QUAD-CITIES DPR-29 T5BLE 4.2-l' (cont'd)
Instrument' Instrument Func}2;ignal-Instru nj Test l Calibration (2)
Check Channel 2
HPCI_ Isolation 1.
Steam 11ne hign flow (1) (9) (10} <
(9) (10)
None 2.
Steamline area.high temperature Refueling outage
-Refueling outage None 3.
Low reac' tor pressure (1) (10)
(10)
None
. Reactor Building ventilation System Isolation and Standby Treatment System Initiation 1.
Refueling floor radiation (1)
Obce/3' months Once/ day monitors i
Steam Jet Air Ejector Off-Gas Isolation 1.. Off-gas radiation monitors (1) (4)
Refueling outage Once/ day Control Room Ventilation System Isolation 1.
Reactor low water level (1)
Once/3 months Once/ day 2.-
Drywell nigh pressure (1)
Once/3 months None 3.
Main steamline high flow (1)
Once/3 months Once/ day 4
Ventilation exhaust duct (1)
Once/3 months Once/ day i
Notes:
1.
Ingtially once per month until exposure hours (M as defined on Figure '4.1-1)' are 2.0 X 10 ;'tiiereafter, according to Figuref 4.1-1 with ~an interval not less than 1 month nor more than 3 months. The compilation of instrument failure rate data may include data
]
obtained from other boiling water reactors for whch the same design instrument operates in an environment similar to that of Quad Cities Units 1 and 2.
2.
Functional tests, calibrations, and instrument checks are not' required when these instruments are not required to be operable or tripped.
]
3.
This instrumentation is excepted from the functional test definition. The function test shall consist of injecting a simulated electric signal into the measurement channel.
4.
This instrument channel is excepted from the functional calibrated using simulated electrical signals once everytest definitions and shall be 3 months.
5.
Functional tests shall be performed before each startup with a required frequency not 'to exceed once per week.
Calibrations shall be performed during each startup or during controlled shutdowns with a required frequency not to exceed once per week.
j 6.
The positioning mechanism shall be calibrated every refueling outage.
7.
Logic system functional tests are performed as specified in the applicable section for these sytems.
i 8.
Functional tests shall include verification of operation of, the degraded voltage. 5 i
minute timer and 7 second inherent timer.
- 9.. Verification of the time delay setting of 3 st:' $ 10 seconds shall be performed during each refueling outage.
- 10. Trip units are functionally tested monthly.. A calibration of the. trip unit is to be performed concurrent with the functional testing. Transmitters are calibrated once per j
operating cycle.
l 8502140316 850129 PDR ADOCK 05000254 3.2/4.2 P PDR i
AmendmentNo.JHI,JFI,90 l