Monthly Operating Repts for Jan 1985
ML20107D238
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/31/1985
From: Alden W, Logue R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8502220283
Download: ML20107D238 (10)


Text

-,

OPERATING DAIA REPURI s wys ; r --"r.y DOCKET NO. 50 - 277 t-

+

DATE FEBRUARY 15,1985 COMPLETED BY PHILADELPHI A ELECTRIC' COMPANY W.M.ALDEN ENGINEER-1N-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS

1. UNIT NAMEt PEACH BOTTOM UNIT 2 i NOTES: UNIT 2 CONTINUED ITS l

1 I

_2. REPORTING PERIOD JANUARY, 1985 l

SCHEDULED SHUTDOWN FOR l

i 1

3. LICENSED THERMAL POWER (MWT):

3293 I

ITS SIXTH REFUCLING AND l

I

4. NAMEPLATE RATING (GROSS MWEla 1152 l

MAINTENANCE OUTAGE.,

1 I

l

5. DESIGN ELECTRICAL RATING,(NET MWEnt 1065 I

i 1

I

o. MAXIMUM DEPENDABLE CAPACITY (GROSS MWEls 1098 l

l l

l

7. max 1 MUM DEPENDA8LE CAPACITY (NET MWE):

1051 l

l 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMSER 3 THROUGH 7) SINCE LAST REPDRT, GIVE REASDN!

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-T D-D AT E CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 744 92,736
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0

0 62,283.6

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS' GENERATOR ON-LINE 0.0 0.0 60,556.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0

178,420,001

17. GROSS ELECTRICAL. ENERGY GENERATED (MWH) 0 0

58,718,660

13. NET ELECTRICAL ENERGY GENERATED (MWH)

-3,004

-3,804 56,258,534 5-

19. UNIT SERVICE FACTOR 0.0 0.0 65.3 20.' UNIT AVAILABILITY FACTOR' O.0 00 65.3 (US'NG5 DC NET) 0.0 0.0 '

57.7 I

HN

21. UNIT:CAPACITYcFACTOR

?cloa. :

x

.r s,

m '_.

~

N 70N N dAFAk1 W Ab 0 05INIDMNEITI O.0 0.0 57.0 2

' 0DCD

23. UNIT FORCED OUTAGE RATE 0.0 0.0 12.5 g

'24. SHUTDOW45 SCHEDULED DVER NEXT o MONTHS (TYPE, DATE, AND DURATION OF EACH):

r

'N SCHEDULED SHUTDDWN FOR REFUELING AND MAINTENANCE, C)

STARTED 4/27/84 RI f4

25. IF SHUT 00WN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt 05/01/85
25 t gggg7;
20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY g

INITIAL ELECTRICITY

[j[

COMMERCIAL OPERATION

+

~

.w.<w.

OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE FEBRUARY 15,1985 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 4

OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 3 i NOTESS UNIT 3 INCURRED ONE SCHEDULED I 1

I

2. REPORTING PERIODE JANUARY, 1985 l

AND ONE FORCED LOAD REDUCTION l l

g

3. LICENSED THERMAL POWER (MWT)*

3293 l

AND ONE FORCED OUTAGE. UNIT 3 1 1

I

4. NAMEPLATE RATING (GROSS MWE):

1152 l

IS BEING ADMINISTRATIVEY I

l g

5. DESIGN ELECTRICAL RATING (NET MWE):

1065 i

LIMITED TO 872 POWER TO LIMIT l l

1

6. MAX 1 MUM DEPENDABLE CAPACITY (GROSS MWE): 1098 1

0FF GAS RELEASE.

l l

l

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1035 I

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASON!
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEla
10. REASONS FOR RESTRICTIONS, IF ANY THIS MONTH YR-TO-DATE CUMUi.ATIVE
11. HOURS IN REPORTING PERIOD 744 744

. 88,632

12. NUMBER.0F HOURS REACTOR WAS CRITICAL 744.0 744.0 65,301.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 734.6 7 34. 6 03,599.7 15.~ UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 Ob
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,052,720 2,052,720 186,252,528
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 682,870 682.870 61,190,410
18. NET ELECTRICAL ENERGY GENERATED (MWH) 661,384 661,384 58,770,686 c 19. UNIl SERVICE FACTOR 98.7 98.7 71.8
20. UNIT AVAILABILITY FACTOR I, 98.7 98.7 71.8

'21. ;UNITj CAPACITYj FACTOR:!( USING MOC NET) 85.9 85.9 64.1

.a

r.

~$2bMMYClYlTdT'0D,i nYINil DER Nffl ^'

85 1 83.'5~

^

" 62 3

^

~~

23. UNIT FORCED OUTAGE RATE 1.3 1.3 7.4
24. SHUT 00WNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH ):

REFUELING AND MAINTENANCE OUTAGES FROM S/04/85 6/28/85.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP 4,
26. UNITS IN TEST STATUS -(PRIOR TO COMMERCIAL OPERATION):

FORECAST

ACHIEVED.

'~

L INITIAL CRITICALITY j

i INITIAL ELECTRICITY 4,.'

