Advises That Installation of Mods to Degraded Voltage Protection for Emergency Ac Power Sys Will Be Scheduled During Fourth Quarter 1986 Refueling Outage
ML20106D617
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/23/1984
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
JPN-84-71, NUDOCS 8410260075
Download: ML20106D617 (2)


Text

123 Main Street

, WNte Plmns. New York 10601

. 014 681.6200 4 NewVo.rkPbwer =  ::: n _

tv Authonty -c-October 23, 1984 JPN-84-71 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. Domenic B. Vassallo Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Degraded Voltage Protection for Emergency A-C Power System

References:

1. NRC letter, R. W. Reid to G. T. Berry, dated June 3, 1977 regarding same subject.
2. PASNY letter, G. T. Berry to R. W. Reid, dated October 17, 1977 (JNRC-77-2) transmits description of proposed modifications and draft Technical Specification changes.
3. NRC letter, D. B. Vassallo to J. P. Bayne, dated September 14, 1984 transmits Technical Evaluation Report and associated Safety Evaluation.

Dear Sir:

In Reference 1, you requested that the Authority evaluate the susceptibility of the safety-related electrical system at our James A. FitzPatrick Nuclear Power Plant to a sustained degradation in voltage of offsite power sources. The Authority proposed (Reference 2) plant modifications and Technical Specification changes to conform to the positions stated in Reference 1. In this same letter, we scheduled the completion of these modifications for eighteen (18) months after NRC approval.

8 8410260075 841023 PDR ADOCK 05000333 F pop

'Ia..

6 Attached to Reference 3 was a Technical Evaluation Report and the. associated Safety Evaluation on the proposed modifications;

.both documents concluded that these modifications are acceptable.

We.have scheduled these modifications for installation during the 1986 Refueling outage. This outage is currently scheduled for the fourth quarter of 1986.'

Please contact Mr. J. A. Gray, Jr. of my staff if you have any questions.

Very truly yours,

.J . ayne f_ .

First Executive Vice President Nuclear Generation cc: Office of the Resident Inspector U.S. Nuclear. Regulatory Commission P.O. Box 136