ML20106J362

From kanterella
Jump to navigation Jump to search
Forwards Rev 29 to Plant Security Plan.Rev Withheld,Per 10CFR73.21
ML20106J362
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/05/1996
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9604100268
Download: ML20106J362 (2)


Text

.

Southern Nuci:tr OD: rating Company Post Off ce Box 129S Birmingnim. Alaeama 35201 SAFEGUARDS INFORMATION Te!ephone (205) 8G8 5131 (TIIIS PAGE IS DECONTROLLED IF DETACIIED FROM PAGES IN ATTACIIMENT 1) h Southern Nudear Operating Company Dave Morey Vice Pres: cent

  • he Southem ereClf!C SVSlem Fadey ProIect April 5, 1996 10 CFR 50.54 Docket Numbers: 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant (FNP)

Revision 29 to the FNP Security Plan Ladies and Gentlemen:

In accordance with 10 CFR 50.54(p), Southern Nuclear Operating Company submits Revision 29 to the FNP Security Plan. In accordance with 10 CFR 50,4(b)(4), the signed original and three copies are being sent to the Document Control Desk, and two copies are being sent to the appropriate Regional Office.

Southern Nuclear has reviewed Revision 29 to the FNP Security Plan concerning VA checks, and has f

determined that the revision does not decrease the safeguards effectiveness of the FNP Security Plan.

Additionally, the VA check process removed from the FNP Security Plan has been incorporated in an FNP Security Procedure, and the process was better defined and improved.

Please note that the information contained in Attachment 1 is safeguards information, and should be withheld from public disclosure in accordance with 10 CFR 73.21. Also note that the FNP Security Plan revision concerning a biometrics access control system (Revision 28) will not be issued until the j

NRC Staff approves the revisions, and the biometrics access control system has been implemented.

(The biometrics revision to the FNP Security Plan will not be number 28, but will be numbered j

sequentially with the appropriate FNP Security Plan revision at that time.)

l If there are any questions, please advise.

Respectfully submitted,

i. /

l}Wu 9604100268 960405 D' ave Morey PDR ADOCK 05000348 PDR p-

^

DRC/maf:sp-r-29. doc cc list and attachment list: See next page.

I 110008 it SAFEGUARDS INFORMATION

(

(TIIIS PAGE IS DECONTROLLED IF DETACIIED FROM PAGES IN ATTACIIMEh 1)

e SAFEGUARDS INFORMATION (TIIIS PAGE IS DECONTROLLED IF PAGES IN ATTACIIMENT 1 ARE REMOVED)

U. S. Nuclear Regulatory Commission Page 2 cc:

U. S. Nuclear Regulatory Commission. Washington. D. C.

Mr. B. L. Siegel (w/0)

Document Control Desk (wl3) tsore: contauns safeguards inform,tions U. S. Nuclear Regulatory Commission. Region 11 Mr. S. D. Ebneter, Regional Administrator (w/2) tNore: containssafeguardsInformation)

Mr. T. M. Ross. Senior Resident inspector (w/0)

Attachments I. Amended Security Plan Pages (NOTE: Containssafeguardsinformationl

2. Description and Justification of Changes
3. Insertion Instructions i

l l

1 1

/

i i

i SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF PAGES IN ATTACIIMENT 1 ARE REMOVED) u