' I{:; ; ;

-COMMERCIAL OPERATION 4 -

n :

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE FEBRUARY-15,1985 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN l

ENGINEER-IN-CHARGE

-LICENSING SECTION GENER ATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022 MONTH JANUARY 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

( MWE-N ET )

(MWE-NET) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23

- 0 8

0 24 0

9 0

.25 0

10 0

26 0

'll 0

27 0

12 0

28 0

4 13 0

29 0

14 30

- 0 15 0

31 0

16 0

- vr r

w w

w 6-gw<w

-e

,,.-,y-%

-+9wwrw-

-p,sp emw

-e.9---

y

---w mw.

mg+

gv-e-w- - -e-

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE FEBRUARY 15,1985 COMPANY PHILADELPHIA ELECTR COMPANY

'.M.ALDEN

.NGIN EER-IN-C HARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH JANUARY 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY = POWER LEVEL (MWE-NET)

(MWE-NET) 1 900 17 913 2

900 18 914 3

907 19 918 4

923 20 916 5

-850 21 951 6

911 22 954 7

912 23 518 8

906 24 643 9

912 25 948 10 908 26 949 f

i~

11 915 27 957 12 918 28 955 13 923 29 955 14 928 30 957 15 619 31 920 i

16 858 k.

~ ~ - ~

u

,.~.;.

-I

- g.

-c UNIT SHUTDOWNS'AND POWER REDUCTIONS COCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2

(

DATE FEBRUARY 15,1985

(

REPORT MONTH JANUARY. 1985 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY -

W.M.ALDEN

(

ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLE AR

'(

TELEPHONE (215) 841-5022.

t l

l l

i l e4ETHOD OF-l LICEN SEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE I

ITYPElDURATIONikEASONISHUTTING DOWNI EVENT 1 CODE I CODE I ACTION TO NO.8 DATE I (131 (HOURS)l (23 l REACTOR (33 l REPORT # 1 (4) l (5). I PREVENT RECURRENCE

(

4 i

i i

i i

I I

I I

i 1 i E50101 i Sl 744.0 1

C i 1

i NA l RC l FUELXX l SHUTDOWN FOR ITS SIXTH REFUELING OUTAGE.

(

1 I

l l

1 1

I I

I 4~

1 I

l 744.0 l

l l

l I

i 4

f.

1 (1)

(2)

(3)

(4) i F - FORCED REASON METHOD ~

EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA e

B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - DTHER (EXPLAIN)

FILE (NUREG-01ol) a

. E - OPERATOR TRAINING + LICENSE EXAMIN ATION F - ADMINISTRATIVE (5) e G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE A

e 2

1-c I

e 9

i I

DOC AET NO. 50 - 278 UNIT SHUTDOWNS AND POWER RE00CTIONS

(

UNIT NAME PEAR;; 80TTOM UNIT 3 DATE FEBRUARY 15.1985 I

REPORT MONTH' JANUARY. 1985 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN

}

ENGINEER-IN-CHARGE l-LICENSING SECTION

')

GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 1

I

'l l

l METHOD OF I LICEN SEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE -

1 1

I TYPElDURATIONIREASONISHUTTING DOWN!

EVEN T l CODE I CODE l ACTION TO CO.I.DATE I (111 (HOURSil (2) l REACTOR (31.1 REPORT # 1 (4) I (5) l PREVENT RECURRENCE ( i i I I I I I I i -1 1 l a50105 i S I 00.0 i B 1 4 'i N/A l HH l PIPEXX l LOAD REDUCTION TO REPAIR BROKEN TEST TAP ON I I l_ l l l l l l THE 3A CONDENSATE PUMP. i l I i i i I I I i 1 2 1 650115 l F l 00.0 l D l 4 1 3-85-02 i EC l ENGIN/ l THE E4 DIESEL WAS INOP AND THE 39A RHR VALVE I I i 1 1 I I I I WAS INOP WHICH TOOK OUT CONTAINMENT COOLING i I I I' l l 1 l l SUBSYSTEMS. THIS WAS A LIMITING CONOITION 1 i i i l i l l l l l AND A LOAD REDUCTION WAS TAKEN TOWARDS SMUT-I I I I I l' l 1. I DOWN. THE VALVE WAS RETURNED TO SERVICE BEFORE 1 I I I i 1 l l l THE UNIT WAS REMOVED FROM SERVICE. i l i 1 I I I I I I + 3 I 850123 l F l 09.4 l A 1-1 1, N/A I HA ~l GENERA ' l GENERATOR TAKEN OFF LINE.TO CLEAN UP AN OIL I I I 1 l l l. I I LEAK WHICH. CAUSED A GENERATOR FIELD GROUND. ). I i 1 --- 1 l- -I .I-1 'I -1 l l l l l 9.4 l 1 I 5 4 k. ,' ) I I (1) (2) (3) (4) !) ~ EXHIBIT G - IN STRUCTIONS F - FORCED REASON METHOD j) S - SCHEDULED - A - EQUIPMENT F AILURE (EXPLAIN) 1.- MANUAL FOR PREPARATION OF.9ATA j -S - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS f 0R LICENSEE C'- REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT ( LER). D - REGUL ATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161) )- E - OPERATOR TRAININC. + LICENSE EXAMIN ATION F - ADMINISTRATIVE (5) G - OPERATIONAL ERROR (EXPLAIN) -) H - OTHER(EXPLAINI EXHIBIT I - SAME SOURCE ih i

