ML20107H133

From kanterella
Jump to navigation Jump to search
Forwards Update 13 to FSAR for TMI-1,reflecting Facility Changes,Procedure Changes & Analyses Through 951013 & Rev 16 to Vol 1 of TMI-1 Fhar, Reflecting Methodology Used at TMI-1 to Meet 10CFR50,App R
ML20107H133
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/15/1996
From: James Knubel
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20107H136 List:
References
6710-96-2108, NUDOCS 9604240038
Download: ML20107H133 (2)


Text

  • "

. t GPU Nuclear Corporation Ngg g , Route 441 South P.O. Box 480 Middletown, Pennsylvania 17057-0480 (717)944-7621 Writer's Direct Dial Nurnber:

(717) 948-8005 April 15, 1996 6710-96-2108 J. S. Nuclear Regulatory Commission

\ttention: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Three Mile Island Nuclear Station Unit 1 (TMI-1) g Operating License No. DPR-50 Docket No. 50-289 Final Safety Analysis Report, Update 13 Fire Hazards Analysis Report, Revision 16 Enclosed are one signed original and ten copies of the Final Safety Analysis Report, Update 13 (UFSAR), for TMI-1, submitted pursuant to 10 CFR 50.71(e).

This UFSAR update package contains changes necessary to reflect facility changes, procedure changes and analyses through October 13, 1995, as required by the rule.

In addition, as part of the annual SAR update process, enclosed herewith is one copy of the changes reflected by Revision 16 to the Fire Hazards Analysis Report (FHAR). The FHAR, Revision 16, reflects the methodology used at TMI-1 to meet 10 CFR 50, Appendix R. Revision of the document reflects changes to plant design, and fire hazards analysis incorporated since Revision 15, through February 1, 1996, as annotated by revision bars on the affected pages. The FHAR, Revision 16, package also contains pages that were only included due to repagination and thus don't include any revision bars.

Sincerely, W

. Knubel Vice President and Director, TMI Enclosures AWM cc: Region I Administrator, w/FSAR

~

TMI-1 Senior Project Manager, wo/ enclosure TMI Senior Resident Inspector, w/FSAR and FHAR 1

240001 3 l 9604240038 960415 POR K

ADOCK 05000209 PDR #f(47 L

l l

J

6710-96-2108 METROPOLITAN EDISON COMPANY JERSEY CENTRAL POWER AND LIGHT COMPANY PENNSYLVANIA ELECTRIC COMPANY GENERAL PUBLIC UTILITIES NUCLEAR CORPORATION Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Final Safety Analysis Report, Update 13 Fire Hazards Analysis Report, Revision 16 This letter is submitted to update the Final Safety Analysis Report, Update 13 and the Fire Hazards Analysis Report, Revision 16. As part of this submittal, replacement pages to the Final Safety Analysis Report and Fire Hazards Analysis Report are enclosed.

i J. ubel ce President and Director, TMI I

Signed and sworn before me this N day of , 1996.

/ / n~<

Notary Publid Notarial Seal Debra S. Klick, Notary Pubhc Londonderry Twp.. Dauphin County My Commission Expims July 4.1998 Momta, Penroytvania A2nrhon of t6t's's 1

i