ML20107H293
| ML20107H293 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/15/1985 |
| From: | Bailey J GEORGIA POWER CO. |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20107H296 | List:
|
| References | |
| GN-521, NUDOCS 8502270109 | |
| Download: ML20107H293 (2) | |
Text
Georgia Power Company Route 2 x
A Waynesboro, Georgia 30830
- "* $3s!8@
L Vogtle Project February 15, 1985 Director of Nuclear Reactor Regulation File: X7N05.2 Attention: Ms. Elinor G. Adensam, Chief Log:
GN-521 Licensing Branch #4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBER 50-424 CONSTRUCTION PERMIT NUMBER CPPR-108 V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 PRESERVICE INSPECTION (PSI) PROGRAM
Dear Mr. Denton:
As a result of our review of your staff's comments in DSER Sec 5 dated 10/27/84, open items 36 ard 38, we are submitting seven (7) copies of the PSI Program, ISI-P-002, Rev.1 for Unit 1 and three (3) sets of a supplemental drawing package which we feel will facilitate your staff's review of the Unit 1 PSI Program. This drawing package includes Piping Isometric Drawings and Piping Classificatf or. Drawings.
The Piping Classification Drawings were previously included as part of the Program; however, Revision 1 replaced the Classification Drawings with the Line Designation List. The Line Designation List includes lines greater than one-inch diameter and gives Project Class, ISI Class, Material, Operating Pressure and Temperature, the type of examination required for each line, and exemption criteria, if applicable.
e J@
Scope of Work Tables in the Program detail the minimum percentage of
-e c.
examinations which we will accomplish for each Program Item Code and ASME SO Section XI Iten Number.
g[
W j %ed rs
"""% t%./Cd
?
bD **%,
- pj.huuW1254 IIc as>
(Annced)
Director of Nuclear Reactor Regulation Preservice Inspection (PSI) Program February 15, 1985 Page 2 As previously coordinated with your staff, two (2) copies of the PSI Program and one (1) set of drawings are being sent under separate cover to the Vogtle Project Manager, Ms. M. Miller.Also, one (1) copy of the PSI Program and one (1) set of drawings are being sent to your contracted reviewer, Mr. Boyd Brown of EG&G by copy of this letter.
If your staff requires additional information, please contact me.
Sincerely, J. A. Bailey Project Licensing Manager CWD/1d Attachments cc:
D. O. Foster R. A. Thomas G. F. Trowbridge, Esquire J. E. Joiner, Esquire C. A. Stangler L. Fowler M. A. Miller L. T. Gucwa G. Bockhold, Jr.
T. N. Epps 4
0083D 1
1 i