Discusses 840913 Meeting Re Resumption of Safety Review for Ol.Timely Completion of Project,Including NRC Reviews Needed for Issuance of License,Of Great Importance
NOC-AE-000597, Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-05
NOC-AE-000582, Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports
ML20210F385
NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000
NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl
NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr
NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)
ML20210L146
ML20211B788
ML20211A950
ML20210U127
ML20212A439
ML20211F503
ML20211F442
NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481
NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)
ML20211J251
ML20212A435
NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)
IR 05000498/1999014
ML20211P767
ML20211P820
NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)
ML20211P787
IR 05000498/1999012
ML20216F547
ML20212D917
05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER
NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P
NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl
NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997
ML20212F211
ML20212E909
ML20212F179
ML20212J065
NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr
ML20212J714
05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment
NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr
ML20212L165
ML20217C322
NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)
NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future
NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)
NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule
ML20217K934
ML20217K909
NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)
NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan
NOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested
NOC-AE-000530, Requests Relief from ASME Section XI Code Requirements of Subsection Iwf Applicable to Determining Component Supports Subject to Exam & Establishing Exam Requirements for Component Supports,Per 10CFR50.55a(a)(3)(i)
NOC-AE-000544, Forwards Errata Pages for Proprietary Rev 2,Addendum 1 to WCAP-13698 & non-proprietary Rev 2,Addendum 1 to WCAP-13699 Versions of Laser Welded Sleeves for 3/4 Inch Diameter Tube Feedring Type & W Preheater.... Proprietary Rept Withheld
NOC-AE-000540, Forwards Response to NRC 990317 RAI Re Proposed Amend to TS to Reflect Replacement SG Rc Flow Difference.Four Oversize Proprietary Drawings to Show Removed Rv Head Flow Nozzles & Fuel Assembly Thimble Plugging Devices,Encl
ML20207D996
NOC-AE-000545, Forwards Response to NRC 990416 RAI Re Util Proposed Amend on Operator Action for Small Break Loca, .Draft EOP Re Small Break Loca,Encl to Aid Discussion of Proposed Amend
NOC-AE-000499, Forwards Relief Request RR-ENG-2-3,proposing to Perform Alternative Ultrasonic Examination from Outside Surface of Skirt Attachment Weld as Described in Encl,In Lieu of Surface Examination from Inside Pressurizer Skirt
NOC-AE-000502, Forwards Relief Request RR-ENG-2-6,proposing That Boroscopic VT-1 Visual Examination Be Allowed as Alternative to Section XI Surface Examination of Pump Casing Welds,Or Portions of Welds within Pits
NOC-AE-000500, Forwards Relief Request RR-ENG-2-4,proposing to Perform Alternative Ultrasonic Examination from Outside & End Surfaces of Reactor Vessel Closure Head Nuts,As Described in Encl in Lieu of Surface Examination of Threaded Region
NOC-AE-0559, Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change
NOC-AE-000561, Forwards Change QA-042 to Operations QAP, Rev 13, Reflecting Current Organizational Alignment for STP & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months
NOC-AE-000548, Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence
NOC-AE-000565, Forwards Amended Pages for Insertion Into South Texas Project Nuclear Operating Co Previously Submitted Response to NRC Rai.New Pages Include Expanded Answer to Question 4.b
NOC-AE-000512, Responds to NRC 981201 Telcon Re Jco 93-0004,per Revised MSLB Analysis
NOC-AE-000560, Forwards LER 99-S02-00,re Failure to Maintain Positive Control of Vital Area Security Key.Licensee Commitments Are Found in Corrective Action Section of LER
NOC-AE-000571, Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls
NOC-AE-000541, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Npps. Readiness Disclosure for STP, Encl
NOC-AE-000574, Forwards ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests Performed Between 971004 & Completion of Eighth RO on 990428
NOC-AE-000557, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of App III,III-3410 for Second ISI Interval.Proposed Alternatives for Ultrasonic Exam of Piping Sys Welds,Attached
NOC-AE-000498, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements Applicable to SG Main Steam Nozzle inside- Radius Sections.Attachment Includes Discussion of Basis & Justification for Request & Implementation Schedule
NOC-AE-000573, Requests Relief from Requirements of ASME Section XI Code Case N-498,exempting Isolated Class 1 Reactor Vessel Head Vent Atmospheric Vent Piping & Valve from Being Tested at Full RCS Pressure
NOC-AE-000580, Forwards Response to NRC 990415 RAI Re Implementation of Commitments Related to GL 89-10, Safety-Related MOV Testing & Surveillance & GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs
NOC-AE-000536, Submits Request for Exemption from Requirements of 10CFR50.34(b)(11),10CFR50,App A,Gdc 2 & 10CFR100,App a, Section VI(a)(3) Re Maint of Seismic Instrumentation.Revised Page to Procedure OERP01-ZV-IN01 Included
NOC-AE-000518, Requests Exemption from Various Special Treatment Requirements of 10CFR50,as Described in Encls to Ltr.Stp Believes That Pilot Application Will Assist NRC in Development & Implementation of risk-informed 10CFR50
NOC-AE-00586, Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data
NOC-AE-000595, Forwards Chapters 1.0 & 16.0 to Operations QA Plan for South Texas Project.Rev Is Strictly Administrative & All Content Was Previously Submitted to NRC on 990503 & 990615
NOC-AE-000598, Forwards Four Copies of 1RE08 Refueling Outage ISI Summary Rept for Steam Generator Tubing
NOC-AE-000597, Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-05
NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000
NOC-AE-000582, Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports
NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr
NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl
NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)
NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481
NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)
NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)
NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)
05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER
NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl
NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P
NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997
NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr
05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment
NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr
NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)
NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future
NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)
NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule
NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)
NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan
NOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested
Congregg of tIje Wnittb 6tates Jpouse of 3tepresentatibeg f
Wasfj(ngtott,D.C. 20515 September 25, 1984 1
l i
t Mr. Nunzio J. Palladino
. Chairman U.S. Nuclear Regu'latory Commissio'n Washington,D.C.l 20555 i
's
Dear Chairman Palladino:
~ 'T l
~~L On September 13, I was able to spend somAltime-at-~thE 'ww.
meeting on the resumption of the safety review for _he operatindl license being sobght by the South Texas Nuclear Project.
As i
~ you know, the Sobth Texas Nuclear Project is a joint project i
of Houston Lighting & Power Company, Central Power & Light, the City of San Antonio, and the City of Austin.
j q
From a quick look around the room, I could see Congressional {\\
I r---
\\ interest and support from Texas Members of Congress.
Nottonly A
was I there personally, accompanied by my AdministrativeVAssistant,h Charles Simpson, I noted the presence of Congressional staff:fromT.}
thd' offices of Jack Fields, Kent Hance, Jack Hightower,. Mickey' Leland and Bill Patman.
It would appear that we all sharejthe3. [
commodsview that timely completion of the project, including' j
completion of the NRC reviews needed for the issuance of a'1' yp i license, is of great ~importance to our community.
\\
g 5,,
I 6 The 5ssurances by Mr.l ~arrell Eisenhut, Director of the )V' D
NRC Division of' Licensing, thao the NRC will proceed with th5 reviews in a manner that will result in the issuance of,the i
~
draft Safety Evaluation Report,by May 1985 (a date consistent with the licensing schedule in(the current NRC report"to commitment of the NRC to apply appropriate manpow$y,that the Congress:aan Beville) were heartening.
We realize r to this task is the key to timely completion of the licensing'/ review and appreciate the dedication and cooperative spirit shown by your staff.