Docket No. 50-277 ~* Attachmnnt to Monthly Operating Report for January, 1985 REFUELING INFORMATION 1. Name of facility: Peach Bottom Unit 2 2. Scheduled date-for'next refueling shutdown: April 27, 1984 3. -Scheduled da'te for restart following refueling: May 1, 1985 4. Will refueling or resumption cf operation thereafter require a technical specification change or other license amendment? Yes If answer is yes, what, in general, will these be?

Technical Specifications to accommodate reload fuel.

Modifications to reactor core operating limits. 5. Scheduled date (s) for submitting proposed licensing action and supporting information: Reload 6 license amendment application submitted September 7, 1984. 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: None expected. 7. The number of fuel assemblies (a) in the core and - (b) in the spent foel storage pool: (a) Core - 7G4 Fuel Assemblies to be returned from fuel pool' (b)- Fuel Pool - 1170 Fuel Assemblies, 58 Fuel Rods 8._ The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or-is planned, in number of fuel assemblies: The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblics. 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity. September, 1990 (March,1986, with reserve full core discharge) L

1 k Dockot No. 50-278 Attachm:nt to Monthly Operating Report for January, 1985 REFUELING INFORMATION 1. Name of facility: Peach Bottom Unit 3 2. Scheduled date for next refueling shutdown: May 4, 1985 3. Scheduled date for restart following refueling: June 15, 1985. 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes. If answer is yes, what, in general, will these be? Technical Specifications to accommodate reload fuel. Modifications to reactor core operating limits. 5. Scheduled date (s) for submitting proposed licensing action and supporting information: MAPLHGR Limits Submitted January 7, 1985 Additional Core Limit Information - April 12, 1985 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: None expected. 7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool: (a) Core - 764 Fuel Assemblics (b) Fuel Pool - 1212 Fuel Assemblies, 6 Fuel Rods 8. The present licensed spent fuel pool storage capacity and the size of any increase in licenced storage capacity that has been requested or is planned, in number of fuel assemblies: The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblics. 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity. September, 1991 (March, 1987, with reserve for full core discharge) t-

I Docket Nos. 50-277/50-278 Attachment to Monthly Operating Report for January, 1985 Peach Bottom Atomic Power Station Narrative. Summary of Operating Experiences January, 1985 UNIT 2 The Refueling / Pipe Replacement outage continued throughout the month of January. The previous end date of 3/31/85'has been changed to-5/1/85. Pipe replacement status as of 1/31/85 is as follows: 37 of 52 new pipe spools placed in the drywell; 78 of 102 weld preps have been. completed;:30 of 78 welds completed; 22 of 30 completed .weldsfhave.been accepted; and 8 new welds in progress. BothA' and 'B' recirculation pump motors are in_the drywell and are ready for installation. Welding is complete for eight of the ten recirculation riser safe ends. UNIT 3' 'The unit began the month limited to 854 power due to high_offgas activity. On January 5, load was reduced to 66% _ power to repair a broken test tap on the 3A condensate pump..The unit returned to:804 power on January 6. ~On January 7, thel'A' loopLtorus cooling valve would not stroke and was declared" inoperable. An Unusual. Event was declared and-shutdown was initiated on January 15 when the E-4 diesel generator and the 'A' loop torus cooling valve were_ declared inoperable. The valve was' returned to service by the time the unit reached 25%. The E-4 diesel generator returned to~ service on January 21. The unit was shutdown on January 23 to clear the. generator exciter brushes. (An oil _ leak is causing ground fault alarm.) On . January 24,-the. unit returned to service and reached 90% power

the next day.- At month _end, it'was taken out-of-service to perform surveillance tests.-

/SLZ

u e PHILADELPHIA ELECTRIC COMPANY i 2301 MARKET STREET P.O. BOX B699 PHILADELPHIA. PA.19101 (21518414000 February 15, 1985 Docket Nos. 50-277 50-278 Director Office'of_ Inspection & Enforcement . US Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

SUBJECT:

Peach Botton Atomic Power Station Monthly Operating Report Gentlemen: Attached are twelve copies of the monthly operating ' report for Peach Bottom Units 2 and 3 for the month of January, '1985 forwarded pursuant to Technical Specification G.9.1.C under - the-guidance of Regulatory Guide 10.1,: Revision 4. Very truly .ours, ) R. E. Logue Superintendent Nuclear Services h .Attac ment cc: Dr. T. E. Murley, NRC Mr. J. H. Williams, Resident Inspector Mr. Stan P.-.Mangi, Dept. of Envir. Resources Mr. P. A.'Ross, NRC (2: copies) INPO Records ~ Center d'6 J 2R L}}