ML20107G676

From kanterella
Jump to navigation Jump to search
Application to Amend Licenses NPF-4 & NPF-7,changing Tech Specs to Reflect Current Organizations within Nuclear Operations Dept,Qa Dept,Maint & Performance Svcs Dept & Security Dept.Fee Paid
ML20107G676
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 11/02/1984
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20107G678 List:
References
578, NUDOCS 8411080203
Download: ML20107G676 (3)


Text

i VIRGINIA ELECTRIC AND PownH COMPANY RIcnwown,VINOINIA 202G1 6

W.L. STEWART vic p.

..wr November 2, 1984 l

Necr..Am or.Arnowe l

l Mr. Harold.R. Denton, Director.

Serial No. 578 Office of Nuclear Reactor Regulation N0/JHL:acm Attn:

Mr. ' James R. Miller, Chief Docket Nos. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C. 20555 Gentlemen:

1 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGES Pursuant to 10 CFR-50.90, the Virginia Electric and Power Company requests an j

amendment, in the form of changes to the Technical Specifications, to Operating Licenses NPF-4 and NPF-7 for North Anna Unit Nos. I and 2.

The proposed Technical Spec 111 cation changes reflect the current organizations within the Nuclear Operations Department, Quality Assurance Department, Maintenance and Performance Services Department and Security Department.

In addition,' the changes reflect 1) the title change of the Executive Vice i

President -. Power to the Executive Vice President and Chief Operating Officer,

2) the requirement to retain the records for at least five ' years when the Station Emergency Plan and implementirg procedures and the Station Security Plan and implementing procedures are annually audited, and 3) the reference change of the ANSI standard on Facility Staff Qualification and Training.

In order to meet the requirements of ANS 3.1-(12/79 Draf t) we are planning a

" phased" verification of the specific qualification requirements of the standard.

The task analysis required by paragraph 5.3.1 of ANS 3.1-(12/79 Draft) will be performed.

Individual background and experience will be-considered to assure that the intent of the standard is met.

From an organizational point of view, the proposed changes will provide assurance that the plant is operated safely and all issues which have potential for impacting the continued safe operation of the plant will be reviewed by the individuals best qualified to render judgment and advise the Station Manager.

The proposed Technical Specification changes for North Anna Unit No, 1 are provided in Attachment 1.

The proposed Technical Specification changes for North Anna Unit No. 2 are provided in Attachment 2.

A discussion of the proposed Technical Specification changes is provided in Attachment 3.

8411080203 841102 PDR ADOCK 05000338 P

PDR

/)

cgecg g/5 Goo

m. _ -

- vino NtA E1.ECTRIC AND PowEn COMPANY TO Harold R. Denton This request has been reviewed and-approved by the Station Nuclear Safety and

.0perating Committee and the Safety Evaluation and Control staff.

It has been

' determined that-this request does not pose an unreviewed safety question as defined in 10 CFR 50.59 and does not pose a significant hazards consideration as defined in 10 CFR 50.92, i '

We have reviewed this request in accordance with the criteria in 10 CFR 170.12.

'A check in the amount of.$150 is enclosed as an application fee.

-These-proposed Technical Specification changes supercede our previous reorganization Technical Specification changes.

Please cancel our proposed Technical Specification change requests dated June 24, 1982 (Serial No. 264),

July 1, 1983 (Serial No. 264A) and October 13, 1983 (Serial No. 264B).

Vr truly yo ~ts, l

-W W. L. Stewart Attachments 1.. Proposed Technical Specification Changes - Unit 1

,p 2.

Proposed Technical Specification Changes - Unit 2

3.. Discussion of Proposed Technical Specification Changes

-4.-

Voucher Check for $150 4

cc:

Mr. James P. O'Reilly Resional Administrator.

Region II Mr. M. W. Branch NRC Resident Inspector North Anna Power Station

-Mr. Charles Price Department of Health 109 Governor Street Richmond, Virginia 23219 i

k N

CCD000NWEALTH OF VIRGINIA )

)

CITY OF RICHMOND

)

The foregoing document was acknowledged before me, in and for the City and Conssonwealth aforesaid, today by W.

L.

Stewart who is Vice President Nuclear Operations, of the Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this 4 day of Yl m

  1. - ~, 19 9V d

My Commission expires:

A

.1 6 19 W L d. 771 %

Notary Public

+

1 (SEAL) 4 -

s/ col

- -