Text
's SNUPPS Standardised Nueleer Unit Poseer Plant System 5 choke cherry need Nicholas A. Petrick v
20050 Executive Director February 22/1985 SLNRC 85-9 MFILE:3E0278h SUBJ:
Justifications for Interim Operation - Seismic Qualification Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Docket No: STN 50-482
Reference:
SLNRC 84-0102, dated 7/16/84:
Same Subject
Dear Mr. Denton:
The reference letter provided commitments to perform specific actions related to seismic qualification of equipment prior to exceeding 5% of rated full power at Wolf Creek Generating Station, Unit No.1.
These actions have been completed.
Specifically, Field Change Notice FCN-SAPM-10627, related to the Justification for Interim Operation (JIO) for the Thermocouple / Core Cooling Monitor System has been completed.
- Also, the revised setpoints required for qualification of flow switches per JIO ESE-40A have been implemented at Wolf Creek.
(Note that the NSSS qualification program designation - for these flow switches has been changed from ESE-40 to ESE-40A).
Very truly yours, Nic olas A. Petrick (
MHF/nidllb9 cc:
G. L. Koester KGE J. M. Evans KCPL
.D. F.'Schnell UE' J. Neisler/B. Little USNRC/ CAL H. Bundy USNRC/WC W. L. Forney
'USNRC/RIII 80(s D.' R. Hunter-USNRC/RIV I
Ip l
i.
l 8502280445 850222 i
PDR ADOCK 05000482 A
.-