Clarifies Deficiency Re Honeycomb Concrete Around Watertight Doors in Auxiliary Bldg.Concrete Surrounding Door R-1-8 Removed.Area Will Be Regrouted Following Successful Insp. Remaining Doors Unevaluated
ML20106E752
Person / Time
Site: Fermi 
Issue date: 10/11/1984
From: Jens W
DETROIT EDISON CO.
To: James Keppler, Wells J
DUKE POWER CO., NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
EF2-71993, NUDOCS 8410300105
Download: ML20106E752 (2)


Text

'

f-r-

.,U a

g

[I C ayne H. Jen.2

(.

Vice Pres. dent i'

NxWar Opraons

,i

,\\

i scytn o... Hymay cm new wnym 4ame October 11, 1984 IQ VII m3)s*mo EF2-71993 a

Mr. James G. Keppler Regional Administrator Region III

(

U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. James R. Wells Duke Power Company Management and Technical Services 422 South Church Street Charlotte, N.C.

,\\>

Gentlemen

Reference:

(1)

Fermi 2 NRC Cocket No. 50-341 (2)

Letter from Duke Power Company'tc Detroit Edison, " Comments to DECO Response to Final Report", dated September 25, 1984.

(3)

Detroit Edison letter to NRC a4d Dike Power Company, " Response to Reccnmtadations Arising from Duke Power Report on Pinal Assessment of Construction"i EF2-72247, dated September 20, 1984.

'.'i (4)

Detroit Edison letter to NRC, "Transuittal of Duke Power Letter," EF2-72279, dated October 4, 1984.

Subject:

Response to Pending Duke Power Concern The comment on page 2 of Reference 2 (forwarded to NRC via Reference 4) correctly noted that no reference wdu made to the honeycomb concrete around one of the watertit;ht dotrs.

An NCR was issued on 7/16/84 identifying the honeycomb around door R-1-8 and was subsequently dispositioned on 7/18/84.

The disposition required chipping out the defective concrete around the door and then performini a QA/ Engineering inspection.

After a successful inspectioni j

the area will be grouted.

In addition to cadre,ctiol of door R-1-8, the NCR disposition requires soundinJ tre concrete around all remaining doors in the Auxiliary Buildincl for volds.

If more voids are found, the NCR requirec\\0.cther reevaluation and corrective action.

i 8410300105 041011 007 N PDR ADOCK 05000341 d

q 8

PDR

/y i0o

n. -

-p.

' it -

, 0

,r' 1

J,

s \\.'

v E',

go +,

+

t

.$.,N'

%,c, h,, & j,'. -h' y

,),"',

n ',,

. */'c Q

n v.ic, ' '

,4 0,% /

),3 f.

>L; g'

r k'.

N

.. r t,

P Y

.,.'(Wt. Vanes G. Keppler N

^

y,

)h

h. ' g, cls "

i.;'f 4 BF2,7199 3

') s-4

'roetober 11, 1984 y

Tj,

, f,'

' h

/'y

( Page 2 s

s Q>'

/

,p' o

u.y j,

g.

. l ' is fitated on page%?, of'Refhrence 3,*the+ Detroit Edison

't'

' ireport influded only the responses to the Duke Assessment team reccmmendationn, although Edison has also taksn action 4.

to respond to anch isf,the other findings and concerns, as is d,

's the case.for this d W u.,ghis reply'should respond to this concern.

1, t't

.5 If.you should han.o -anyIurther questions,s.(pruase contact

.c J

Mr.,0. Keener Eerle at (313) 586-4211.

%)

r

\\1, SinceN*ly','.

1 4'c 1

,,i I'

)gh, i

y ' ;)

/

(

A

.[

1;

,y.

t i, S, cc:

Mr.

P_. M. Byrhn y

Mr. R. C. DeYoung Mr. T. P. Gv/nn (Resident Inspector --

'h Clinton Power Plant) i j

i

, >P6 R. C. 7nop -

jd

. (.

Mr'. M. D. L'/nch,

+'

+

UM1RO, Decuyent' Control Desk

'Asshington, D.C.

T.0555 i

/

  • j s

3, 4

a l

9 4

1 U

t, s

i n

s f

\\

4 J

k s

i I

\\

-