Advises That Commitments in to Perform Specific Actions Re Seismic Qualification of Equipment Prior to Exceeding 5% Rated Full Power Met.Field Change Notice FCN-SAPM-10627 Completed
ML20107K924
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/22/1985
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
SLNRC-85-9, NUDOCS 8502280445
Download: ML20107K924 (1)


Text

's SNUPPS Standardised Nueleer Unit Poseer Plant System 5 choke cherry need Nicholas A. Petrick v

20050 Executive Director February 22/1985 SLNRC 85-9 MFILE:3E0278h SUBJ:

Justifications for Interim Operation - Seismic Qualification Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Docket No: STN 50-482

Reference:

SLNRC 84-0102, dated 7/16/84:

Same Subject

Dear Mr. Denton:

The reference letter provided commitments to perform specific actions related to seismic qualification of equipment prior to exceeding 5% of rated full power at Wolf Creek Generating Station, Unit No.1.

These actions have been completed.

Specifically, Field Change Notice FCN-SAPM-10627, related to the Justification for Interim Operation (JIO) for the Thermocouple / Core Cooling Monitor System has been completed.

Also, the revised setpoints required for qualification of flow switches per JIO ESE-40A have been implemented at Wolf Creek.

(Note that the NSSS qualification program designation - for these flow switches has been changed from ESE-40 to ESE-40A).

Very truly yours, Nic olas A. Petrick (

MHF/nidllb9 cc:

G. L. Koester KGE J. M. Evans KCPL

.D. F.'Schnell UE' J. Neisler/B. Little USNRC/ CAL H. Bundy USNRC/WC W. L. Forney

'USNRC/RIII 80(s D.' R. Hunter-USNRC/RIV I

Ip l

i.

l 8502280445 850222 i

PDR ADOCK 05000482 A

PDR

.-