Provides Status of Implementation of Commitments Re GL 93-04, Rod Control Sys Failure & Withdrawal of Rod Cluster Control Assemblies
ML20107K857
Person / Time
Site: Prairie Island  
Issue date: 04/22/1996
From: Wadley M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-93-04, GL-93-4, TAC-M86860, TAC-M86861, NUDOCS 9604290060
Download: ML20107K857 (2)


Text

  • \\

Northern States Power Company 4

Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 April 22,1996 Generic Letter 93-04 4

U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Implementation of Commitments Related to Generic Letter 93-04,

" Rod Control System Failure and Withdrawal of Rod Cluster l

Control Assemblies"(TAC Nos. M86860 and 86861)

In response to Generic Letter 93-04, " Rod Control System Failure and Withdrawal of Rod Cluster Control Assemblies", we had committed to implement a current order timing modification at the next scheduled refueling outage of each unit following receipt of the official technical bulletin from Westinghouse. The purpose of this letter is to provide you with the status of the commitment.

The Unit 2 modification was complete in June 1995. The Unit 1 modification was completed during the refueling outage that ended in March 1996. We continue to perform current order timing surveillance testing per our commitment.

In this letter we have made no new Nuclear Regulatory Commission commitments.

Please contact Jack Leveille (612-388-1121, Ext. 4662) if you have any questions related to this letter.

/YltE

&/

Michael D Wadley Plant Manager Prairie Island Nuclear Generating Plant c:

(see next page) 060 1

9604290060 960422 I $

PDR ADOCK 05000282 P

PDR I

USNRC*

NORTHERN STATES POWER COMPANY April 22,1996 Page 2 c:

Regional Administrator - Region Ill, NRC Senior Resident inspector, NRC NRR Project Manager, NRC J E Silberg s

I GL9304-3. DOC