Forwards Rev 1 to Control of Heavy Loads,Response to Generic Ltr 81-07. Rev Reflects Resolution of Eg&G Comments Re Load Handling Sys & Considered Final Rept
ML20106J961
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/19/1984
From: Goldberg J
HOUSTON LIGHTING & POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20106J966 List:
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-6112, RTR-NUREG-612, TASK-A-36, TASK-OR GL-81-07, GL-81-7, STS-HL-AE-1129, NUDOCS 8411010408
Download: ML20106J961 (3)


Text

'

The Light NE f Houston Lighting & Power P.O. Box 1700 1louston, Texas 77001 (713) 22F d211 October 19 1984 ST-HL-AE-li29 File No: G9.10 Mr. D. G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Comission Washington, D. C.

20555

Dear Mr. Eisenhut:

South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN-499 Submittal of Revised Response to Generic Letter 81-07, Control of Heavy Loads Houston Lighting & Power Company (HL&P) conducted a review of the load handling systems at the South Texas Project (STP) and on December 19, 1983 submitted a complete response for STP to Generic Letter 81-07. On July 2, 1984, NRC provided HL&P with a copy of the Technical Evaluation Reports prepared by EG&G Idaho, Inc. which described the results of their review of the Control of Heavy Loads Report for STP. As requested by NRC, a conference call was held on August 13, 1984 to address the comments generated by EG&G.

The enclosed Revision 1 to the Control of Heavy Loads Report for the South Texas Project reflects the resolution to the EG&G comments as discussed in the conference call. The resolution of each comment and corresponding revisions to the report are described in the Summary of Revision 1 at the beginning of the report.

The enclosed report addresses the load handling systems currently in the STP design and is considered a final report. As the STP design is not yet complete, there may be a need to add or modify load handling systems.

In the event this becomes necessary, the new load handling systems and any modifications to existing load handling systems will consider the guidance of Generic Letter 81-07.

o!ooONg Yg 4

PDR p

W2B/L002MM/cc

pg.

-: Houston Lighting & IN>wer Company October'19, 19: 1 ST-HL-AE-1129

' File No: G9.10 Page 2

. If you should have an i

i this matter, please contact

.Mr. Michael.E. Powell at (y quest ons concern ng 713) 993-1323.-

Very truly yours, J. H. Goldberg Vice President huclear Engineering and Construction

- MAM/na

Enclosure:

Control of Heavy Loads - Response to NRC Generic Letter 81-07 for South Texas Project Units 1 & 2, Revision 1, October 1984 W28/ LOO 2M/cc L_:

ga m

j'l b;W fx',

19,-1984 e

Octcber f.

f"

ST-HL-AE-1129

, j L Houston Lighting & Pbwer Company 3;..

File,Noi G9.10

(\\, -

Page 3

~

~

pcc
-
  1. ~

Robert D.IMart h.

City-Public' Service Board J.-B. Poston/A.-.vonRosenberg

Regional Administrator, Region IV.

M l Nuclear Regulatory Commission P.O. Box 1771'

[611tRyan Plaza Drive, Suite 11000 San Antonio,<TXl~78296

' Arlington,'TX: :76012::

Brian E. Berwick, Esquire-A Victor Nerses~,iProject Manager._.

Assistant Attorney.. General for

'a

U.S. Nuclear Regulatory Commission the' State of Texas A -

7920 Norfolk-AvenueL

.P..0.1 Box.12548,-Capitol Station 2 -

-Bethesda,;MD1:20814 Austin, TX 78711-1.MTomlinson f

D M

Lanny Sinkin Residenttinspector/ South Texas'~Piojectf Citizens Concerned About Nuclear Power C

tc/o' U.S. " Nuclear! Regulatory Commissioni 114 W. 7th, Suite 220

" ~

Austin,-TX 78701 1P.:0.xBox 910

,f..,

? Bay, City, TX1;77414 Robert G. :Perlis, Esquire

Dan Carpenter

. Hearing Attorney

~:

! Resident Inspector / South Texas Project Of' ice of-the Executive Legal Director.

J c/o-U.S.lNuclea'r.Regul atoryl Commission :

U.S.' Nuclear Regulatory Comission :

P. 0. Box 910 Washington, DC 20555 Bay City,iTXl 77_414 Charles Bechhoefer, Esquire

! M. ; D..Schwar., Jr., Esquire Chainnan, Atomic. Safety & Licensing _ Board s

Baker 8.Botts-

~

U.S. Nuclear Regulatory-Commission _

One Shell Plaza._

Washington,.DC--20555

Houston, LTX
77002
Dr. James C. Lamb, III

' J.: RE Newnan,. Esquire:

313 Woodhaven Road Newman : 8 Hol tzinger, - P.C. -

Chapel Hill, NC 27514.

w -.16151L' Street,<N.W.

^

Washington; DC 20036 Judge Ernest-E.. Hill.

~

Hill' Associates:

Director, Office of; Inspection 210 Montego Drive i" ~

and EnforcementL

'Danville, CA 94526 U.S. Nuclear Regulatory _Comission

c-y l Washington, DC ; 20555 William S. Jordan, III, Es. quire Harmon & Weiss.

Z LEE R. Brooks /R. L._ Range 1725 I Street, N.W.

LCentralLPower & Light Company Suite ~506 C-1 E4 LP.J0.~ Box 2121

~~

Washington, DC 20006

~

e : Corpus.Christi, TX 78403c Citizens for Equitable ~ Utilities, Inc.

. ~

~m jH.'L.'fPeterson/G.Pokorny c/o Ms. Peggy'Buchorn

' City of: Austin-Route-1, Box 1684

7. 0. Box 1088 Brazoria, TX 77422 Austin,?TX 178767 L

Docketing & Service Section Office of the Secretary

^

+

U.S. Nuclear Regulatory Commission Washington, DC 20555

~

Revised 10/01/84 W2B/ LOO 2P91/cc p