & Endorsements 1,47 & 78 to Maelu Policies M-104,MF-102 & MF-66 Respectively ML20211C2281986-05-21021 May 1986 Forwards Endorsements 74,46,45,76,77 & 83 to Maelu Policies MF-66,MF-102,MF-102,MF-66,MF-66 & MF-78,respectively & Endorsements 87,53,52,89,90,33 & 100 to Nelia Policies NF-198,247,247,198,198,256 & 215,respectively ML20211C7541986-05-12012 May 1986 Forwards Endorsements,Including Endorsement 75 to Maelu Policy MF-66,Endorsement 88 to Nelia Policy NF-198, Endorsement 44 to Maelu Policy MF-102,Endorsement 51 to Nelia Policy NF-247 & Endorsement 70 to Maelu Policy MF-90 ML20205J2441986-01-16016 January 1986 Forwards Endorsement 31 to Nelia Policy NF-256 ML17346B1681986-01-0606 January 1986 Forwards Endorsements to Nelia & Maelu Policies,Including Endorsement 22 to Nelia Policy NF-281,Endorsement 15 to Maelu Policy MF-112 & Endorsements 6 to Nelia & Maelu Certificates N-97 & M-97 ML20154B8781985-11-25025 November 1985 FOIA Request for Seven Categories of Documents Re Hydrodynamic Loads in BWR Pressure Suppression Containments ML20125C4351985-06-0707 June 1985 Forwards Endorsement 84 to Nelia Policy NF-198 & Endorsement 71 to Maelu Policy MF-66 ML20117A7061985-05-0101 May 1985 Forwards Endorsements 83 & 70 to Nelia Policy NF-198 & Maelu Policy MF-66,respectively ML20100F3881985-03-27027 March 1985 Forwards Endorsement 82 to Nelia Policy NF-198 ML20107M4971985-02-21021 February 1985 Forwards Endorsement 69 to Maelu Policy MF-66 & Endorsement 81 to Nelia Policy NF-198 ML20101T7551985-02-0101 February 1985 Forwards Endorsements 78 & 80 to Nelia Policy NF-198 & Endorsements 66 & 68 to Maelu Policy MF-66 ML20112G0831985-01-11011 January 1985 Forwards Endorsement 79 to Nelia Policy NF-198 & Endorsement 67 to Maelu Policy MF-66 ML20101H0151984-12-20020 December 1984 Forwards Endorsement 5 to Nelia Certificates N-38,N-39 & N-40 & Maelu Certificates M-38,M-39 & M-40 ML20101F8011984-12-18018 December 1984 Forwards Endorsements 76 & 77 to Nelia Policy NF-198 & Endorsements 64 & 65 to Maelu Policy MF-66 ML20092M5881984-06-25025 June 1984 Forwards Endorsements 75 & 63 to Nelia Policy NF-198 & Maelu Policy MF-66,respectively ML20084J1911984-05-0202 May 1984 Forwards Endorsements 74 & 62 to Nelia Policy NF-198 & Maelu Policy MF-66,respectively ML20086T4341984-02-28028 February 1984 Forwards Endorsement 73 to Nelia Policy NF-198 ML20080M6741984-02-13013 February 1984 Forwards Endorsements 71 & 72 to Nelia Policy NF-198 & Endorsements 60 & 61 to Maelu Policy MF-66.Amended Site Description Also Encl ML20083F1341983-12-23023 December 1983 Forwards Endorsements 4 to Maelu Certificates M-40,M-39 & M-38,Endorsements 4 to Nelia Certificates N-40,N-39 & N-38, Endorsements 59 & 58 to Maelu Policy MF-66 & Endorsements 70 & 69 to Nelia Policy NF-198 ML20076M0941983-07-15015 July 1983 Forwards Endorsement 68 to Nelia Policy NF-198 & Endorsement 57 to Maelu Policy MF-66 ML20024C7671983-07-0505 July 1983 Forwards Endorsements 66 & 67 to Nelia Policy NF-198 & Endorsements 55 & 56 to Maelu Policy MF-66 ML20074A7211983-05-0303 May 1983 Forwards Endorsements 65 & 54 to Nelia Policy NF-198 & Maelu Policy MF-66,respectively ML20072H2271983-03-15015 March 1983 Forwards Endorsement 64 to Nelia Policy NF-198 ML20071Q1931982-12-23023 December 1982 Forwards Certificates of Insurance N-38,N-39 & N-40 for Endorsements 1,2 & 3 to Nelia Policy NF-198 & Certificates of Insurance M-38,M-39 & M-40 for Endorsements 1,2 & 3 to Maelu Policy MF-66 ML20079J5601982-12-22022 December 1982 Forwards Endorsement 63 to Nelia Policy NF-198 & Endorsement 53 to Maelu Policy MF-66 ML20071M6751982-09-17017 September 1982 Forwards Endorsement 52 to Maelu Policy MF-66 & Endorsement 66 to Nelia Policy NF-198 ML20069C9201982-07-0606 July 1982 Forwards Endorsement 61 to ANI Policy NF-198 & Endorsement 51 to Maelu Policy MF-66 ML20052B5331982-04-26026 April 1982 Forwards Endorsement 60 to ANI Policy NF-198 ML20042B2941982-03-17017 March 1982 Forwards Endorsement 59 to ANI Policy NF-198 ML20042B7781982-03-16016 March 1982 Forwards Endorsement 6 to ANI Binder EB-66 & Endorsement 3 to SFP Binder EB-75 ML18025B7461982-03-16016 March 1982 Forwards Endorsement 8 to ANI Binders EB-38,39 & 40 ML20041A1171982-02-16016 February 1982 Forwards Endorsement 49 to Maelu Policy MF-66 ML20040B5091982-01-18018 January 1982 Forwards Endorsement 