Corrected Page 3.2/4.2-17 to Amend 90 to License DPR-29, Incorporating Change from Amend 89 Re Instrument Testing & Calibr
ML20106G291
Person / Time
Site: Quad Cities 
Issue date: 01/29/1985
From:
NRC
To:
Shared Package
ML20106G294 List:
References
NUDOCS 8502140316
Download: ML20106G291 (1)


Text

.. -.

QUAD-CITIES DPR-29 T5BLE 4.2-l' (cont'd)

Instrument' Instrument Func}2;ignal-Instru nj Test l Calibration (2)

Check Channel 2

HPCI_ Isolation 1.

Steam 11ne hign flow (1) (9) (10} <

(9) (10)

None 2.

Steamline area.high temperature Refueling outage

-Refueling outage None 3.

Low reac' tor pressure (1) (10)

(10)

None

. Reactor Building ventilation System Isolation and Standby Treatment System Initiation 1.

Refueling floor radiation (1)

Obce/3' months Once/ day monitors i

Steam Jet Air Ejector Off-Gas Isolation 1.. Off-gas radiation monitors (1) (4)

Refueling outage Once/ day Control Room Ventilation System Isolation 1.

Reactor low water level (1)

Once/3 months Once/ day 2.-

Drywell nigh pressure (1)

Once/3 months None 3.

Main steamline high flow (1)

Once/3 months Once/ day 4

Ventilation exhaust duct (1)

Once/3 months Once/ day i

Notes:

1.

Ingtially once per month until exposure hours (M as defined on Figure '4.1-1)' are 2.0 X 10 ;'tiiereafter, according to Figuref 4.1-1 with ~an interval not less than 1 month nor more than 3 months. The compilation of instrument failure rate data may include data

]

obtained from other boiling water reactors for whch the same design instrument operates in an environment similar to that of Quad Cities Units 1 and 2.

2.

Functional tests, calibrations, and instrument checks are not' required when these instruments are not required to be operable or tripped.

]

3.

This instrumentation is excepted from the functional test definition. The function test shall consist of injecting a simulated electric signal into the measurement channel.

4.

This instrument channel is excepted from the functional calibrated using simulated electrical signals once everytest definitions and shall be 3 months.

5.

Functional tests shall be performed before each startup with a required frequency not 'to exceed once per week.

Calibrations shall be performed during each startup or during controlled shutdowns with a required frequency not to exceed once per week.

j 6.

The positioning mechanism shall be calibrated every refueling outage.

7.

Logic system functional tests are performed as specified in the applicable section for these sytems.

i 8.

Functional tests shall include verification of operation of, the degraded voltage. 5 i

minute timer and 7 second inherent timer.

9.. Verification of the time delay setting of 3 st:' $ 10 seconds shall be performed during each refueling outage.
10. Trip units are functionally tested monthly.. A calibration of the. trip unit is to be performed concurrent with the functional testing. Transmitters are calibrated once per j

operating cycle.

l 8502140316 850129 PDR ADOCK 05000254 3.2/4.2 P PDR i

AmendmentNo.JHI,JFI,90 l