Discusses Commitments Made During 841016 Telcon Re IE Bulletin 84-03, Refueling Cavity Water Seal, During Current Refueling Outage at Unit 2.One Irradiated Fuel Assembly Will Be Moved at One Time Inside Reactor Cavity
ML20107G821
Person / Time
Site: Sequoyah  
Issue date: 10/17/1984
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-84-03, IEB-84-3, NUDOCS 8411080261
Download: ML20107G821 (2)


Text

_. _

,f ~~....

p

>nQp' y

h i:

LTENNEqjRfpfpfg' pTHORITY

' CHMkPdd8IA.,T$g37401 W'

400 Chestnut Street Tower ~II

~

8400723 ' All : 28 October 17,-1984 a

U.S.~ Nuclear Regulatory Commission Region II s

--Attn: Mr. James P. O'Reilly, Regional Administrator

' ~

101 Marietta Street, NW, Suite 2900-Atlanta, Georgia - : 30323-3 Dea! Mr.-O'Reilly:

e O '

ISEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 - IE BULLETIN NO. 84-03: REFUELING

CAVITY WATER SEAL-
y 10n' August-24,'1984, NRC distributed IE Bulletin 84-03, " Refueling Cavity

. Water Seal" concerning the failure.of a seal at' the Haddam Nuclear Plant.

.L i TVA responded to that Bulletin on October 2,' 1984.. During a series of

~

conference calls between TVA and NRC on October 15 and 16, your staff expressed concern 'over, the seal' at our Cequoyah Nuclear Plant' with regard

'to the current refueling outage on unit 2.

As a result of that concern, on October?16, 1984 in a. telephone conversation with members of your_ staff, P. = R. Wallace, :Sequoyah Plant Manager, committed to the following:

4

1.,0nly_one. irradiated fuel. assembly at a time will be moved inside the reactor cavity. A second irradiated fuel assembly will not be moved

'inside the' reactor cavity until the preceding assembly has been moved

+

ithr'ough the transfer tube-into the Auxiliary Building side of the t

'y transfer canal.'

.T

92. -^ The' pocket sump alarm will be used as a symptom of reactor cavity seal l-failure.. Sequoyah will include this mquirement.in its night 'ceders,

_ and operators will be required to myiew the night orders before beginning their shift.

f L

-3 90nce' each shift:we will record the water level in the reactor cavity.

p Please' note that. these measures will be in effect during refueling operations only until the : issue' of cavity seal adequacy is msolved. At that; time,' we will resume our normal refueling operations.

!)

y,,

s

~

4..

.g s.

ih g

g J

}

n.

8411080261 841017 PDR ADOCK 05000327 i

G PDR

-.s x

s f

$f

)k y I

. m w' g

An Equal' Opportunity Employer

~

b

-O U.S. Nuclear Regulatory Commission October 17, 1984 If you have any' questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY m

D5 % n hL.M. Mills, Manager

/

Nuclear Licensing oc:

Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339

)

l.

.