48 to Maelu Policy MF-66 ML20039C3971981-12-22022 December 1981 Forwards Endoresements 57 & 58 to Nelia Policy NF-198 ML20039C1391981-12-22022 December 1981 Forwards Endorsement 7 to ANI Binders EB-38,39 & 40 ML20040C2781981-10-0808 October 1981 Forwards Revised Site Descriptions for Nelia Policy NF-198 & Maelu Policy MF-66,per Feb 1981 Request.Approval Requested for 811007 Implementation ML20009D3041981-05-20020 May 1981 FOIA Request for Documents Re Replication Testing by Underwriters Labs for Facilities ML18094A0691981-05-11011 May 1981 Forwards Endorsements 46 & 47 to Maelu Policy MF-66 ML20004B1491981-04-29029 April 1981 Forwards Endorsement 56 to Nelia Policy NF-198 ML18025B5201981-04-29029 April 1981 Forwards Endorsement 55 to Nelia Policy NF-198 ML20004B0941981-04-29029 April 1981 Forwards Endorsement 54 to Nelia Policy NF-198 ML18025B4371981-04-0707 April 1981 Forwards Endorsements 18 & 45 to Maelu Policies MF-102 & MF-66 ML18025B4361981-04-0707 April 1981 Forwards Endorsements 6 to ANI Binders EB-38,39 & 40 & Endorsement 4 to ANI Binder EB-66 1989-04-11 |
Text
~ .,
Marsh &
Mgennan a
Marsh & McLennan, incorporated 2121 San Jacinto Street 1300 San Jacinto Tower Dallas, Texas 75201 Telephone 214-979-9900 February 21, 1985 Mr. Jerome Saltzman Assistant Director State & Licensee Relations Office of State Programs U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Tennessee Valley Authority Browns Ferry Nuclear Plant Nuclear Liability insurance ANI/MAELU Policies NF-198/MF-66 Endorsements No. 81/6 9
Dear Jerry:
Enclosed for your records are two certified copies each of Endorsement No. 81 to ANI Policy NF-198 and Endorsement No. 69 to MAELU Policy MF-66 to the Tennessee Valley Authority Browns Ferry Nuclear Plant. These revise the 1985 premiums.
Very truly yours, Y .
John R. Duck, Jr.
Assistant Vice President M&M Nuclear Consultants cc: C. R. Dodson H. E. Higgins, Jr.
J. L. Collins jf/onclosure I
4
[
l '\
8503010306 850221 PDR ADOCK0500g9
y _
5l NUCLEAR ENERGY LIABILITY INSURANCE MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS
- 1. MDEDir CF AD/ANCE PRD1IID1 DIDORSD1DE
- 2. STANDARD PRD11LM AND RESERIC PRD110M D;DORSDSTP
- 3. REIURN PRDiItf4 EUE
- 1. ' Advance Praniun It is agreed that the IVnended Advanca Frenium due the cx2rpanies for the calendar year 1985 is $186,812.91 .
- 2. Standard Prenian and Peserve Preniun Subject to the provisions of the Industrf Credit Rating Plan, it
.is agreed that the Standard Prenian and Reserve Preniun for the calendar year designated above are:
Standard Pranium $l86,812.91 Reserve Praniun $141,302.81
- 3. Return Pruniun $112.50 .
Effective Date of Tb fonn a part this Endorsenent January 1, 1985 of Policy No. MF-66 Issued to Tennessee Valley Authority Date cf Irsua February 4, 1985
, For the Subscribing Capanies MJIL V, ICU4IC DIEPGY LIABILITY UNDER S-By -[. s x
' ~-
i Endorsurent No. 69 Countersigned by Authorized PcpresentativE This is to certify that this in a true copy of the original Endorsement having the endor'30'aent number and being mado part
'ME-35 of the Nuclear Energy Liability Iolicy (Facility Form) as des-Ignated hereon. No Insurancs is arrorded to eundor, l
-d N#3' John L. 022:
.T.ht chi
[
x #
4; a >
~~~, vice Premdent Liabinty ur.r .aLqr
- 5 t 'o " O C /
h' W s
Nuclear Energy Liability insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION 1
ADVANCE PREMUM AND STANDARD PREMIUM ENDORSEMENT CALENDAR YEAR 1985 It is agreed that Items la. and Ib. of Endorsement No. 79 are amended to read:
la. ADVANCE PREMIUM: It is agreed that the Advance Premium due the companies for the period designated above is: $ 643,466.68 ,
Ib. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Standard Premium is said Advance
~
Premium and the Reserve Premium is: $ 486,709.67 .
Return Premium: $387.50 .
This is to certify that this is a true copy of the original Endorsement having the endorsonent number and being m:ade part of the Nuclear Energy Liability Policy (Facili der. y Form) as deo-idnated hereon. No Insurance is afforded here
$. M John L5ttrocchi,Vice President Dabsty U Amerienn Nudear hrers Ellective Date of this Endorsement January 1, 1985 s "#"'
issued to Tennessee YaMe^i"Aut'N'YEy"**
Date of issue February 4, 1985 For the su scribing co panies Endorsement No NE-36 8l countersigned by--
)W General Manager
,