ML20106D274
| ML20106D274 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 10/05/1992 |
| From: | Reynolds N WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WINSTON & STRAWN |
| To: | Bloch P, Bright G, Schink D Atomic Safety and Licensing Board Panel, TEXAS A&M UNIV., COLLEGE STATION, TX |
| References | |
| CON-#492-13259 OL, NUDOCS 9210090077 | |
| Download: ML20106D274 (1) | |
Text
.
j% z.57 -
WINSTON & STlMWN vx
- FREDERICK H WHSTON 08511886) thnC 1400 L STREET. N W.
SitAS H STFtAWN tiets.194si cpoco once W-
'INGTON. DC. 20005-3502 as west mcura parve
- CHICA30 TLLINOst 50A01 (202) 371 5700 FACSMILE (202) 371 $950.
[
~
e,r:
3-wwmaxwu= =-
October 5, 1992 HW"
"'~
Peter B.'Bloch, Esquire David R..Schink Chairman, Atomic Safety and Department-of Oceanography Licensing Board.
Texas A&M University-U.S. Nuclear Regulatory College Station,. Texas 77843 Commission-Washington, D.C.
205b5 Mr. Glenn O.
Bright Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Subj:
Washington Public Power Supply System (WPPSS_ Nuclear Project No. 1) Docket Nou50-460-OL Gentlemen:
In accordance with the October 14, 1983', Memorandum and Ord.er in the captioned proceeding, the Washington Public Power Supply System hereby submits its quarterly status report-
~
regarding construction activities at WNP-1.
During'the third quarter of 1992 no significant safety-related constraction activities were p,erformed at.WNP-1,falthough a limited engineering. effort was continuing.. We do not anticipate any change in-this level of activity during the next several months.
Since efly,3 i
t 1
i i(
.- Nicholas, t..
ynolds n
counsel 'or fA plicant cc:
Service List
?
t l.
9210090077 921005
.pi
- PDR--ADOCK 0500 0
G c
. ~ - - - - -..,
... _,,,,,. - -.,