V5htMONT YANKEE NUCLEAR POWER CORPORATION Ferry Road, Brattleboro, VT 05301-7002 ENGINEERING OFFICE 580 MAIN STREET BOLTON MA 01740 (508) 779-6711 April 18,1996 BVY 96-52 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington,DC 20555
References:
(a) License No. DPR-28 (Docket No. 50-271)
Subject:
Vermont Yankee implementation of the EPRI Performance Prediction Method The purpose of this letter is to inform the NRC of Vermont Yankee's implementation plans for two issues discussed at the recent motor-operated valve (MOV) program inspection exit meeting related to final closure of our MOV program. The two issues are evaluation of non-dynamically j
tested MOVs and implementation of the Electric Power Research Institute (EPRI) Performance j
Prediction Method (PPM) for evaluating MOVs.
1 Vermont Yankee will complete evaluation of non-dynamically tested MOVs in accordance with attachment 6 of Vermont Yankee's " Engineering Guideline for Evaluation of Motor-Operated Valve Design Basis Capability" by July 1,1996.
Vermont Yankee is currently reviewing the Safety Evaluation Report for the EPRI PPM issued on March 15,1996 for inclusion in our MOV program. This review will be completed within 6 j
months ofissuance of the SER.
Vermont Yankee will evaluate a number of MOVs using the EPRI PPM. In selecting the valves to be evaluated, Vermont Yankee considered valves identified by the Individual Plant Examination (IPE) as having a risk significance of "high" and the valves identified in Generic Letter 89-10, Supplement #3. Of the nineteen applicable IPE valves, fifteen will be dynamically tested by the end of 1996 and therefore need not be evaluated. Of the four remaining valves, two have i
considerable margin on the lowest setting and are therefore inappropriate for either dynamic
' testing or PPM evaluation. Therefore, two IPE valves (V13 21 and V23-21) and the six valves identified in Generic Letter 89-10, Supplement #3 will be evaluated using the PPM.
Vermont Yankee plans to complete the evaluations of these eight MOVs by the end of 1996.
j This time is necessary for Vermont Yankee to complete PPM training and perform the PPM evaluations, while also performi scheduled MOV maintenance and testing activities and 1996 240034 od nr9ea M8aa L
P PDR
.4 United Stat:s Nuclear Regulatory Commission VERMONT YANKEE NUCLEAR POWER CORPORATION Aptil 18,1996 Page 2 of 2 refueling outage work. Vermont Yankee plans to implement the EPRI PPM for the remaining applicable MOVs in 1997.
As the NRC requested at the MOV program inspection exit meeting, we will submit an updated MOV program closure letter on or before May 10,1996.
We trust that the information provided is acceptable; however, should you have any questions, please contact this office.
1 Sincerely,.
VERMONT YANKEE NUCLEAR POWER CORPORATION L
Jay K. Thayer Vice President, Engineering 4
c: USNRC Region I Administrator USNRC Resident Inspector-VYNPS USNRC Project Manager-VYNPS p sat /oj -
l STATE OF VERMONT )
NOTARY i
)ss WINDilAM COUNTY )
4 PUBUG gi Then personally appeared before me, Jay K. Thayer, who, being duly swo state e i. $ ' resident.
Engineering, of Vermont Yankee Nuclear Power Corporation, that he is dul j'
and file the foregoing document in the name and on the behalf of Vermont Yankee Nuclear
..r n, and that the statements therein are true to the best of his knowledge and belief.
M Sally Sand (inim, Notary Public My Commission Expires February 10,1999