BYRON NUCLEAR POWER STATION UNIT 1 l
MONTHLY PERFORMANCE REPORT COPMONWEALTH EDISON COMPANY NRC DOCKET NO.. 050-454 LICENSE NO. NPF-23 O
b 5
f f
(0625M) i
(
. 9' I.
Monthly Report for Unit One A.
Summary'of Operating Experience for Unit One In this' reporting period, January 1985, Byron Unit 1 continued post core load / precritical startup testing. Unit one entered hot standby, Mode 3.
Preparations for entry into initial criticality, Mode 2 are underway.
(0625M)
___-___________-_--u
__u-_____
__u-___
mi____-__
_-m_...
1 7
t B.
OPERATING DATA REPORT
=
DOCKET NO : 050-454 l
UNIT:
Byron One DATE: 02/14/85
=
COMPLETED BY:
K. Hayes TELEPHONE:
(815)234-5441 j
OPED4 TING STATUS L
1.
Reporting Period: January 1985 Gross Hours in Reporting Period: 744
=
2.
Currently Authorized Power Level (MWt): 170 Max Depend Capacity (No-Net) : 1129 Design Electrical Rating (No-Net): 1175
~
3.
Power Level to Which Restricted (If Any) (No-Net): 58.75 4.
Reasons for Restriction (If Any): Condition of Facility Operating License r
NPF-23 THIS MONTH YR TO DATE CUMULATIVE 5.
Number of Hours Reactor was Critical 0
0 0
{
6.
Reactor Reserve Shutdown Hours 0
0 0
h 7.
Hours Generator on Line 0
0 0
F L
8.
Unit Reserve Shutdown Hours 0
0 0
I 9.
Gross Thermal Energy Generated (NH) 0 0
0 f
- 10. Gross Elec. Energy Generated (NH) 0 0
0
- 11. Net Elec. Energy Generated (NH) 0 0
0 E
- 12. Reactor Service Factor 0
0 0
- 13. Reactor Availability Factor 0
0 0
- 14. Unit Service Factor 0
0 0
- 15. Unit Availability Factor 0
0 0
- 16. Unit Capacity Factor (Using MDC) 0 0
0
?
(
- 17. Unit Capacity Factor (Using Design MWe) 0 0
0 s
{
- 18. Unit Forced Outage Rate 0
0 0
h
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Daration of Each) N/A h
- 20. If Shutdown at End of Report Period, Estimated Date of Startup: N/A i
- 21. Units in Test Status (Prior to Commercial Operation):
k FORECAST FCHIEVED s.
Initial Criticality 1-25-85
_2-2-85 E
Initial Electricity E
Commercial Operation E
g (0625M)
L B
p
^
C.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byron One DATE: 02/14/85 COMPLETED BY:
K. Hayes TELEPHONE:
(815)234-5441 MONTH: January, 1985 1.
O 17.
0 2.
0 18.
0 3.
0 19.
O 4.
0 20.
0 5.
0 21.
0 6.
O 22.
0 7.
0 23.
O 8.
0 24.
0 9.
0 25.
0 10.
0 26.
0 11.
0 27.
0 12.
0 28.
0 13.
0 29.
O 14.
0 30.
0 15.
0 31.
0 16.
O INSTRUCTIONS On this form list the average daily' unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) 'In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
'(0625M)
D.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
050-454 UNIT:
Byron One DATE: 02/14/85 COMPLETED BY:
K. Hayes TELEPHONE:
(815)234-5441 REPORT MONTH:
January, 1985 METHOD OF TYPE SHUTTING DOWN F:
FORCED DURATION THE REACTOR OR CORRECTIVE NO.
DATE S:
SCHEDULED (HOURS)
REASON (1)
REDUCING POWER ACTIONS / COMMENTS N/A r
(0625M) i
E.
UNIQUE REPORTING REQUIREMENTS 1.
Safety / Relief valve operations for Unit One.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT 1/25/85 1RY456 1 Automatic Mode 3 Vent RCS Pressure l
1/25/85 1RY455A 3 Automatic Mode 3 Vent RCS f
Pressure 1/27/85 1RY455A 6 Manual Mode 3 Reset Valve Due to leakage l-i
.(0625M) 1
F.
LICENSEE EVENT REPORTS The following is a tabular summary of all licensee event reports for Byron Nuclear Power Station, Unit one, during the reporting period, January 1 through January 31, 1985. This information is provided pursuant to the reportable occurence reporting requirements as set forth in 10CFR 50.73.
Licensee Event Report Number Date Title of Occurrence 84-025-00 1/7/85 Reactor Trip due to procedural error 84-026-00 12/28/85 Source Range Inoperability 84-027-00 1/4/85 Spurious high radiation alarm actuation of ventilation 84-028-00 1/4/85 Spurious high radiation alarm actuation of ventilation S4-029-00 1/2/85 Spurious high radiation alarm actuation of ventilation 84-030-00 1/8/85 Loss of instrument bus causing boron dilution action 84-031-00 1/15/85 Boron dilution actuation due to noise spike 84-032-00 1/8/85 Impaired fire barrier 84-033-00 1/16/85 Spurious high radiation alarm actuation of ventilation 84-034-00 1/3/85 Loss of licensable sources 84-035-00 1/23/85 Accidental start of control room ventilation 84-036-00 1/24/85 Charging pump operating without emergency power source 84-037-00 1/24/85-Control room ventilation start 84-038-00 1/24/85 Spurious high radiation alarm actuation of ventilation 84-039 1/24/85 Automatic start of control room fan 84-040-00 1/24/85 Control rod bank position indication failure (0625M)
N Commonwerith Edison
?-
C / - Byron NuctrarStation C 4450 North Gstman Church Road Byron, Illinois 61010 February 14, 1984 LTR:
BYRON 85-0228 File:
2.7.700 Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Washington, D.C.
20555 ATTN: Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period covering January 1 through January 31, 1985.
Very truly yours, k R. E. Querio 1
Station Superintendent Byron Nuclear Power Station REQ /KRH/clb.
Enclosure cc:
J.G. Keppler,'NRC, Region III NRC Resident Inspector Byron Gary Wright, Ill. Dept. of Nuclear Safety D.P. Galle, CECO i.
D.L. Farrar, CECO INPO Records Center p
[.-
i.
L I
l(0625M).