ML20106H233

From kanterella
Jump to navigation Jump to search
Forwards Rev 10 to Gap Security Dept Vogtle Electric Generating Plant Nuclear Security Training & Qualification Plan, Describing Training Requirements of non-security Personnel Watchperson(S)
ML20106H233
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/13/1996
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20106H238 List:
References
LCV-0631-B, LCV-631-B, NUDOCS 9603200324
Download: ML20106H233 (6)


Text

,' Georgia Power Company 40 invemess Center Parkway

. Post Off:ce Box 1295 Birmingham, Alabama 35201 Telephone 205 877 7122 -

he'eToeXtlNuc! ear Vogtle Protect NbDM the Southem electlC System March 13, 1996 LCV-0631-B Docket No. 50-424,425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT NUCLEAR SECURITY TRAINING AND OUALIFICATION PLAN- REVISION NO.10 In accordance with the requirements of 10 CFR 50.4 and 50.54 (p), Georgia Power Company (GPC) hereby submits three copies of Revision 10 to the Vogtle Electric Generating Plant Nuclear Security Training and Qualification Plan (VEGP TQP). By copy of this letter, two copies of the change are also being provided to the NRC Region II office.

Each modification of the TQP in Revision 10 is marked with revision bars and describes the training requirements of the non-security personnel watchperson(s). This position was added and procedures updated last year in accordance to 10 CFR 50.54 (p) requirements of Amendment 28 of VEGP Physical Security and Contingency Plan. This amendment was submitted to the NRC by letter LCV-0631 on August 8,1995, and acknowledgment and concurrence of this change as meeting the requirements of 10 CFR 50.54 (p) was documented by NRC letter December 12,1995. This change to the TQP adding the

. watchperson(s) training criteria was approved by VEGP management for use on October 19,1995. Training will be completed during June 1996.

Enclosed is the justification for the change, insertion instructions, and applicable Revision 10 pages. Please contact this office if you have any questions.

Sincerely, C. K. McCoy cc and enclosures: (next page)

D 9603200324 960313 PDR ADOCK 05000424 l' PDR 190066 3010 ' I

1 GeorgiaPower d U. S. Nuclear Regulatory Commission Page 2 of 2 LCV-0631-B

Enclosures:

1. Justification for Changes
2. Insertion Instructions
3. VEGP TQP - Revision 10 CKM/AFS/afs cc: Georgia Power Comoany Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle l

l l

r=m _

j

l l

l l

ENCLOSURE 1

[

VEGP NUCLEAR SECURITY TRAINING AND QUALIFICATION PLAN-REVISION NO.10 l

JUSTIFICATION FOR CHANGES c

Changes: Section 4.1, " Initial Training and Qualification"; Section 4.2, ,

"Requalification"; and Section 4.3, " Performance Deficiencies" -

This change adds the expectations and requirements of non-security watchperson(s) for initial training, requalification and actions taken for l performance deficiencies.

Justification: Job performance expectations for the watchperson(s) are the same as other personnel in the Security organization. ,

l Change: Annex l-2," Training and Duty Summary". This change adds the specific ,

responsibility to train the non-security watchperson(s) on the site security organization and communications tasks.

Justification: This individual only performs specific pre-planned compensatory measures  ;

and therefore only need to be trained in those applicable areas. The watchperson(s) does not perform an active response function. j l

! El-1 i

I 1 l

  • I l

I

( , e l

I l

l l

ENCLOSURE 2 VEGP NUCLEAR TRAINING AND QUALIFICATION PLAN -

REVISION NO.10 INSERTION IESTRUCTIONS i

l t

- .- =. . -.- . .. - - . . - . . . . - - - - - . - . . . . .__

VOGTLE ELECTRIC GENERATING PLANT l UNIT 1 AND UNIT 2 j NUCLEAR SECURITY TRAINING AND QUALIFICATION PLAN I Revision 10 Insertion Instructions March 1996 Egga Instruction l Title Page Replace

p. 4-1 Replace l l p. 4-2 Replace-l Annex 1-2 Replace i

K:\wy\@W\revinser l

1 i ENCLOSURE 3 VEGP NUCLEAR SECURITY TRAINING AND QUALIFICATION PLAN d

CHANGED PAGES - REVISION NO.10 4

4

.