ML20106G472
| ML20106G472 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 02/27/1996 |
| From: | Wanczyk R VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BVY-96-16, NUDOCS 9603050186 | |
| Download: ML20106G472 (4) | |
Text
.-
VERMONT YANKEE NUCLEAR POWER CORPORATION P.O. Box 157, Governor Hunt Road
(
W,'{
Vernon, Vermont 05354-0157 (802) 257-7711 e
February 27,1995 BVY 96 16 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Document Control Desk
Reference:
a)
License No. DPR-28 (Docket No. 50-271)
Dear Sir:
Subject:
Fitness for Duty Program Data for the Period 7/1/95-12/31/95 Pursuant to the provisions of 10 CFR 26.71, enclosed is the testing data and associated results for the Fitness for Duty Program at Vermont Yankee. The attached information includes both our corporate and plant locations as our program does not distinguish between the two sites but treats them as a single entity.
j
{
Also, provided as Attachment A, is the evaluation and analysis of the data for this same period.
We trust the enclosed information is adequate; however, should you have any questions please feel free to contact us.
Very truly yours, V
nt 1p Nuclear Power Corporation
\\
\\
- k for obe I
anczyk Plant Manager l' t ;r.00 5 9603050186 960227 PDR ADOCK 05000271 l
R PDR a
e Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 i
Vermont Yankee Nuclear Power 07/01/95 - 12/31/95 e Muse snes
)
Governor Hunt Road, Vernon, VT 05354 Laeaman Greg Morgan, Security Manager (802)258-5800 conema Name Phone pneuse see ameni Cutotts: ScreervContrmenon (ng/mt)
Q Appendix A to 10CFR 26 Marijuana 50 15
/
Amphetarrunes 1000/500
/
Cocaine 300/150
- gg g,;,
25 25 f
/
y Opiates 300j300 AlcoholM BAC) 0.04% BAC f
Testing Results LonO-Tenn Shon-Term Ucensee Employees Conner Personnel ContractorPersonnel Average Numberwith Unesconec Access 343 428 Categories Temed Positive Tested Postive Tested Postke Prem ccess a
31 158 1
n R
Post accdont o
Eg Observed behaver l
1 Random 90 1
77 Follow up y
Other i
Total 121 2
236 1
REY.1/92
e e
e 4t) v F3 N
v.
11 1a' a
h'f h
i 1
j
}
~-
i o f i l l b
2 5 j
l I l l
c.,
l ATTACHMENT A EVALUATION OF FFD DATA 7/1/95-12/31/95 FOR CAUSE TEST RESULTS l
There was one (1) for cause test administered during this I
evaluation period with negative results.
l POSITIVE TEST RESULTS l
e There were two (2) positive test results during this period.
One in our random testing program and one in our follow-up testing program.
l FOLLOW-UP TESTING PROGRAM One (1) individual is currently in the Vermont Yankee follow-e i
up testing program as a result of a postive random test l
involving marijuana use.
One individual in the follow-up l
program was terminated from employment.
l l
TEST RESULTS ASSESSMENT e
Vermont Yankee continues to monitor for Marijuana at the lowered initial test cutoff level of 50 ng/ml.
1 The test results for this period compared to previous periods indicate that Vermont Yankee continues to maintain an effective FFD program which ensures that the plant site remains a work environment free from the effects of drugs or alcohol. The program continues to serve as an effective deterrent to the use or introduction of drugs or alcohol in the work place.
The results of this period are as expected during a period which does not include a refueling outage.
i l
l