1 OPERATING DATA REPORT DOCKET NO.
50-244 DATE _ January 14. 1985 COMPLETED BY Skr* b MO ="
f Andrew E.
McNamara-TELEPHONE f315) 524-4446 OPERATING STATUS Ext. 301 Ginna Station
- 1. Unit Name:
-GINNA STATION. UNIT #1 -
Notes
- 2. Reporting Period:
December. 1984 The reactor power
' 3. Licensed Thermal Power (WWe):
1520 level was maintained at
- 4. Nameplate Rating (Gross MWe):
490 100% for the majority of 470 the report period, with
- 5. Design Electrical Rating (Net MWe):
two exceptions, detailed
- 6. Maximum Dependable Capacity (Gross MWe):
490 on Page 4.
- 7. Maximum Dependable Capacity (Net MWe):
470
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to Date Cumulative
- 11. Ilours In Reporting Period 744.00 8.784.00' 132k360.0_0
- 12. Number of flours Reactor Was Critical 744.00 6.848.73 100.448.71
- 13. Reactor Reserve Shutdown llours 0
56.23 1.687_55*
744.00 6,780.75 98.292.38
- 14. Ilours Generator On-Line 0
0' 8.5*
- 15. Unit Reserve Shutdown ilours
- 16. Gross Thermal Energy Generated (MWil) 1,126.992 10.027.992~
136.285.761
- 17. Gross Electrical Energy Generated (MWil) 374,796 3.321.037 44,485.407
- 18. Net Electrical Energy Generated (MWil)-
356,693 3,156,778 42,183,021
- 19. Unit Service Facto, 100%
77.19%
'74.26%
100%
77.19%
74.27%
- 20. Unit Availability Facto,
- 21. Unit Capacity Factor (Using MDC Net) 102.0%
76.46%
69.50%
102.0%
76.46%
69.50%
- 22. Unit Capacity Factor (Using DER Net) 0 3.76%
7.74%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Cummulative Total Commencing January 1, 1975
< e... m a v. um 8502190000 841231 J
g 7q p, PDR ADOCK 05000244 R
7,
'l i
) AVERAGE' DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT
- 1, Ginna Station DATE January 14, 1985 COMPLETED BY Em _QdE. A4W -
Andrew E. McNamara TELEPHONE 1-(315) 524-4446-Ext. 301 at Ginna l'
MONTH December, 1984 i
-- DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
479 17.
'481
' 2.
478 18.
481 3.
479 19.
481 l
{
4.
479 20.
480 5.
480 21.
480 6.
478 22.
480 t
t 7.
479 23.
480 8.
480 24.
481 l
9.
480 25.
480 10.
479 26.
479 1
11.
479 27.
480 12.
480 28.
480 13.
480 29.
478 14.
480 30.
477 j.
15.
480 31.
477 16.
480 INSTRUCTIONS i
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
1 a
1 I
IXX'.KET NO.
50-244 UNITNAME _ #1,Ginas Station 14 85 UNIT SHUTDOWN AND POWER REDUCTIONS DATE M nuary COMPLETED HY
'" 8-
^ ^ -
Andrew E.
McNamara REPORT MONTH Decomhe" TELEPilONE ( ~4151 524-4446 Ext. 301 Ginna Station n
g2 TI N l=j cous. s, c.,r.ctiv.
Licens No.
Det.
_{
jg
}$j Event 2.g a
Accion to Report #
- d
!u Prevent Reeverence e
g3 g
e 2
g u
O Two minor reductions are detailed on Page 4.
1 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
?
G-Operational Error (Explain)
..... in e v um H-Other (Explain)
Exhibit 1 - Same Source
r a
> NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT Ginna Station, Unit #1 DATE January 14, 1985 h-COMPLETED BY Andrew E. McNamara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH
' December, 1984 The reactor power level was maintained at 100% during the entire report period, with two minor exceptions.
On December 7, the power level was reduced to ~ 95% for a short period due to positive reactivity addition caused by the condensate' bypass valve going open.
On December 11, the power level was reduced to ~ 97% to perform PT-16, a periodic test on the Auxiliary Feedwater System.
- o-(*4 GINNA STATION' MAINTENANCE: REPORT'
SUMMARY
DECEMBER,~1984 During the: month lof December, routine maintenance and inspections were icompleted.
Major' safety related work-included:
1.
Completion of preventive maintenance of the 1B Service Water Pump.
-2.
Temporary sealing of a small' flange' leak on the pressurizer spray valve, PCV-431A.
3.
Replace ' drive belts :and repack: the 1A charging ' pump..
4.
Preventive maintenance on R-13/14 Plant Vent Radiation Monitor-sample pump.
i
b."
- ~'%
e,xx,y rny
.. - Y - 'al e
m
,, n p
,f
^ 9*" ?:
jmT!a:s -
j 800$$::::t dd d "'%l t:1 i ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y.14649 A
YELEPHOat e
anta coot no 546 2700 GINNA STATION
_ January 14,'1985 Director, Office of Management Information and Program Analysis U.S.-NUCLEAR REGULATORY COMMISSION Washington, DC 20555
Subject:
Monthly Report for December, 1984 Operating Status Information R.
E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna' Station for the month of December, 1984.
Very truly yours, Lu<f Bruce A.
Snow Plant Superintendent BAS /eeg Attachments cc: