Forwards Util 960321 Proposed Temporary Change to NPDES Permit PA 0009733,requesting Approval for Temporary Discharge of non-contact CW to Discharge Canal Via Stormwater Drain & State of PA Approval of Proposed Change
ML20107G065
Person / Time
Site: Peach Bottom  
Issue date: 04/15/1996
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9604230092
Download: ML20107G065 (3)


Text

_ _ _.

Sts. tion Support Department A

T. S. Appendix B 1.4.2.2.b 1

PECO NUCLEAR recmov c-ov Nuclear Group Headquarters A UNir or PECO EMRGy 965 Chesterbrook Boulevard Wayne, PA 19087-5691 April 15,1996 l

Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Temporary Change to National Pollutant Discharge Elimination System Permit No. PA 0009733

)

Dear Sir:

This letter is being submitted in accordaice with Technical Specifications (TS) Section 1.4.2.2.b, Appendix B, of the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Facility Operating Licenses. TS Appendix B, Section 1.4.2.2.b stipulates that the NRC shall be provided with a copy of any changes or additions to permits and certificates required by Federal, State, local and regional authorities for the protection of the environment.

Accordingly, attached is a copy of a proposed temporary change to the PBAPS National Pollutant Discharge Elimination System Permit No. PA 0009733. Also attached is the Pennsylvania Department of Environmental Protection's approval of the proposed temporary change.

If you have questions concerning this submittal please contact us.

Sincerely, h.

of,

G.A. Hunger, Jr.,

Director - Licensing Attachments cc:

T. T. Martin, Administrator, USNR'i, Region I W. L Schmidt, Senior Resident ir spector, USNRC, PBAPS l

9604230092 960415 gng4g

[,-

i I

PDR ADOCK 05000277 3

P PDR I

l

4 i

IECO ENERGY

goft
g:,7-P iladelon a PA 19101 0699 215 841 4000 March 21,1996 Mr. Paul Yarnell Department of Environmental Protection One Ararat Boulevard Harrisburg, PA 17110

Dear Mr. Yarnell:

Subject:

Peach Bottom Atomic Power Station NPDES Permit No. PA0009733 As per our telephone conversation on Friday, March 15,1996, this letter is being sent to request approval for a temporary discharge of non-contact cooling water to the discharge canal via a stormwater drain at Peach Bottom Atomic Power Station. The source of the discharge will be a bolt heater that will be used during the performance of turbine maintenance work. Cooling water will be supplied to the heater from the station demineralizer plant. Station demineralized water has the following characteristics; pH in the range of 6 to 8, less than 10 ppb chlorides, and less than 10 ppb silica and sulfates. The flow rate of the discharge will be 22 gallons per minute for a maximum of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.

Based on the high quality of the water that will be used (demineralized water),

there will be no increase in the discharge of pollutants.

In order to support outage schedules, we would appreciate a favorable response by April 30,1996.

If you have any questions or require additionalinformation, please contact me at (215) 841-5177.

Sincerely, MD Robert M. Matty, Jr.

Engineer Environmental Affairs t

. _ ~ -

4

~

Pennsylvania Department of Environmental Protection One Ararat Boulevard, Room 126 Harrisburg, Pennsylvania 17110 l

March 28,1996 Southcentral Regional office (717) 657-4590 Mr. Robert M. Matty, Jr.

PECO Energy Company 2301 Market Street l

P.O. Box 8699 Philadelphia, PA 19101 8699 Re:

Industrial Waste NPDES Permit No. PA0009733 Peach Bottom Township, York County Dear Mr. Matty We have received and hereby approve your March 21,1996 request. This request is for a temporary discharge of non-contact cooling water to the discharge canal via a stotmwater drain at the Peach Bottom Atomic Power Station. The l

discharge is the resv'.t of using a bolt heater during turbine maintenance work. The flow rate will be 22 gallons per

}

minute for a maximum of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> that will occur at the most once per year. The discharge to the canal prior to Outfall 001 and therefore will be negligible based on dilution and frequency. We request that you provide information for this discharge regarding flow, duration, and physical characteristics. This information can be included with the monthly Discharge Monitoring Report requirements.

If there are any questions in this regard please contact me at the above number.

Sincerely Paul L. Yarnell, Jr.

Permit Engineer Water Quality Management Program i